Housing violations · Eastchester-Edenwald-Baychester
3458 Fenton Avenue, Bronx
10469 · 15 apartments · 5 stories · City Council district 12
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint6
- Other repairs3
- Mold3
- Roaches3
- Missing smoke or CO detector2
- Peeling paint and plaster1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 26 closed · NYC typical: 87 days
from 19 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19141363
- BOther repairsProperly repair with similar material the broken or defective counter balance lower sash window in the kitchenIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19141372
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19141361
- COther repairsProperly repair or replace the broken or defective inner glass pane of lower sash at window to east rear yard at public hall, 1st storyIssued Jun 22, 2026 · fix by Jun 28, 2026 overdue · Violation #19014216
- COther repairsProperly repair with similar material the broken or defective ceramic tiles at north and west wall in the bathroomIssued Jun 22, 2026 · fix by Jun 28, 2026 overdue · Violation #19014214
- BMoldTrace and repair the source and abate the visible mold condition mold 4 sq. ft. less then 10 sq. ft. closet from east at south wall in the private hallwayIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17707355
- BMoldTrace and repair the source and abate the visible mold condition mold 3sq.ft. less then 10 sq. ft. east wall in the 3rd room from eastIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17707354
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at closet from east at south wall in the private hallwayIssued Jan 27, 2025 · fix by Mar 3, 2025 overdue · Violation #17654728
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 7, 2024 · fix by Nov 2, 2024 overdue · Violation #17325765
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 7, 2024 · fix by Nov 2, 2024 overdue · Violation #17325764
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Sep 30, 2024 · fix by Oct 24, 2024 overdue · Violation #17314686
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 27, 2024 · fix by Oct 21, 2024 overdue · Violation #17309409
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Sep 27, 2024 · fix by Oct 21, 2024 overdue · Violation #17309408
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 27, 2024 · fix by Oct 21, 2024 overdue · Violation #17309410
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 27, 2024 · fix by Oct 21, 2024 overdue · Violation #17309406
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Sep 27, 2024 · fix by Oct 21, 2024 overdue · Violation #17309407
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 24, 2022 · fix by Feb 19, 2022 overdue · Violation #14790534
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 10, 2022 · fix by Feb 5, 2022 overdue · Violation #14762538
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.