Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Mount Eden-Claremont (West)

38 Marcy Place, Bronx

10452 · 60 apartments · 5 stories · City Council district 16

By · Updated · Data from NYC HPD

C
31open immediately hazardous violations · 52 per 100 apartments
B49Hazardous, open
A25Non-hazardous, open
!101Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company40 MARCY LTD
Landlord (head officer or owner)Martin Meyer

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    27
  2. Peeling paint and plaster
    21
  3. Lead paint
    16
  4. Broken doors or locks
    9
  5. Leaks and water damage
    7
  6. Mold
    7
  7. Roaches
    6
  8. Missing smoke or CO detector
    4
  9. Mice or rats
    3
  10. No heat or hot water
    2
  11. Electrical problems
    1
  12. Plumbing, sinks and toilets
    1
  13. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C90 days
from 26 closed · NYC typical: 87 days
B117 days
from 53 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330239
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 1st storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330235
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19199470
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19199469
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at doorIssued May 8, 2026 · fix by May 22, 2026 overdue · Violation #18877921
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the private hallwayIssued Jul 24, 2025 · fix by Aug 28, 2025 overdue · Violation #18106520
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 24, 2025 · fix by Aug 17, 2025 overdue · Violation #18117898
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the 4th room from northIssued Jul 24, 2025 · fix by Aug 28, 2025 overdue · Violation #18106524
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jul 24, 2025 · fix by Aug 17, 2025 overdue · Violation #18117896
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 24, 2025 · fix by Aug 17, 2025 overdue · Violation #18117897
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall in the 4th room from northIssued Jul 24, 2025 · fix by Aug 28, 2025 overdue · Violation #18106515
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft at east wall in the bathroomIssued Jul 24, 2025 · fix by Aug 28, 2025 overdue · Violation #18106509
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall in the 1st room from northIssued Jul 24, 2025 · fix by Aug 28, 2025 overdue · Violation #18106517
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Jul 24, 2025 · fix by Aug 28, 2025 overdue · Violation #18106519
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of air conditioner unit installed at fire escape window in the 1st room from northIssued Jul 24, 2025 · fix by Aug 28, 2025 overdue · Violation #18106523
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardent material at north and east wall at 1st public hall bulkhead from east, 5th story,…Issued Jul 17, 2025 · fix by Aug 21, 2025 overdue · Violation #18099884
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardent material at east wall at intermediate landing at public hall stairs, 3rd story,…Issued Jul 17, 2025 · fix by Aug 21, 2025 overdue · Violation #18099854
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardent material at west wall at 2nd public hall bulkhead from east, 5th story, section at…Issued Jul 17, 2025 · fix by Aug 21, 2025 overdue · Violation #18099880
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 1st story, section at westIssued Jul 17, 2025 · fix by Aug 21, 2025 overdue · Violation #18099847
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardent material at north, east, and south walls at public hall stairs, 4th story, section…Issued Jul 17, 2025 · fix by Aug 21, 2025 overdue · Violation #18099861
  • B
    Other repairsProperly repair with similar material the broken or defective fire retartent material at east wall, intermediate landing at public hall stairs, 3rd storyIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17919168
  • B
    Other repairsProperly repair with similar material the broken or defective fire retartent material at north, east and south walls, intermediate landing at public hall…Issued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17919151
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardent material at west wall at 1st public hall bulkhead from east, 5th storyIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17919267
  • B
    Other repairsProperly repair with similar material the broken or defective fire retartent material at ceilling at public hall, 1st storyIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17919188
  • B
    Other repairsProperly repair with similar material the broken or defective fire retartent material at ceiling, north, west and east wall at 1st public hall bulkhead from…Issued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17919124
  • B
    Other repairsProperly repair with similar material the broken or defective fire retartent material at west wall at 2nd public hall bulkhead from east, 5th storyIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17919111
  • B
