Housing violations · University Heights (South)-Morris Heights
1820 Loring Place South, Bronx
10453 · 73 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster37
- Other repairs17
- Mice or rats14
- Roaches12
- Lead paint9
- Missing smoke or CO detector8
- Leaks and water damage6
- Broken doors or locks5
- Electrical problems4
- Plumbing, sinks and toilets4
- Mold4
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 56 closed · NYC typical: 87 days
from 17 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19359815
- CElectrical problems& 309 m/d law abate the nuisance consisting of extention cord going from range to outlet on south wall in the kitchenIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19359813
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19359816
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19359814
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19335120
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19335118
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19335117
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19335116
- BOther repairsProperly repair or replace the broken or defective spring balance at upper and lower window sash, 2nd window at south from east in the 2nd room from eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19335115
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19335119
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 22, 2026 · fix by Oct 16, 2026 overdue · Violation #19241092
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 22, 2026 · fix by Oct 18, 2026 overdue · Violation #19232718
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in drain line at washbasin in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · rent impairing · Violation #19232717
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq. ft. at south wall and east wall in the 1st room from east at southIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232713
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq. ft. at all walls and ceiling in the bathroomIssued Sep 22, 2026 · fix by Oct 18, 2026 overdue · Violation #19232708
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 22, 2026 · fix by Oct 16, 2026 overdue · Violation #19241089
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 22, 2026 · fix by Oct 16, 2026 overdue · Violation #19241090
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 22, 2026 · fix by Oct 16, 2026 overdue · Violation #19241091
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 5, 2026 · fix by May 31, 2026 overdue · Violation #18850244
- BPlumbing, sinks and toiletsReplace the broken or defective or missing sink in the kitchenIssued May 5, 2026 · fix by Jun 9, 2026 overdue · rent impairing · Violation #18850243
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 23, 2026 · fix by May 17, 2026 overdue · Violation #18814488
- BOther repairsProperly repair or replace the broken or defective lower window sash spring balances in the kitchenIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18808420
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 23, 2026 · fix by May 19, 2026 overdue · Violation #18808419
- BPlumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at sink in the kitchenIssued Apr 23, 2026 · fix by May 28, 2026 overdue · rent impairing · Violation #18808418
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 23, 2026 · fix by May 17, 2026 overdue · Violation #18814490
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 23, 2026 · fix by May 17, 2026 overdue · Violation #18814487
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Apr 23, 2026 · fix by May 17, 2026 overdue · Violation #18814489
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq feet at walls in the 1st and 2nd closets from east at south in the foyerIssued Mar 17, 2026 · fix by Apr 21, 2026 overdue · Violation #18723369
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of household items and furniture blocking egress through fire escape window in the 1st room from east at northIssued Dec 22, 2025 · fix by Dec 28, 2025 overdue · Violation #18518166
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 22, 2025 · fix by Jan 17, 2026 overdue · Violation #18518165
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 22, 2025 · fix by Jan 17, 2026 overdue · Violation #18518164
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Dec 2, 2025 · fix by Jan 6, 2026 overdue · Violation #18480665
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Dec 2, 2025 · fix by Dec 16, 2025 overdue · Violation #18480663
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Dec 2, 2025 · fix by Jan 6, 2026 overdue · Violation #18480666
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 10, 2025 · fix by Dec 6, 2025 overdue · Violation #18355575
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 10, 2025 · fix by Dec 6, 2025 overdue · Violation #18355574
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq. ft. but less than 30 sq ft at ceiling around window casing in the bathroomIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18172287
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18172288
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st private hallway from eastIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18172293
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd private hallway from eastIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18172318
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the 3rd room from northIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18172391
- BOther repairsProperly repair or replace the broken or defective three-prong outlit at north wall in the 3rd room from northIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18172394
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 2nd room from east at northIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18172399
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the kitchenIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18172401
- BOther repairsAbate the nuisance consisting of pests. evidence of live flies in the entire apartmentIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18172403
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 31, 2025 · fix by Aug 26, 2025 overdue · Violation #18127427
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, ceiling, east wall, north wall in the kitchenIssued Jul 23, 2025 · fix by Aug 27, 2025 overdue · Violation #18095186
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, south wall, east wall in the 2nd room from northIssued Jul 23, 2025 · fix by Aug 27, 2025 overdue · Violation #18095182
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 23, 2025 · fix by Aug 18, 2025 overdue · Violation #18095202
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 23, 2025 · fix by Aug 18, 2025 overdue · Violation #18095203
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jul 23, 2025 · fix by Aug 27, 2025 overdue · Violation #18095201
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall in the 1st room from north at westIssued Jul 23, 2025 · fix by Aug 27, 2025 overdue · Violation #18095197
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east wall in the foyerIssued Jul 23, 2025 · fix by Aug 27, 2025 overdue · Violation #18095194
- COther repairsReplace with new the missing fire retardant material at all walls and the ceiling in the 1st room from north at eastIssued Jun 13, 2025 · fix by Jun 19, 2025 overdue · Violation #18024663
- COther repairsReplace with new the missing fire retardant material at all walls and the ceiling in the 1st room from north at eastIssued Jun 13, 2025 · fix by Jun 19, 2025 overdue · Violation #18024654
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall and the ceiling, west wall, ceiling in the kitchenIssued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #17939502
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 11, 2025 · fix by Jul 7, 2025 overdue · Violation #17939506
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at the east wall in the 1st room from north at westIssued Jun 11, 2025 · fix by Jul 16, 2025 overdue · Violation #17939505
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17847287
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at northIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17847283
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.