Housing violations · Kew Gardens Hills
150-21 75 Avenue, Queens
11367 · 12 apartments · 3 stories · City Council district 24
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Leaks and water damage9
- Broken doors or locks6
- Other repairs6
- Missing smoke or CO detector5
- Peeling paint and plaster5
- Lead paint4
- Mold3
- Missing window guards2
- No heat or hot water2
- Electrical problems1
- Plumbing, sinks and toilets1
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 10 closed · NYC typical: 87 days
from 19 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Nov 2, 2026 · fix by Nov 16, 2026 · Violation #19340658
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340657
- BOther repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · rent impairing · Violation #19340656
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340659
- CBroken doors or locksProperly repair or replace the broken or defective latch at building entrance door at public hall, 1st storyIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19340661
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340660
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19303563
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the north wall and ceiling in the 1st room from east at northIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19303565
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the north wall and ceiling in the 2nd room from east at northIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19303566
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19275286
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 28, 2026 · fix by Oct 24, 2026 overdue · Violation #19254345
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding the maximum allowable temperature of 130 f at all hot water fixtures in the entire…Issued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19254344
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at north wall in the bathroomIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18769964
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ,at ceiling in the bathroomIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18645766
- CLead paint- certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead…Issued Dec 8, 2025 · fix by Jan 1, 2026 overdue · Violation #18488341
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Dec 5, 2025 · fix by Dec 29, 2025 overdue · Violation #18488024
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Dec 5, 2025 · fix by Dec 31, 2025 overdue · Violation #18482911
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Dec 5, 2025 · fix by Jan 9, 2026 overdue · Violation #18482908
- BPlumbing, sinks and toiletsProperly secure the loose sink at basecabinet in the bathroomIssued Dec 5, 2025 · fix by Jan 9, 2026 overdue · Violation #18482907
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the 1st room from east at southIssued Dec 5, 2025 · fix by Jan 9, 2026 overdue · Violation #18482906
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 1st room from east at northIssued Dec 5, 2025 · fix by Jan 9, 2026 overdue · Violation #18482905
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 16, 2025 · fix by Jun 11, 2025 overdue · Violation #17894097
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued May 16, 2025 · fix by Jun 20, 2025 overdue · Violation #17894098
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued May 16, 2025 · fix by Jun 20, 2025 overdue · Violation #17894099
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees fahrenheit at all hot water fixtures in the entire…Issued May 16, 2025 · fix by May 22, 2025 overdue · Violation #17894096
- CLead paintRemove device preventing door from being self-closing cardboard at firedoor separating public hall leading to 1g at public hall, 1st storyIssued Jan 9, 2025 · fix by Jan 23, 2025 overdue · Violation #17603937
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 6, 2025 · fix by Jan 12, 2025 overdue · Violation #17595989
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Jul 22, 2024 · fix by Aug 26, 2024 overdue · Violation #17130821
- BMoldTrace and repair the source and abate the visible mold condition 4 square feet at north wall in the bathroomIssued May 30, 2024 · fix by Jul 4, 2024 overdue · Violation #17016681
- BOther repairsReplace with new the missing concrete landing pad under drop ladder from west at fire escapeIssued Feb 20, 2024 · fix by Mar 26, 2024 overdue · Violation #16674606
- BOther repairsReplace with new the missing concrete landing pad under drop ladder at 1st stack from north at east at fire escapeIssued Feb 20, 2024 · fix by Mar 26, 2024 overdue · Violation #16674605
- CBroken doors or locksProvide ready access to buildings heating system door lock at building front yard at boiler roomIssued Feb 6, 2024 · fix by Feb 12, 2024 overdue · Violation #16641901
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jan 31, 2024 · fix by Mar 6, 2024 overdue · Violation #16633100
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jan 31, 2024 · fix by Mar 6, 2024 overdue · Violation #16633099
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Jan 31, 2024 · fix by Mar 6, 2024 overdue · Violation #16633097
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Jan 31, 2024 · fix by Mar 6, 2024 overdue · Violation #16633096
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jan 31, 2024 · fix by Mar 6, 2024 overdue · Violation #16633102
- CBroken doors or locksProvide ready access to buildings heating system boiler room door locked at cellar at boiler roomIssued Jan 5, 2024 · fix by Jan 11, 2024 overdue · Violation #16564253
- BOther repairsProperly repair the broken or defective mailbox at north wall (Issued Dec 28, 2020 · fix by Feb 1, 2021 overdue · Violation #13957667
- BLeaks and water damageRepair the leaky and/or defective faucets bath tub in the bathroomIssued Dec 19, 2018 · fix by Jan 23, 2019 overdue · Violation #10024771
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.