Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Eastchester-Edenwald-Baychester

1320 Hicks Street, Bronx

10469 · 19 apartments · 5 stories · City Council district 12

By · Updated · Data from NYC HPD

C
33open immediately hazardous violations · 174 per 100 apartments
B30Hazardous, open
A24Non-hazardous, open
!60Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyEastchester Heights property owner LLC
Landlord (head officer or owner)Andrew Schwartz

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    23
  2. Broken doors or locks
    14
  3. Mold
    12
  4. Roaches
    9
  5. Other repairs
    9
  6. Leaks and water damage
    6
  7. Lead paint
    6
  8. Mice or rats
    5
  9. No heat or hot water
    1
  10. Plumbing, sinks and toilets
    1
  11. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C38 days
from 22 closed · NYC typical: 87 days
B109 days
from 8 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19360419
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19360418
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of water bugs at floor at public hallIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352044
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper chute door at public hall, 3rd storyIssued Oct 30, 2026 · fix by Nov 13, 2026 overdue · Violation #19333066
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19331785
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 28, 2026 · fix by Nov 21, 2026 · Violation #19337535
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19249007
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 1o square feet at the 1st closet from east at south wall ceiling in the 1st room…Issued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19248994
  • B
    Broken doors or locksRefit door at entrance in the 3rd room from east at southIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19249005
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19249006
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 1o square feet at the north wall and the ceiling in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19248984
  • C
    Lead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Oct 1, 2026 · fix by Oct 25, 2026 overdue · Violation #19267572
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 1, 2026 · fix by Oct 25, 2026 overdue · Violation #19267574
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 1, 2026 · fix by Oct 25, 2026 overdue · Violation #19267575
  • C
    Lead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Oct 1, 2026 · fix by Oct 25, 2026 overdue · Violation #19267576
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2025 · fix by Sep 2, 2025 overdue · Violation #18140133
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 7, 2025 · fix by Sep 2, 2025 overdue · Violation #18140132
  • B
    Broken doors or locksProperly repair or replace the broken or defective closet door at east wall in the 2nd room from east at northIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18140134
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance doorIssued Jul 28, 2025 · fix by Aug 11, 2025 overdue · Violation #18117877
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Jul 28, 2025 · fix by Aug 3, 2025 overdue · Violation #18117883
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued May 12, 2025 · fix by May 18, 2025 overdue · Violation #17884903
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued May 5, 2025 · fix by May 4, 2025 overdue · rent impairing · Violation #17869381
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued May 5, 2025 · fix by May 11, 2025 overdue · Violation #17869382
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17848223
  • B
    MoldTrace and repair the source and abate the visible mold condition more than (10) sq ft at ceiling in the bathroomIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17848222
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17848224
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17848225
  • B
    Plumbing, sinks and toiletsReplace the broken or defective wash basin in the bathroomIssued May 1, 2025 · fix by Jun 5, 2025 overdue · rent impairing · Violation #17848228
  • B
    Other repairsProperly repair or replace the broken or defective lower sash glass at the 1st window from east at south in the 1st room from north at westIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17848229
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued May 1, 2025 · fix by May 25, 2025 overdue · Violation #17867230
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 1, 2025 · fix by May 27, 2025 overdue · Violation #17848227
  • C
    Other repairsReplace the broken or defective water closet tank in the bathroomIssued Feb 13, 2025 · fix by Feb 19, 2025 overdue · rent impairing · Violation #17688835
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Feb 13, 2025 · fix by Feb 19, 2025 overdue · Violation #17688838
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall. in the 3rd room from north at eastIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #14357411
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall and ceiling. in the foyerIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #14357360
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall. in the private hallwayIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #14357326
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak the north wall. in the private hallwayIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #14357325
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall. in the kitchenIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #14357311
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling. in the bathroomIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #14357309
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Nov 20, 2024 · fix by Nov 26, 2024 overdue · Violation #12614844
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at east wall. in the 3rd room from north at eastIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #14357410
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north ,east walls and ceiling. in the 2nd room from east at northIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #14357393
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at east wall. in the 2nd room from east at northIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #14357390
  • B
    Other repairsProperly repair the broken or defective spring balance at lower sash 1st window from east at south in the 2nd room from east at northIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #15758628
  • B
    Other repairsProperly repair the broken or defective window spring balance 1st window from east at south in the kitchenIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #15758622
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Nov 20, 2024 · fix by Nov 26, 2024 overdue · Violation #12614828
  • B
    Other repairsProperly repair the broken or defective spring balance at lower sash 1st window from south at west in the bathroomIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #15758626
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north and west walls in the foyerIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #14549776
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Nov 20, 2024 · fix by Nov 26, 2024 overdue · Violation #14470192
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Nov 20, 2024 · fix by Nov 26, 2024 overdue · Violation #14357464
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north, south and east walls. in the 3rd room from north at westIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #14357454
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at south wall. in the 3rd room from north at westIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #14357443
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 6 sq ft at east baseboard and east wall in the 2nd room from north at eastIssued May 30, 2023 · fix by Jul 4, 2023 overdue · Violation #16017683
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 9, 2023 · fix by Apr 4, 2023 overdue · Violation #15758623
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 9, 2023 · fix by Apr 4, 2023 overdue · Violation #15758624
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 31, 2022 · fix by Nov 26, 2022 overdue · Violation #15451653
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 31, 2022 · fix by Nov 26, 2022 overdue · Violation #15451654
  • C
    MoldTrace and repair the source and abate the visible mold condition on east wall approx. 50 sq. ft. and north wall approx. 15 sq. ft. in the 2nd room from east…Issued May 27, 2021 · fix by Jun 22, 2021 overdue · Violation #14357386
  • C
    MoldTrace and repair the source and abate the visible mold condition on east wall approx. 60 sq. ft. in the 3rd room from north at eastIssued May 27, 2021 · fix by Jun 22, 2021 overdue · Violation #14357407
  • B
    MoldTrace and repair the source and abate the visible mold condition north wall approx.12 sq. ft. east wall approx. 6 sq. ft. south wall approx.8 sq. ft. in the…Issued May 27, 2021 · fix by Jul 1, 2021 overdue · Violation #14357439

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12018
22019
52020
82021
42022
172023
352024
422025
372026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 195 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.