Housing violations · Mariner's Harbor-Arlington-Graniteville
85 Lockman Loop, Staten Island
10303 · 2 apartments · 2 stories · City Council district 49
By Mantie Reid II · Updated · Data from NYC HPD
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs4
- Broken doors or locks3
- Mice or rats2
- Plumbing, sinks and toilets2
- Peeling paint and plaster1
- Leaks and water damage1
- Mold1
- Electrical problems1
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 1 closed · NYC typical: 84 days
from 12 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly secure the loose handrail at west wall in the foyerIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19068552
- BMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19054757
- BOther repairsAbate the nuisance consisting of pests. evidence of waterbug in the entire apartmentIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19054758
- BOther repairsProperly secure the loose handrail at west wall at stairs to upper level , 1st story, section ''85b''Issued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19052527
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall at 1st closet from south at west in the bathroomIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19052522
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in bathtub wasteline in the bathroomIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19052521
- BPlumbing, sinks and toiletsProperly secure the loose shower head at bathtub in the bathroomIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19052520
- BOther repairsProperly repair or replace the broken or defective mechanical air vent at ceiling in the bathroomIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19052518
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at door in the entranceIssued Jul 7, 2026 · fix by Jul 13, 2026 overdue · Violation #19052512
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door , 1st story, section ''85b''Issued Jul 7, 2026 · fix by Jul 13, 2026 overdue · Violation #19052528
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at south wall at 1st closet from south at west in the bathroomIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19052514
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at south wall in the 5th room from eastIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19052517
- BMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19052516
- BRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19052515
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 21, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.