Housing violations · Eastchester-Edenwald-Baychester
3494 Seymour Avenue, Bronx
10469 · 14 apartments · 5 stories · City Council district 12
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Mold5
- Peeling paint and plaster5
- Other repairs5
- Leaks and water damage4
- Missing smoke or CO detector2
- Electrical problems1
- Broken doors or locks1
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 1 closed · NYC typical: 87 days
from 1 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 28, 2025 · fix by Jul 2, 2025 overdue · Violation #17918075
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued May 28, 2025 · fix by Jul 2, 2025 overdue · Violation #17918076
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued May 28, 2025 · fix by Jul 2, 2025 overdue · Violation #17918077
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at ceiling west and north wall in the bathroomIssued May 28, 2025 · fix by Jul 2, 2025 overdue · Violation #17918073
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, west and north wall in the bathroomIssued May 28, 2025 · fix by Jul 2, 2025 overdue · Violation #17918074
- BMoldTrace and repair the source and abate the visible mold condition aproximately 3sq.ft at ceiling and west wall in the bathroomIssued Jul 14, 2023 · fix by Aug 18, 2023 overdue · Violation #16103654
- BMoldTrace and repair the source and abate the visible mold condition aproximately 3 sq.ft at west wall in the 4th room from eastIssued May 20, 2022 · fix by Jun 24, 2022 overdue · Violation #15171878
- BMoldTrace and repair the source and abate the visible mold condition at west wall in the 2nd room from eastIssued May 20, 2022 · fix by Jun 24, 2022 overdue · Violation #15171879
- BMoldTrace and repair the source and abate the visible mold condition aproximately 4 sq.ft at north wall in the 4th room from eastIssued May 20, 2022 · fix by Jun 24, 2022 overdue · Violation #15171877
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 2nd room from eastIssued Jan 20, 2022 · fix by Feb 24, 2022 overdue · Violation #14782487
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of at west wall in the kitchenIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14555920
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallwayIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14555922
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14555921
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall behind steam radiator in the 2nd room from east at northIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14555927
- BLeaks and water damageRepair the leaky and/or defective faucets the bathtub in the bathroomIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14555931
- BOther repairsProperly repair with similar material the broken or defective the cearmic tiles all walls in the bathroomIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14555930
- BOther repairsProperly repair with similar material the broken or defective the ceramic tile floor in the bathroomIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14555929
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the private hallwayIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14555923
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 2nd room from east at southIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14555924
- BOther repairsProperly repair with similar material the broken or defective the wood floor in the 3rd room from east at southIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14555925
- BOther repairsProperly repair with similar material the broken or defective the wood floor in the 2nd room from east at northIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14555926
- BOther repairsProperly repair the broken or defective bell buzzer system from building entrance to apartmentIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14555932
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 7, 2021 · fix by Feb 2, 2021 overdue · Violation #13973602
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.