Housing violations · Longwood
1075 Longfellow Avenue, Bronx
10459 · 46 apartments · 6 stories · City Council district 17
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
10 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks29
- Peeling paint and plaster26
- Other repairs23
- Leaks and water damage15
- Missing smoke or CO detector10
- Plumbing, sinks and toilets9
- No heat or hot water9
- Roaches6
- Mold6
- Mice or rats5
- Lead paint3
- Electrical problems2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 19 closed · NYC typical: 87 days
from 15 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsRemove all encumbrances consisting of construction material at bulkhead , 6th storyIssued Nov 4, 2026 · fix by Dec 9, 2026 · rent impairing · Violation #19348758
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19338700
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19338701
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at south wall in the 4th room from eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19338702
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective countertop at sink base cabinet in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19338703
- CMoldTrace and repair the source and abate the visible mold condition more than 30sq ft observed at south wall and window frames in the 4th room from eastIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19338699
- BOther repairsProperly repair with similar material the broken or defective fire retardent matrial at ceiling at public hall, 3rd storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322066
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft but less than 30 sq ft at ceiling observed in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322064
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19322065
- CNo heat or hot waterProvide ready access to buildings heating system adequate hot water no access to boiler room at boiler roomIssued Oct 23, 2026 · fix by Oct 29, 2026 overdue · Violation #19319335
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19153457
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19128677
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household hold items at 3rd story balcony at south exteior wall at…Issued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19117457
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Aug 6, 2026 · fix by Aug 6, 2026 overdue · rent impairing · Violation #19117458
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Aug 6, 2026 · fix by Aug 12, 2026 overdue · Violation #19117456
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Aug 6, 2026 · fix by Aug 6, 2026 overdue · rent impairing · Violation #19117455
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19021180
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19021179
- BOther repairsRepair the broken or defective connection at water supply line at water closet in the bathroomIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18966994
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18966995
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18966996
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 1, 2026 · fix by Jun 27, 2026 overdue · Violation #18966992
- COther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods fully extended at second stack from north at west exterior wall…Issued Jun 1, 2026 · fix by Jun 7, 2026 overdue · rent impairing · Violation #18966997
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling and all walls in the bathroomIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18776503
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 26, 2026 · fix by Mar 4, 2026 overdue · Violation #18668616
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 11, 2026 · fix by Feb 11, 2026 overdue · rent impairing · Violation #18634706
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18634707
- COther repairs& 309 m/d law abate the nuisance consisting of broken soap dish at north wall creating a cut hazard in the bathroomIssued Feb 6, 2026 · fix by Feb 12, 2026 overdue · Violation #18622012
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 6, 2026 · fix by Feb 12, 2026 overdue · Violation #18622011
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 6, 2026 · fix by Feb 6, 2026 overdue · rent impairing · Violation #18622009
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 6, 2026 · fix by Mar 4, 2026 overdue · Violation #18622010
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from northIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18484601
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 8, 2025 · fix by Jan 3, 2026 overdue · Violation #18484599
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 8, 2025 · fix by Jan 3, 2026 overdue · Violation #18484618
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 8, 2025 · fix by Jan 3, 2026 overdue · Violation #18484596
- BLeaks and water damageRepair the leaky and/or defective faucets faucet at bathtub in the bathroomIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18484608
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 8, 2025 · fix by Jan 3, 2026 overdue · Violation #18484600
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from northIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18484610
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18484611
- BLeaks and water damageRepair the leaky and/or defective faucets faucet at sink in the kitchenIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18484613
- BOther repairsProperly repair or replace the broken or defective rubber gasket seal at refrigerator in the kitchenIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18484615
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 8, 2025 · fix by Jan 3, 2026 overdue · Violation #18484617
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Dec 8, 2025 · fix by Dec 22, 2025 overdue · Violation #18484616
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from northIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18484598
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from eastIssued Nov 14, 2025 · fix by Nov 14, 2025 overdue · rent impairing · Violation #18367409
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the 4th room from eastIssued Nov 14, 2025 · fix by Nov 14, 2025 overdue · rent impairing · Violation #18367411
- CBroken doors or locksProvide ready access to buildings heating system boiler room door locked at boiler roomIssued Nov 14, 2025 · fix by Nov 20, 2025 overdue · Violation #18367410
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 29, 2025 · fix by Nov 24, 2025 overdue · Violation #18327046
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18152117
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18152118
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18152119
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall inside closet in the 4th room from eastIssued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #17978432
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #17978428
- COther repairsProperly repair with similar material the broken or defective lifting wood floor, creating trip hazard in the 3rd room from eastIssued Jun 13, 2025 · fix by Jun 19, 2025 overdue · Violation #17978426
- BBroken doors or locksProperly repair or replace the broken or defective latch at door from vestibule to 1st sty south section at public hallIssued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #17978435
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic soap dish at bathtub in the bathroomIssued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #17978433
- BBroken doors or locksProperly repair or replace the broken or defective wood door in the bathroomIssued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #17978427
- BBroken doors or locksProperly repair or replace the broken or defective warped wood closet doors in the 4th room from eastIssued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #17978431
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the 4th room from eastIssued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #17978430
- BBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door (section a-c) , 1st story, section ''d-f''Issued Jun 10, 2025 · fix by Jul 15, 2025 overdue · Violation #17974538
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.