Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Eastchester-Edenwald-Baychester

3448 Wilson Avenue, Bronx

10469 · 14 apartments · 5 stories · City Council district 12

By · Updated · Data from NYC HPD

C
12open immediately hazardous violations · 86 per 100 apartments
B14Hazardous, open
A12Non-hazardous, open
!38Past the fix-by date

On average, NYC buildings have 19.7 open class C violations per 100 apartments. This building has more.

2 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning companyEASTCHESTER HEIGHTS PROPERTY OWNER LLC
Landlord (head officer or owner)Andrew Schwartz

As registered with HPD.

What the city has done here

When a landlord does not fix things, HPD can step in: closer watch, doing repairs itself and billing the owner, and taking the owner to Housing Court.

2Repairs the city did itself
$1,180Billed to the owner for them
0Court cases HPD brought
0Cases tenants brought

Latest city repairs

  • $
    Lead paint removal · $55Lead paintApr 1, 2024 · Details
  • $
    Lead paint removal · $1,125Lead paintJan 17, 2024 · Details

Repairs are HPD emergency repairs marked completed (Open Market Orders and Handyman Work Orders); the dollar amount is what HPD charged, which becomes a lien on the property if unpaid. Sources: NYC Open Data (AEP, OMO, HWO, Housing Litigations) and HPD's 2026 Certification Watchlist.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    11
  2. Broken doors or locks
    7
  3. Other repairs
    6
  4. Lead paint
    4
  5. Roaches
    3
  6. Plumbing, sinks and toilets
    2
  7. Mold
    2
  8. Leaks and water damage
    1
  9. Mice or rats
    1
  10. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C126 days
from 3 closed · NYC typical: 84 days
B82 days
from 1 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Broken doors or locksProperly repair or replace the broken or defective mortise lock at door at building entrance , 1st storyIssued Jun 9, 2025 · fix by Jun 15, 2025 overdue · Violation #17939302
  • C
    Lead paint- certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead…Issued Jun 5, 2025 · fix by Jun 29, 2025 overdue · Violation #17944237
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17942929
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jun 4, 2025 · fix by Jun 28, 2025 overdue · Violation #17943587
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 4, 2025 · fix by Jun 30, 2025 overdue · Violation #17932933
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jun 4, 2025 · fix by Jun 28, 2025 overdue · Violation #17943588
  • B
    Other repairsProperly repair or replace the broken or defective upper window sash glass pane at east wall in the 2nd room from northIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17932932
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood door in the bathroomIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17942997
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wash basin waste line in the bathroomIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · rent impairing · Violation #17942930
  • B
    Electrical problemsProperly secure the loose panel cover at electrical circuit breaker in the foyerIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17942928
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jun 4, 2025 · fix by Jun 28, 2025 overdue · Violation #17943586
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 3rd room from north at eastIssued Nov 30, 2023 · fix by Jan 4, 2024 overdue · Violation #16447810
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 22, 2023 · fix by Dec 18, 2023 overdue · Violation #16416944
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Nov 21, 2023 · fix by Dec 26, 2023 overdue · Violation #16415111
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from north at eastIssued Apr 27, 2022 · fix by Jun 1, 2022 overdue · Violation #15128996
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from north at eastIssued Apr 27, 2022 · fix by Jun 1, 2022 overdue · Violation #15128997
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north and east walls in the 1st room from north at eastIssued Apr 18, 2022 · fix by May 23, 2022 overdue · Violation #15115671
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall and ceiling in the bathroomIssued Apr 18, 2022 · fix by May 23, 2022 overdue · Violation #15115666
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 18, 2022 · fix by May 14, 2022 overdue · Violation #15115672
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from north at eastIssued Apr 18, 2022 · fix by May 23, 2022 overdue · Violation #15115667
  • B
    MoldTrace and repair the source and abate the visible mold condition 8 square feet at north wall, 8 square feet at east wall in the 1st room from north at eastIssued Apr 18, 2022 · fix by May 23, 2022 overdue · Violation #15115670
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 4th room from northIssued Sep 23, 2021 · fix by Sep 29, 2021 overdue · Violation #14556959
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued Aug 19, 2021 · fix by Aug 25, 2021 overdue · Violation #14491373
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in washbasin wasteline in the bathroomIssued Mar 2, 2020 · fix by Apr 6, 2020 overdue · rent impairing · Violation #13623426
  • C
    MoldTrace and repair the source and abate the visible mold condition on north wall approx. 36 sq ft., ceiling approx.8 sq ft. and east wall approx. 6 sq ft. in…Issued Jun 26, 2019 · fix by Jul 17, 2019 overdue · Violation #13140066
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 26, 2019 · fix by Jul 17, 2019 overdue · Violation #13140071

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

132019
82020
32021
112022
62023
182025
42026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 70 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 19, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.