Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · University Heights (South)-Morris Heights

74 West 174 Street, Bronx

10453 · 26 apartments · 6 stories · City Council district 14

By · Updated · Data from NYC HPD

C
35open immediately hazardous violations · 135 per 100 apartments
B81Hazardous, open
A22Non-hazardous, open
!127Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

18 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyARISTA UAC PROPERTIES, LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    32
  2. Leaks and water damage
    23
  3. Other repairs
    15
  4. Missing smoke or CO detector
    12
  5. Mice or rats
    12
  6. Broken doors or locks
    10
  7. Mold
    9
  8. Plumbing, sinks and toilets
    8
  9. Roaches
    8
  10. No heat or hot water
    5
  11. Electrical problems
    2
  12. Missing window guards
    1
  13. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C81 days
from 36 closed · NYC typical: 87 days
B121 days
from 8 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19324731
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19324717
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19324706
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19324704
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19324732
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in at drainpipe at washbasin in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · rent impairing · Violation #19324722
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19324730
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19324729
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the 6th room from east at northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19270067
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270070
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270071
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 6th room from east at northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270069
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the private hallwayIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19270068
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the 1st room from northIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · rent impairing · Violation #19256334
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Sep 29, 2026 · fix by Oct 5, 2026 overdue · Violation #19256335
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 29, 2026 · fix by Oct 13, 2026 overdue · Violation #19256338
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19256336
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Sep 29, 2026 · fix by Oct 5, 2026 overdue · Violation #19256340
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19256337
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19251298
  • C
    Broken doors or locksProvide ready access to buildings heating system door at cellar locked at boiler roomIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19250310
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 28, 2026 · fix by Sep 27, 2026 overdue · rent impairing · Violation #19251296
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the 4th room from eastIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19251297
  • C
    Broken doors or locksProvide ready access to buildings heating system locked gate to boiler room at boiler roomIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19233137
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 4, 2026 · fix by Sep 30, 2026 overdue · Violation #19189679
  • B
    Other repairsProperly repair or replace the broken or defective 1st drawer from north at base cabiet in the kitchenIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19189682
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19189681
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 4, 2026 · fix by Sep 30, 2026 overdue · Violation #19189680
  • B
    MoldTrace and repair the source and abate the visible mold condition [less than ten sqft] at ceiling in the bathroomIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19116256
  • C
    Other repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods out of guide at east exterior wall at fire escapeIssued Jul 27, 2026 · fix by Aug 2, 2026 overdue · rent impairing · Violation #19105393
  • B
    Other repairsFire escape defective. replace with new the broken, defective and/or missing bent drop ladder at east building front at fire escapeIssued Jun 9, 2026 · fix by Jul 14, 2026 overdue · rent impairing · Violation #18990371
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18964797
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the private hallwayIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18964798
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 7th room from eastIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18964799
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10sq.ft but less than 30 sq ft at south and west wall around bathtub in the 1st…Issued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18964800
  • B
    MoldTrace and repair the source and abate the visible mold condition less then 10 sq ft at ceiling in the bathroomIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18792393
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set and its assemblys at door from vestibule to 1st story at public hallIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18758803
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the bathroomIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18758799
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet at north wall in the kitchenIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18758797
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 22, 2026 · fix by Jan 22, 2026 overdue · rent impairing · Violation #18586380
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 22, 2026 · fix by Jan 22, 2026 overdue · rent impairing · Violation #18586376
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 22, 2026 · fix by Jan 22, 2026 overdue · rent impairing · Violation #18586379
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 22, 2026 · fix by Feb 17, 2026 overdue · Violation #18586377
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch and assembly at door at public hall, 1st storyIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18566839
  • B
    Leaks and water damageRepair the leaky and/or defective faucets faucet knob at washbasin in the 1st bathroom from eastIssued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18138934
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the 1st bathroom from northIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17892890
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective bathtub or reglaze with porcelain enamel finish in the 1st bathroom from northIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17892889
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from northIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17892878
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in at drainline under bathtub in the 2nd bathroom from northIssued May 15, 2025 · fix by Jun 19, 2025 overdue · rent impairing · Violation #17892880
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the 2nd bathroom from northIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17892881
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the 2nd bathroom from northIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17892883
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 4th room from eastIssued Apr 21, 2025 · fix by May 26, 2025 overdue · Violation #17838688
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, west wall, south wall, and east wall in the bathroomIssued Apr 21, 2025 · fix by May 26, 2025 overdue · Violation #17838690
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from eastIssued Apr 21, 2025 · fix by May 26, 2025 overdue · Violation #17838683
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 1st room from eastIssued Apr 21, 2025 · fix by May 26, 2025 overdue · Violation #17838684
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the private hallwayIssued Apr 21, 2025 · fix by May 26, 2025 overdue · Violation #17838685
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the private hallwayIssued Apr 21, 2025 · fix by May 26, 2025 overdue · Violation #17838686
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 4th room from eastIssued Apr 21, 2025 · fix by May 26, 2025 overdue · Violation #17838687
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and west wall in the bathroomIssued Apr 21, 2025 · fix by May 26, 2025 overdue · Violation #17838689
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Apr 21, 2025 · fix by May 26, 2025 overdue · Violation #17838692

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

232017
102018
222019
342020
232021
262022
202023
142024
352025
882026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 334 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.