Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Tremont

1801 Marmion Avenue, Bronx

10460 · 26 apartments · 5 stories · City Council district 17

By · Updated · Data from NYC HPD

C
1open immediately hazardous violations · 4 per 100 apartments
B9Hazardous, open
A4Non-hazardous, open
!14Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

Who owns and manages it

Owning company1801 M LLC
Landlord (head officer or owner)David Tennenbaum

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    5
  2. Peeling paint and plaster
    4
  3. Plumbing, sinks and toilets
    3
  4. Leaks and water damage
    1
  5. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C91 days
from 53 closed · NYC typical: 87 days
B118 days
from 49 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Plumbing, sinks and toiletsProperly secure the loose wash basin in the bathroomIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18524650
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinets at sink in the kitchenIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18524652
  • B
    Other repairsProperly repair with similar material the broken or defective saddle at entrance in the bathroomIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18524655
  • B
    Other repairsProperly secure the loose wood cabinets at west wall in the kitchenIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18524653
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiled floor in the bathroomIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18524654
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18524658
  • B
    Other repairsProperly repair or replace the broken or defective bell and buzzer return system from building entrance to east wall in the private hallwayIssued Nov 19, 2025 · fix by Dec 24, 2025 overdue · Violation #18378542
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 18, 2025 · fix by May 14, 2025 overdue · Violation #17836341
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wooden sink base cabinet in the kitchenIssued Feb 28, 2025 · fix by Apr 4, 2025 overdue · Violation #17726584
  • B
    Other repairsProperly repair or replace the broken or defective building buzzer intercom system from vestibule area to panel at the east wall in the private hallwayIssued Feb 28, 2025 · fix by Apr 4, 2025 overdue · Violation #17726585

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

202017
552018
512019
272020
332021
632022
412023
472024
582025
72026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 659 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.