Housing violations · Pelham Parkway-Van Nest
821 Lydig Avenue, Bronx
10462 · 59 apartments · 6 stories · City Council district 13
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster24
- Lead paint19
- Broken doors or locks7
- Other repairs6
- Mold4
- Missing smoke or CO detector4
- Leaks and water damage3
- Roaches2
- Mice or rats2
- No heat or hot water1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 22 closed · NYC typical: 87 days
from 13 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 26, 2024 · fix by Feb 24, 2024 overdue · rent impairing · Violation #16695330
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 26, 2024 · fix by Mar 23, 2024 overdue · Violation #16695331
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at west wall at compactor closet, 2nd storyIssued Feb 14, 2024 · fix by Mar 20, 2024 overdue · Violation #16675694
- BBroken doors or locksRefit door at staircase b at public hall stairs, 2nd storyIssued Feb 14, 2024 · fix by Mar 20, 2024 overdue · Violation #16675697
- BPlumbing, sinks and toiletsRepair the broken or defective connection wash basin drainage pipe in the bathroomIssued Jan 25, 2024 · fix by Feb 29, 2024 overdue · Violation #16620025
- BMoldTrace and repair the source and abate the visible mold condition at the east wall in the 1st room from northIssued Oct 10, 2023 · fix by Nov 14, 2023 overdue · Violation #16297602
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 13, 2023 · fix by Oct 9, 2023 overdue · Violation #16211763
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 13, 2023 · fix by Oct 9, 2023 overdue · Violation #16211764
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north at eastIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16026013
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 9, 2023 · fix by Jul 3, 2023 overdue · Violation #16036286
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 9, 2023 · fix by Jul 3, 2023 overdue · Violation #16036287
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 9, 2023 · fix by Jul 3, 2023 overdue · Violation #16036288
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 9, 2023 · fix by Jul 3, 2023 overdue · Violation #16036289
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 9, 2023 · fix by Jul 3, 2023 overdue · Violation #16036290
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 9, 2023 · fix by Jul 3, 2023 overdue · Violation #16036291
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the 4th room from north at eastIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16036276
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, ceiling in the 4th room from north at westIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16036273
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyerIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16036272
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling, west wall in the bathroomIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16036270
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 4th room from north at eastIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16026012
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 4th room from north at eastIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16026011
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall, ceiling, south wall in the 1st room from northIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16026009
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall in the 1st room from northIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16026004
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from northIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16026003
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from northIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16026002
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16026000
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16025999
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16025997
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, ceiling in the 4th room from north at westIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16025991
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east wall in the kitchenIssued Jun 9, 2023 · fix by Jul 14, 2023 overdue · Violation #16025989
- COther repairsReplace with new the broken or defective lower sash window glass pane in the 3rd room from north at westIssued Jul 6, 2022 · fix by Jul 12, 2022 overdue · Violation #15226002
- BMoldTrace and repair the source and abate the visible mold condition approx.6 sq. ft. at closet from north at east wall in the 2nd room from east at northIssued Mar 17, 2022 · fix by Apr 21, 2022 overdue · Violation #15058314
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the bathroomIssued Mar 7, 2022 · fix by Apr 11, 2022 overdue · Violation #14969267
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Mar 7, 2022 · fix by Apr 11, 2022 overdue · Violation #14969268
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jul 30, 2021 · fix by Aug 23, 2021 overdue · Violation #14468547
- BMoldTrace and repair the source and abate the visible mold condition approximately 5 sq ft window frame from east at south wall in the 1st room from east at southIssued Jul 15, 2020 · fix by Aug 19, 2020 overdue · Violation #13724348
- BMoldTrace and repair the source and abate the visible mold condition at ceiling approximately 2 (sq. ft) in the bathroomIssued Apr 6, 2020 · fix by May 11, 2020 overdue · Violation #13661832
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 17, 2020 · fix by Apr 14, 2020 overdue · Violation #13653005
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 17, 2020 · fix by Apr 14, 2020 overdue · Violation #13653003
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 17, 2020 · fix by Apr 14, 2020 overdue · Violation #13653007
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 17, 2020 · fix by Apr 14, 2020 overdue · Violation #13653006
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 13, 2019 · fix by Jan 10, 2020 overdue · Violation #13499739
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 9, 2019 · fix by Jan 6, 2020 overdue · Violation #13487716
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 6, 2019 · fix by Dec 27, 2019 overdue · Violation #13482593
- BMissing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartmentIssued Mar 27, 2013 · fix by May 1, 2013 overdue · Violation #9782290
- BMissing smoke or CO detectorRepair or replace the smoke detector that is missing in the entire apartmentIssued Mar 27, 2013 · fix by May 1, 2013 overdue · Violation #9782310
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroomIssued Sep 26, 2011 · fix by Oct 31, 2011 overdue · Violation #9124273
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued May 24, 2011 · fix by Jun 28, 2011 overdue · Violation #8954244
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of keyed lockset at the door to the room with the fire escape window in the 4th room from north at westIssued May 23, 2011 · fix by May 29, 2011 overdue · Violation #8952773
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 5, 2010 · fix by Mar 31, 2010 overdue · Violation #8311586
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 2, 2010 · fix by Feb 28, 2010 overdue · Violation #8262010
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Feb 2, 2010 · fix by Feb 28, 2010 overdue · Violation #8262008
- BOther repairsReplace with new the broken or defective center window glass pane in the 2nd room from northIssued Feb 24, 2009 · fix by Mar 31, 2009 overdue · Violation #7736400
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 23, 2007 · fix by Jun 18, 2007 overdue · Violation #6757740
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 23, 2007 · fix by Jun 18, 2007 overdue · Violation #6757741
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 23, 2007 · fix by Jun 18, 2007 overdue · Violation #6757739
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceilings throughout at entire apartment, 3rd story, apartmentIssued Nov 10, 2003 · fix by Dec 20, 2003 overdue · Violation #4759235
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.