Housing violations · Kingsbridge Heights-Van Cortlandt Village
2775 Kingsbridge Terrace, Bronx
10463 · 74 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster22
- Lead paint21
- Other repairs12
- Mice or rats7
- Roaches6
- Broken doors or locks6
- Plumbing, sinks and toilets3
- Leaks and water damage3
- No heat or hot water2
- Electrical problems2
- Mold2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 130 closed · NYC typical: 87 days
from 215 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective voice to buzzer building intercom system from building vestibule to apartmentIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19359779
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19359780
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective caulking at bathtub in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19359782
- COther repairsProperly repair or replace the broken or defective spring balance lower sash at fire escape window in the 1st room from east at northIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19359781
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19338353
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19338356
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 30, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19338352
- BElectrical problemsProperly repair or replace the broken or defective 1st electrical outlet from west at north wall in the 1st room from eastIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19338355
- BElectrical problemsProperly repair or replace the broken or defective 1st electrical outlet from east at south wall in the 1st room from eastIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19338354
- COther repairsProperly repair or replace the broken or defective spring balance at lower window sash creating guilatine effect at 1st window from south at west wall at…Issued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19338358
- COther repairsFire escape defective. replace with new the broken, defective and/or missing broken 5th tread up from bottom at 1st fire escape from east at north exterior…Issued Oct 30, 2026 · fix by Nov 5, 2026 overdue · rent impairing · Violation #19338357
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling at public hall, 6th story, section ''a''Issued Oct 13, 2026 · fix by Nov 17, 2026 · rent impairing · Violation #19296291
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at west wall at bulkhead at public hall, 6th story, section ''a''Issued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19296285
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 1st storyIssued Oct 13, 2026 · fix by Oct 27, 2026 overdue · Violation #19296300
- BBroken doors or locksProperly repair or replace the broken or defective latch set and its assemblies at building entrance door at public hall, 1st storyIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19296301
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 4, 2026 · fix by Jun 30, 2026 overdue · Violation #18975450
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 28, 2025 · fix by Dec 24, 2025 overdue · Violation #18442528
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 28, 2025 · fix by Dec 24, 2025 overdue · Violation #18442527
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 24, 2025 · fix by Dec 20, 2025 overdue · Violation #18394991
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18394992
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 24, 2025 · fix by Dec 18, 2025 overdue · Violation #18440325
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq.ft at east wall and ceiling in the bathroomIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18394986
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 24, 2025 · fix by Dec 18, 2025 overdue · Violation #18440321
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 24, 2025 · fix by Dec 18, 2025 overdue · Violation #18440322
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 24, 2025 · fix by Dec 18, 2025 overdue · Violation #18440323
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Nov 24, 2025 · fix by Dec 18, 2025 overdue · Violation #18440324
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Sep 4, 2025 · fix by Sep 28, 2025 overdue · Violation #18208698
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 4, 2025 · fix by Sep 28, 2025 overdue · Violation #18208697
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Jul 10, 2025 · fix by Jul 16, 2025 overdue · Violation #18076836
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from eastIssued Jun 12, 2025 · fix by Jul 17, 2025 overdue · Violation #18009316
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Mar 28, 2025 · fix by Apr 21, 2025 overdue · Violation #17793910
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 28, 2025 · fix by Apr 21, 2025 overdue · Violation #17793909
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 28, 2025 · fix by Apr 21, 2025 overdue · Violation #17793908
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 28, 2025 · fix by Apr 21, 2025 overdue · Violation #17793916
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the private hallwayIssued Mar 28, 2025 · fix by May 2, 2025 overdue · Violation #17787070
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Mar 28, 2025 · fix by May 2, 2025 overdue · Violation #17787068
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Mar 28, 2025 · fix by May 2, 2025 overdue · Violation #17787067
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 28, 2025 · fix by Apr 21, 2025 overdue · Violation #17793915
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 3rd room from north at westIssued Mar 28, 2025 · fix by May 2, 2025 overdue · Violation #17787066
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 28, 2025 · fix by Apr 21, 2025 overdue · Violation #17793914
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 28, 2025 · fix by Apr 21, 2025 overdue · Violation #17793912
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 28, 2025 · fix by Apr 21, 2025 overdue · Violation #17793907
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 28, 2025 · fix by Apr 21, 2025 overdue · Violation #17793906
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from northIssued Mar 28, 2025 · fix by May 2, 2025 overdue · Violation #17787065
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 28, 2025 · fix by Apr 21, 2025 overdue · Violation #17793905
- BPlumbing, sinks and toiletsRepair the broken or defective connection waste line at sink in the kitchenIssued Mar 28, 2025 · fix by May 2, 2025 overdue · Violation #17787069
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Mar 28, 2025 · fix by Apr 21, 2025 overdue · Violation #17793918
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 28, 2025 · fix by Apr 21, 2025 overdue · Violation #17793917
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the foyerIssued Mar 28, 2025 · fix by May 2, 2025 overdue · Violation #17787071
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 14, 2025 · fix by Apr 9, 2025 overdue · Violation #17761356
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the foyerIssued Mar 14, 2025 · fix by Apr 18, 2025 overdue · Violation #17761341
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Mar 14, 2025 · fix by Apr 18, 2025 overdue · Violation #17761365
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Mar 14, 2025 · fix by Apr 18, 2025 overdue · Violation #17761345
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 14, 2025 · fix by Apr 9, 2025 overdue · Violation #17761357
- BOther repairsProperly repair or replace the broken or defective base cabient at south wall in the kitchenIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · Violation #17746849
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 10, 2025 · fix by Apr 3, 2025 overdue · Violation #17753262
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 10, 2025 · fix by Apr 5, 2025 overdue · Violation #17746848
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeds the maximum allowable operating temperature of 130 fahrenheit (137 f found). in the entire…Issued Oct 8, 2024 · fix by Oct 14, 2024 overdue · Violation #17328691
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 8, 2024 · fix by Nov 1, 2024 overdue · Violation #17338796
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 27, 2024 · fix by Mar 24, 2024 overdue · Violation #16699057
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.