Housing violations · Eastchester-Edenwald-Baychester
3463 Fish Avenue, Bronx
10469 · 9 apartments · 5 stories · City Council district 12
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks7
- Other repairs6
- No heat or hot water2
- Peeling paint and plaster2
- Mold1
- Leaks and water damage1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 9 closed · NYC typical: 84 days
from 2 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Apr 9, 2026 · fix by Apr 15, 2026 overdue · Violation #18769137
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler room, 1st storyIssued Jun 18, 2025 · fix by Jun 24, 2025 overdue · Violation #18036498
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 18, 2025 · fix by Jun 18, 2025 overdue · rent impairing · Violation #18036497
- BOther repairsProvide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day…Issued Jun 18, 2025 · fix by Jul 23, 2025 overdue · Violation #18036499
- BMoldTrace and repair the source and abate the visible mold condition at ceiling and north wall in the 2nd room from eastIssued May 16, 2024 · fix by Jun 20, 2024 overdue · Violation #16984252
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door , 1st storyIssued Apr 26, 2024 · fix by May 2, 2024 overdue · Violation #16925568
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance at public hall, 1st storyIssued Apr 22, 2024 · fix by Apr 28, 2024 overdue · Violation #16916224
- CBroken doors or locksProperly repair or replace the broken or defective heavy duty mortise lock and assembly at door from street to 1st story at public hallIssued Mar 28, 2024 · fix by Apr 3, 2024 overdue · Violation #16771174
- BBroken doors or locksRefit .door in the entranceIssued Jan 17, 2024 · fix by Feb 21, 2024 overdue · Violation #16597890
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective . in the entranceIssued Jan 17, 2024 · fix by Jan 31, 2024 overdue · Violation #16597889
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Jan 17, 2024 · fix by Feb 21, 2024 overdue · Violation #16597886
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Jan 17, 2024 · fix by Feb 21, 2024 overdue · Violation #16597887
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water temperature exceeding over 130 degrees at bathroom and in the kitchenIssued Dec 15, 2023 · fix by Dec 21, 2023 overdue · Violation #16520752
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the 3rd room from eastIssued Nov 27, 2023 · fix by Jan 1, 2024 overdue · Violation #16438045
- BOther repairsProperly repair with similar material the broken or defective wood floor buckling in the 3rd room from eastIssued Nov 27, 2023 · fix by Jan 1, 2024 overdue · Violation #16438044
- BOther repairsProperly repair with similar material the broken or defective raised wooden floor in the 2nd room from northIssued Nov 8, 2023 · fix by Dec 13, 2023 overdue · Violation #16357644
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hopper door at trash chute at public hall, 2nd storyIssued May 1, 2023 · fix by May 15, 2023 overdue · Violation #15948001
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Feb 27, 2023 · fix by Mar 25, 2023 overdue · Violation #15745947
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.