Housing violations · Kew Gardens Hills
75-10 153 Street, Queens
11367 · 12 apartments · 3 stories · City Council district 24
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs10
- Leaks and water damage10
- Peeling paint and plaster9
- Mice or rats3
- Broken doors or locks2
- Roaches2
- Missing window guards1
- Mold1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 8 closed · NYC typical: 87 days
from 9 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairs& 309 m/d law abate the nuisance consisting of raw sewage smell emanates from the cellar in the entire apartmentIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19303417
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door frame at door to yard on west wall at public hall, 1st storyIssued Aug 31, 2026 · fix by Sep 14, 2026 overdue · Violation #19177586
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19177585
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Aug 28, 2026 · fix by Sep 23, 2026 overdue · Violation #19170298
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 28, 2026 · fix by Sep 23, 2026 overdue · Violation #19170297
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the 3rd room from north at westIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170296
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the bathroomIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170295
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19128146
- BOther repairsProperly repair with similar material the broken or defective fire retardant materials at north wall at intermediate landing at public hall stairs, 1st storyIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19128148
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 11, 2026 · fix by Sep 6, 2026 overdue · Violation #19128145
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at window reveal and north wall at intermediate landing at public hall stairs, 1st storyIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19128147
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of scooter and bicycle at 3rd story balcony at stack at…Issued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19128150
- BOther repairsProperly secure the loose radiator in the kitchenIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19107726
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinge in the entranceIssued Aug 3, 2026 · fix by Aug 17, 2026 overdue · Violation #19107727
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19107722
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19107723
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19107725
- BOther repairsProperly secure the loose radiator in the bathroomIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19107724
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039337
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039338
- BOther repairsProperly repair or replace the broken or defective intercom system at on east wall in the foyerIssued Apr 1, 2025 · fix by May 6, 2025 overdue · Violation #17789904
- BOther repairsProperly repair or replace the broken or defective intercom system from building entrance to east wall in the foyerIssued Mar 26, 2025 · fix by Apr 30, 2025 overdue · Violation #17780826
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling ceiling in the 3rd room from northIssued May 30, 2024 · fix by Jul 4, 2024 overdue · Violation #17006648
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling ceiling in the 3rd room from northIssued May 30, 2024 · fix by Jul 4, 2024 overdue · Violation #17006647
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 30, 2024 · fix by Jun 25, 2024 overdue · Violation #17006649
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east window frame 1st window frame from north at east wall in the 4th room from northIssued May 30, 2024 · fix by Jul 4, 2024 overdue · Violation #17006646
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall east wall in the 4th room from northIssued May 30, 2024 · fix by Jul 4, 2024 overdue · Violation #17006645
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 1st room from north at eastIssued Apr 18, 2024 · fix by May 23, 2024 overdue · Violation #16900455
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 3rd room from north at eastIssued Apr 18, 2024 · fix by May 23, 2024 overdue · Violation #16900457
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 4th room from northIssued Apr 18, 2024 · fix by May 23, 2024 overdue · Violation #16900459
- BMoldTrace and repair the source and abate the visible mold condition at west wall in the bathroomIssued Sep 18, 2023 · fix by Oct 23, 2023 overdue · Violation #16239373
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.