Housing violations · Westchester Square
2554 Maclay Avenue, Bronx
10461 · 10 apartments · 3 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks9
- Other repairs8
- Leaks and water damage5
- Peeling paint and plaster5
- Missing smoke or CO detector4
- Roaches4
- Mold3
- Plumbing, sinks and toilets3
- Mice or rats2
- Electrical problems1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 24 closed · NYC typical: 87 days
from 10 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19334470
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · rent impairing · Violation #19334469
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19334471
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19334472
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective arm closing device at building vestibule door (from vestibule to public hall) , 1st storyIssued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19334474
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19334468
- BBroken doors or locksProvide glass in lieu of plexi glass at building entrance door , 1st storyIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281561
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plexi glass installed at building entrance door , 1st storyIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19281559
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 21, 2026 · fix by Sep 16, 2026 overdue · Violation #19153879
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at west wall in vestibule area , 1st storyIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19153883
- BBroken doors or locksProperly repair or replace the broken or defective door to mailbox for apartment 2c , 1st storyIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19153882
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 21, 2026 · fix by Sep 16, 2026 overdue · Violation #19153881
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at bathtub in the bathroomIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · rent impairing · Violation #19153880
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the bathroomIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18838910
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building emtrance door at basementIssued Mar 9, 2026 · fix by Mar 15, 2026 overdue · Violation #18692858
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 23, 2026 · fix by Feb 18, 2026 overdue · Violation #18589087
- BBroken doors or locksProperly repair or replace the broken or defective door.off hinges in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296329
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296330
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 2nd room from northIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296332
- BBroken doors or locksProperly repair or replace the broken or defective off hinges at door in the 2nd room from northIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296333
- BBroken doors or locksProperly repair or replace the broken or defective door off hinges in the 1st room from north at eastIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296334
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at westIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296335
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling light fixture in the kitchenIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296336
- BOther repairsProperly repair or replace the broken or defective at top and bottom cabinets at south and east walls in the kitchenIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296337
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective subfloors sinking and vinyl tiles in the kitchenIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296338
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wooden top counter top sinking at east in the kitchenIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296339
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the foyerIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296340
- BOther repairsProperly repair with similar material the broken or defective wooden subfloors in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296331
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door beyond repair in the entranceIssued Oct 14, 2025 · fix by Oct 28, 2025 overdue · Violation #18296341
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 14, 2025 · fix by Nov 9, 2025 overdue · Violation #18296328
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at southIssued Apr 1, 2024 · fix by May 6, 2024 overdue · Violation #16784185
- BOther repairsFire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gateIssued Apr 1, 2024 · fix by May 6, 2024 overdue · Violation #16784191
- CLead paintReplace or repair the self-closing doors that is missing or defective hinges at vestibule door leading to public hall , 1st storyIssued Apr 1, 2024 · fix by Apr 15, 2024 overdue · Violation #16784193
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at southIssued Apr 1, 2024 · fix by May 6, 2024 overdue · Violation #16784186
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall and ceiling in the 1st room from north at westIssued Feb 29, 2024 · fix by Apr 4, 2024 overdue · Violation #16706202
- BOther repairsProperly repair with similar material the broken or defective ceramlc wall tiles at west wall in the bathroomIssued Feb 29, 2024 · fix by Apr 4, 2024 overdue · Violation #16706203
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jan 30, 2024 · fix by Mar 5, 2024 overdue · Violation #16631948
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jan 30, 2024 · fix by Mar 5, 2024 overdue · Violation #16631947
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.