Housing violations · Allerton
776 Mace Avenue, Bronx
10467 · 49 apartments · 6 stories · City Council district 13
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint6
- Broken doors or locks2
- Other repairs1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 153 closed · NYC typical: 87 days
from 172 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairs& 309 m/d law abate the nuisance consisting of garbage cans impeding free fall of the drop ladder of the 2nd fire escape from south at east exterior wall…Issued Jul 16, 2026 · fix by Aug 20, 2026 overdue · Violation #19080999
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Apr 27, 2026 · fix by May 21, 2026 overdue · Violation #18821211
- BBroken doors or locksProperly repair with similar material the broken or defective door frame in the entranceIssued Apr 10, 2026 · fix by May 15, 2026 overdue · Violation #18770266
- BBroken doors or locksProperly repair or replace the broken or defective lock assembly in the entranceIssued Apr 10, 2026 · fix by May 15, 2026 overdue · Violation #18770264
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Dec 11, 2023 · fix by Jan 6, 2024 overdue · Violation #16509097
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 22, 2023 · fix by Dec 16, 2023 overdue · Violation #16434585
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 22, 2023 · fix by Dec 16, 2023 overdue · Violation #16434584
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 22, 2023 · fix by Dec 16, 2023 overdue · Violation #16434586
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 22, 2023 · fix by Dec 16, 2023 overdue · Violation #16434587
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 22, 2023 · fix by Dec 16, 2023 overdue · Violation #16434588
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.