Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Eastchester-Edenwald-Baychester

3454 Fenton Avenue, Bronx

10469 · 16 apartments · 5 stories · City Council district 12

By · Updated · Data from NYC HPD

C
14open immediately hazardous violations · 88 per 100 apartments
B4Hazardous, open
A11Non-hazardous, open
!29Past the fix-by date

On average, NYC buildings have 19.7 open class C violations per 100 apartments. This building has more.

Open in Google Maps ↗

Who owns and manages it

Owning companyEastchester Heights property owner LLC
Landlord (head officer or owner)Andrew Schwartz

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    5
  2. Roaches
    5
  3. Broken doors or locks
    4
  4. Peeling paint and plaster
    4
  5. Lead paint
    3
  6. Missing smoke or CO detector
    2
  7. Mold
    2
  8. Plumbing, sinks and toilets
    2
  9. Leaks and water damage
    1
  10. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C76 days
from 1 closed · NYC typical: 84 days
B76 days
from 3 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Aug 10, 2026 · fix by Aug 16, 2026 overdue · Violation #19121182
  • C
    RoachesAbate the infestation consisting of roaches at public hall, 2nd storyIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19121178
  • C
    MoldTrace and repair the source and abate the visible mold condition more than 30 sq ft of mold at all walls and ceiling in the 4th room from northIssued Dec 8, 2025 · fix by Jan 3, 2026 overdue · Violation #18489316
  • C
    MoldTrace and repair the source and abate the visible mold condition more than 30 sq ft at all walls and ceiling in the 3rd room from northIssued Dec 8, 2025 · fix by Jan 3, 2026 overdue · Violation #18489315
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at wash basin in the bathroomIssued Sep 9, 2024 · fix by Oct 14, 2024 overdue · Violation #17252876
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 9, 2024 · fix by Oct 5, 2024 overdue · Violation #17252875
  • B
    Plumbing, sinks and toiletsProperly secure the loose at wash basin in the bathroomIssued Sep 9, 2024 · fix by Oct 14, 2024 overdue · Violation #17252874
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 30, 2023 · fix by Nov 25, 2023 overdue · Violation #16343521
  • B
    Broken doors or locksProperly repair or replace the broken or defective door in the 3rd room from north at eastIssued Oct 30, 2023 · fix by Dec 4, 2023 overdue · Violation #16343523
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 17, 2022 · fix by Sep 12, 2022 overdue · Violation #15320098
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 17, 2022 · fix by Sep 10, 2022 overdue · Violation #15320959
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 17, 2022 · fix by Sep 10, 2022 overdue · Violation #15320960
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 17, 2022 · fix by Sep 10, 2022 overdue · Violation #15320961
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 17, 2022 · fix by Sep 21, 2022 overdue · Violation #15320096
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 17, 2022 · fix by Sep 12, 2022 overdue · Violation #15320097
  • C
    RoachesAbate the infestation consisting of roachesIssued Jul 25, 2022 · fix by Aug 20, 2022 overdue · Violation #15278093
  • C
    Broken doors or locksProperly repair the broken or defective lock and assembley at building entrance , 1st storyIssued May 13, 2021 · fix by May 19, 2021 overdue · Violation #14333480
  • C
    Other repairsProperly repair the broken or defective wood floor buckled and missing in the 2nd room from northIssued Jul 21, 2020 · fix by Jul 27, 2020 overdue · Violation #13730300

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

32020
12021
82022
92023
32024
22025
92026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 43 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 19, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.