Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford Park

2654 Marion Avenue, Bronx

10458 · 21 apartments · 5 stories · City Council district 15

By · Updated · Data from NYC HPD

C
38open immediately hazardous violations · 181 per 100 apartments
B66Hazardous, open
A20Non-hazardous, open
!108Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companySCG 2654 LLC.
Landlord (head officer or owner)Joseph Soleimani

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    27
  2. Other repairs
    20
  3. Mold
    11
  4. Plumbing, sinks and toilets
    10
  5. Lead paint
    10
  6. Mice or rats
    9
  7. Roaches
    9
  8. Missing smoke or CO detector
    8
  9. Leaks and water damage
    7
  10. Broken doors or locks
    6
  11. Electrical problems
    4
  12. No heat or hot water
    3

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C82 days
from 64 closed · NYC typical: 87 days
B118 days
from 49 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361030
  • B
    Other repairsProperly secure the loose ceramic wall tile at east wall in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361031
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19361033
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Nov 9, 2026 · fix by Nov 23, 2026 · Violation #19361034
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19306168
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19306171
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19306169
  • C
    Other repairsProperly repair or replace the broken or defective upper window sash glass pane ( inner part) at 1st window from south at west in the kitchenIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19306172
  • B
    Other repairsProperly repair with similar material the broken or defective marble tiles at north wall at vestibule at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19306173
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 19 sq.ft at north wall in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19306167
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at ceiling around window casing at south wall in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19295659
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 14, 2026 · fix by Sep 9, 2026 overdue · Violation #19137018
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq.ft at south wall, north wall, west wall and east wall in the bathroomIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19137017
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 21, 2026 · fix by Aug 25, 2026 overdue · Violation #19083988
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 21, 2026 · fix by Aug 25, 2026 overdue · Violation #19083987
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at ceiling in the bathroomIssued Jul 21, 2026 · fix by Aug 25, 2026 overdue · Violation #19083989
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroomIssued Jul 21, 2026 · fix by Aug 25, 2026 overdue · Violation #19083991
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective calking around bathtub in the bathroomIssued Jul 21, 2026 · fix by Aug 25, 2026 overdue · Violation #19083990
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 16, 2026 · fix by Jun 12, 2026 overdue · rent impairing · Violation #18999589
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 15, 2026 · fix by Jun 12, 2026 overdue · rent impairing · Violation #18999577
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 12, 2026 · fix by Jul 8, 2026 overdue · Violation #18994212
  • B
    Broken doors or locksProvide latch and its assembles at vestibule door (vestibule to 1st story public hall) at public hall, 1st storyIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18994219
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 12, 2026 · fix by Jun 11, 2026 overdue · rent impairing · Violation #18994213
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18700528
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18700506
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18700429
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Feb 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18630612
  • C
    Lead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Feb 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18630611
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 27, 2025 · fix by Nov 22, 2025 overdue · Violation #18324222
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 27, 2025 · fix by Nov 22, 2025 overdue · rent impairing · Violation #18324224
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling at public hall, 1st storyIssued Oct 27, 2025 · fix by Dec 1, 2025 overdue · Violation #18324223
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 18, 2025 · fix by Oct 23, 2025 overdue · Violation #18233503
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 18, 2025 · fix by Oct 23, 2025 overdue · Violation #18233502
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Sep 18, 2025 · fix by Oct 23, 2025 overdue · Violation #18233498
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall, ceiling in the foyerIssued Sep 18, 2025 · fix by Oct 23, 2025 overdue · Violation #18233499
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Sep 18, 2025 · fix by Sep 24, 2025 overdue · Violation #18233494
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at all walls and ceiling in the bathroomIssued Sep 18, 2025 · fix by Oct 14, 2025 overdue · Violation #18233493
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the bathroomIssued Sep 18, 2025 · fix by Oct 23, 2025 overdue · Violation #18233501
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at northIssued Sep 18, 2025 · fix by Oct 23, 2025 overdue · Violation #18233497
  • B
    Other repairsProperly repair or replace the broken or defective spspring balance at upper sash window 1st from north at east wall in the 1st room from east at southIssued Jul 28, 2025 · fix by Sep 1, 2025 overdue · Violation #18113832
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinets at sink in the kitchenIssued Jul 28, 2025 · fix by Sep 1, 2025 overdue · Violation #18113833
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 28, 2025 · fix by Aug 23, 2025 overdue · Violation #18113829
  • B
    Broken doors or locksProperly secure the loose door at entrance in the 2nd room from east at northIssued Jul 28, 2025 · fix by Sep 1, 2025 overdue · Violation #18113831
  • B
    Electrical problemsReplace with new the missing electrical outlet cover plate at east wall in the 1st room from east at southIssued Jul 28, 2025 · fix by Sep 1, 2025 overdue · Violation #18113830
  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Jul 28, 2025 · fix by Sep 1, 2025 overdue · Violation #18113828
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 28, 2025 · fix by Aug 23, 2025 overdue · Violation #18113827
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 27, 2025 · fix by Jul 23, 2025 overdue · Violation #18048869
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in washbasin in the bathroomIssued Apr 14, 2025 · fix by May 19, 2025 overdue · rent impairing · Violation #17822378
  • B
    Broken doors or locksProperly secure the loose door at entrance in the bathroomIssued Mar 19, 2025 · fix by Apr 23, 2025 overdue · Violation #17766477
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at ceiling, north wall, east wall, south wall, and west wall in the…Issued Mar 19, 2025 · fix by Apr 14, 2025 overdue · Violation #17766471
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinet at wash basin in the bathroomIssued Mar 19, 2025 · fix by Apr 23, 2025 overdue · Violation #17766476
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile in the bathroomIssued Nov 26, 2024 · fix by Dec 31, 2024 overdue · Violation #17444044
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective sink base cabinet in the kitchenIssued Nov 26, 2024 · fix by Dec 31, 2024 overdue · Violation #17444045
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Nov 26, 2024 · fix by Dec 31, 2024 overdue · Violation #17444048
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Nov 26, 2024 · fix by Dec 31, 2024 overdue · Violation #17444047
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from eastIssued Nov 26, 2024 · fix by Dec 31, 2024 overdue · Violation #17444039
  • B
    Other repairsProperly repair with similar material the broken or defective uneven wood floor around radiator in the 4th room from east at southIssued Nov 15, 2024 · fix by Dec 20, 2024 overdue · Violation #17421935
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles at intermediate landing at public hall stairs, 5th storyIssued Nov 15, 2024 · fix by Dec 20, 2024 overdue · Violation #17421940
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective closer arm at bulkheadIssued Nov 15, 2024 · fix by Nov 29, 2024 overdue · Violation #17421943
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection waste line under sink in the kitchenIssued Nov 15, 2024 · fix by Dec 20, 2024 overdue · Violation #17421944

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

712017
492018
22019
502020
292021
282022
382023
1012024
432025
872026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 816 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.