    Other repairsProperly repair with similar material the broken or defective loose and unkeyed fire retardant material at all walls at 1st public hall bulkhead from east, 5th…Issued May 2, 2025 · fix by Jun 6, 2025 overdue · Violation #17866973
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes satellite dish and wires installed at 3rd story balcony at 2nd…Issued May 2, 2025 · fix by Jun 6, 2025 overdue · Violation #17867065
  • B
    Other repairsProperly repair with similar material the broken or defective loose and unkeyed fire retardant material at all walls at 2nd public hall bulkhead from east, 5th…Issued May 2, 2025 · fix by Jun 6, 2025 overdue · Violation #17867107
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes satellite dish and wires installed at 5th story balcony at east…Issued May 2, 2025 · fix by Jun 6, 2025 overdue · Violation #17867047
  • B
    Other repairsProperly repair or replace the broken or defective sagging sloping wood floor in the private hallwayIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17811911
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at east wall, north wall and south wall at bulkhead at west sectionIssued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17804741
  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17804744
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Mar 8, 2024 · fix by Apr 1, 2024 overdue · Violation #16732083
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 7, 2024 · fix by Mar 31, 2024 overdue · Violation #16731719
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 7, 2024 · fix by Mar 31, 2024 overdue · Violation #16731720
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 7, 2024 · fix by Mar 31, 2024 overdue · Violation #16731721
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 7, 2024 · fix by Mar 31, 2024 overdue · Violation #16731722
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 29, 2024 · fix by Mar 26, 2024 overdue · Violation #16706358
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 29, 2024 · fix by Mar 26, 2024 overdue · Violation #16706359
  • B
    MoldTrace and repair the source and abate the visible mold condition at west wall approx 6 sq ft at south wall approx 6 sq ft at north wall approx 6 sq ft in the…Issued Dec 4, 2023 · fix by Jan 8, 2024 overdue · Violation #16501217
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 4 sq ft at ceiling approximately 10 sq ft at north wall approximately 2 sq ft…Issued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16435816
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door ( court to 1st sty public hall)Issued May 30, 2023 · fix by Jun 5, 2023 overdue · Violation #16010086
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Mar 8, 2023 · fix by Apr 12, 2023 overdue · Violation #15758930
  • C
    Broken doors or locksProperly repair the broken or defective mortise lock at building entrance door [ from street to public hallway ]Issued Feb 6, 2023 · fix by Feb 12, 2023 overdue · Violation #15705909
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 7, 2022 · fix by Dec 1, 2022 overdue · Violation #15498112
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 7, 2022 · fix by Dec 1, 2022 overdue · Violation #15498111
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Nov 7, 2022 · fix by Dec 1, 2022 overdue · Violation #15498110
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 29, 2022 · fix by Sep 22, 2022 overdue · Violation #15340505
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 29, 2022 · fix by Sep 22, 2022 overdue · Violation #15340504
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the kitchenIssued Mar 2, 2022 · fix by Mar 8, 2022 overdue · Violation #14943845
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Feb 10, 2022 · fix by Mar 17, 2022 overdue · Violation #14819103
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 10, 2022 · fix by Mar 8, 2022 overdue · Violation #14819105
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 10, 2022 · fix by Mar 8, 2022 overdue · Violation #14819106
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling (approx. 2 sq.ft.) in the bathroomIssued Jun 11, 2021 · fix by Jul 16, 2021 overdue · Violation #14386071
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 11, 2021 · fix by Jun 6, 2021 overdue · Violation #14328667
  • B
    Other repairsReplace with new the broken or defective spring balance at lower sash window at west wall in the 3rd room from northIssued Mar 29, 2021 · fix by May 3, 2021 overdue · Violation #14093677
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 17, 2021 · fix by Mar 15, 2021 overdue · Violation #14027506
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding 130 degrees in the entire apartmentIssued Feb 17, 2021 · fix by Feb 23, 2021 overdue · Violation #14027505
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 17, 2021 · fix by Mar 15, 2021 overdue · Violation #14027501

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

372017
162018
712019
372020
842021
482022
232023
402024
652025
302026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 818 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.