Housing violations · Tremont
2052 Mapes Avenue, Bronx
10460 · 13 apartments · 4 stories · City Council district 15
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
24 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs19
- No heat or hot water13
- Leaks and water damage13
- Peeling paint and plaster12
- Mice or rats12
- Mold11
- Broken doors or locks10
- Roaches10
- Missing smoke or CO detector10
- Lead paint8
- Electrical problems4
- Plumbing, sinks and toilets2
- Missing window guards2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 193 closed · NYC typical: 87 days
from 216 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 16, 2026 · Violation #19372028
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19372029
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19372030
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19374226
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 16, 2026 · Violation #19372026
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19374227
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19374229
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19374230
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19372020
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321679
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19321680
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at southIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321684
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19321681
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19321682
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 2nd room from east at southIssued Oct 26, 2026 · fix by Nov 30, 2026 · rent impairing · Violation #19321685
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321686
- COther repairsProperly repair or replace the broken or defective spring balance at lower window sash at east wall in the bathroomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19321683
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Oct 26, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19321678
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19285540
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19285541
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 8, 2026 · fix by Nov 1, 2026 overdue · Violation #19288818
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 8, 2026 · fix by Nov 1, 2026 overdue · Violation #19288816
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 8, 2026 · fix by Nov 1, 2026 overdue · Violation #19288815
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 8, 2026 · fix by Nov 1, 2026 overdue · Violation #19288817
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 8, 2026 · fix by Nov 1, 2026 overdue · Violation #19288814
- BOther repairsProperly repair or replace the broken or defective light fixture at the ceiling in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267362
- COther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at northIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19267545
- CPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood sink base cabinet at west wall in the kitchenIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19267531
- COther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19267519
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19267539
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19267538
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 1, 2026 · fix by Oct 27, 2026 overdue · rent impairing · Violation #19267537
- CMoldTrace and repair the source and abate the visible mold condition observed greater than 30 sq ft in the bathroomIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19267361
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at the ceiling in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267351
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and east wall in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267357
- BBroken doors or locksProperly repair or replace the broken or defective metal door knob to closet at the south wall in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267365
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and all walls in the 4th room from eastIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267511
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at the ceiling in the 4th room from eastIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267512
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the west wall in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267515
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267535
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267536
- BElectrical problemsProperly repair or replace the broken or defective electrical ligt fixture at the ceiling in the 1st room from east at northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267546
- BBroken doors or locksProperly repair with similar material the broken or defective wood closet door at north wall in the 1st room from east at southIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267551
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at east wall in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19242371
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 16, 2026 · fix by Oct 12, 2026 overdue · Violation #19218964
- BMoldTrace and repair the source and abate the visible mold condition observed greater than (10) sq ft at ceiling in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218966
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218967
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 16, 2026 · fix by Sep 30, 2026 overdue · Violation #19218968
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at light fixture at ceiling in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218965
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214828
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19214827
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214829
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and all walls in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214831
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214832
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19151478
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Aug 18, 2026 · fix by Sep 13, 2026 overdue · Violation #19151480
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 18, 2026 · fix by Sep 13, 2026 overdue · Violation #19151477
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 18, 2026 · fix by Sep 13, 2026 overdue · Violation #19151481
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19151479
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19142137
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.