Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Eastchester-Edenwald-Baychester

3440 Fish Avenue, Bronx

10469 · 10 apartments · 5 stories · City Council district 12

By · Updated · Data from NYC HPD

C
6open immediately hazardous violations · 60 per 100 apartments
B10Hazardous, open
A1Non-hazardous, open
!17Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Who owns and manages it

Owning companyEastchester Heights property owner LLC
Landlord (head officer or owner)Andrew Schwartz

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    5
  2. Mold
    4
  3. Other repairs
    3
  4. Roaches
    2
  5. Leaks and water damage
    1
  6. Broken doors or locks
    1
  7. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

CNot enough data
NYC typical: 87 days
BNot enough data
NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Other repairsProperly repair with similar material the broken or defective wood floor tiles in the 3rd room from eastIssued Sep 9, 2024 · fix by Sep 15, 2024 overdue · Violation #17253266
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor tiles in the 2nd room from eastIssued Sep 9, 2024 · fix by Sep 15, 2024 overdue · Violation #17253267
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the household garbage bags at building front at front areawayIssued Sep 9, 2024 · fix by Oct 14, 2024 overdue · Violation #17253268
  • B
    MoldTrace and repair the source and abate the visible mold condition at north wall appox 10 sq ft in the bathroomIssued Feb 2, 2022 · fix by Mar 9, 2022 overdue · Violation #14802683
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Feb 2, 2022 · fix by Mar 9, 2022 overdue · Violation #14802682
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Feb 2, 2022 · fix by Mar 9, 2022 overdue · Violation #14802681
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Jan 28, 2022 · fix by Feb 3, 2022 overdue · Violation #14794376
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 18, 2021 · fix by Nov 13, 2021 overdue · Violation #14629413
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 18, 2021 · fix by Nov 13, 2021 overdue · Violation #14629414
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, west wall, north wall in the private hallwayIssued Oct 18, 2021 · fix by Nov 22, 2021 overdue · Violation #14629423
  • B
    MoldTrace and repair the source and abate the visible mold condition approx. 5 sq. ft. at ceiling, 3 sq. ft. at west wall, and 2 sq. ft. at north wall in the…Issued Oct 18, 2021 · fix by Nov 22, 2021 overdue · Violation #14629422
  • B
    MoldTrace and repair the source and abate the visible mold condition approx. 5 sq. ft. at east wall, 5 sq. ft. at closet ceiling, 5 sq. ft. at north closet wall…Issued Oct 18, 2021 · fix by Nov 22, 2021 overdue · Violation #14629419
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east wall, 1st closet from north at east wall ceiling, 1st closet…Issued Oct 18, 2021 · fix by Nov 22, 2021 overdue · Violation #14629418
  • B
    MoldTrace and repair the source and abate the visible mold condition approx. 10 sq. ft. at ceiling, 2 sq ft. at north wall, 5 sq. ft. at east wall, 5 sq.ft. at…Issued Oct 18, 2021 · fix by Nov 22, 2021 overdue · Violation #14629416
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall, east wall, south wall, west wall in the bathroomIssued Oct 18, 2021 · fix by Nov 22, 2021 overdue · Violation #14629415
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 16, 2020 · fix by Nov 11, 2020 overdue · Violation #13858891

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

82019
52020
92021
52022
32024
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 38 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.