Housing violations · Kew Gardens Hills
73-11 153 Street, Queens
11367 · 12 apartments · 3 stories · City Council district 24
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
14 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster18
- Broken doors or locks16
- Leaks and water damage14
- Plumbing, sinks and toilets10
- Mold7
- No heat or hot water7
- Roaches6
- Other repairs6
- Missing smoke or CO detector4
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 21 closed · NYC typical: 87 days
from 13 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling,north,east and south walls. in the bathroomIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19354690
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at sink in the kitchenIssued Nov 6, 2026 · fix by Dec 11, 2026 · rent impairing · Violation #19354686
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 6, 2026 · fix by Dec 2, 2026 · Violation #19354687
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Nov 6, 2026 · fix by Dec 11, 2026 · rent impairing · Violation #19354688
- BBroken doors or locksProperly repair or replace the broken or defective latch at door in the 1st room from north at westIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19354689
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at east wall in the 1st room from northIssued Jul 2, 2026 · fix by Aug 6, 2026 overdue · Violation #19055392
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the bathroomIssued May 8, 2026 · fix by Jun 12, 2026 overdue · Violation #18877228
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 8, 2026 · fix by Jun 12, 2026 overdue · Violation #18877230
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the bathroomIssued May 8, 2026 · fix by Jun 12, 2026 overdue · Violation #18877229
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, east, south walls in the bathroomIssued May 8, 2026 · fix by Jun 12, 2026 overdue · Violation #18877236
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 8, 2026 · fix by Jun 3, 2026 overdue · Violation #18877233
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste pipe at sink in the kitchenIssued May 8, 2026 · fix by Jun 12, 2026 overdue · rent impairing · Violation #18877232
- BBroken doors or locksProperly repair or replace the broken or defective lock set at entrance door in the bathroomIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18264975
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18264974
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued May 13, 2025 · fix by Jun 17, 2025 overdue · Violation #17887840
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued May 13, 2025 · fix by Jun 17, 2025 overdue · Violation #17887838
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued May 13, 2025 · fix by Jun 17, 2025 overdue · Violation #17887839
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color window reveal at east wall in the 2nd room from north at eastIssued May 5, 2025 · fix by Jun 9, 2025 overdue · Violation #17867795
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak east wall in the 2nd room from north at eastIssued May 5, 2025 · fix by Jun 9, 2025 overdue · Violation #17867796
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 22, 2025 · fix by May 18, 2025 overdue · Violation #17844081
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Apr 22, 2025 · fix by May 27, 2025 overdue · Violation #17844076
- CPlumbing, sinks and toiletsRepair the broken or defective connection waste line pipe at sink in the kitchenIssued Apr 22, 2025 · fix by Apr 28, 2025 overdue · Violation #17844078
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Apr 22, 2025 · fix by May 6, 2025 overdue · Violation #17844080
- BBroken doors or locksProperly repair or replace the broken or defective latch at south fire door at public hall, 1st storyIssued Apr 22, 2025 · fix by May 27, 2025 overdue · Violation #17844084
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north and east wall in the bathroomIssued Apr 22, 2025 · fix by May 27, 2025 overdue · Violation #17844082
- CPlumbing, sinks and toiletsReplace the broken or defective wash basin in the bathroomIssued Apr 22, 2025 · fix by Apr 28, 2025 overdue · rent impairing · Violation #17844079
- BBroken doors or locksRepair the broken or defective connection locknut at waste line of sink in the kitchenIssued Jan 21, 2025 · fix by Feb 25, 2025 overdue · Violation #17629741
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 21, 2025 · fix by Jan 18, 2025 overdue · rent impairing · Violation #17629739
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jan 21, 2025 · fix by Feb 4, 2025 overdue · Violation #17629742
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 21, 2025 · fix by Feb 16, 2025 overdue · Violation #17629743
- CBroken doors or locksProvide ready access to buildings heating system boiler room door locked at cellar story at boiler roomIssued Jan 21, 2025 · fix by Jan 27, 2025 overdue · Violation #17629744
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 16, 2025 · fix by Jan 16, 2025 overdue · rent impairing · Violation #17624555
- CBroken doors or locksProvide ready access to buildings heating system door to cellar locked at boiler roomIssued Jan 16, 2025 · fix by Jan 22, 2025 overdue · Violation #17624554
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jan 16, 2025 · fix by Feb 11, 2025 overdue · Violation #17624552
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jan 16, 2025 · fix by Jan 30, 2025 overdue · Violation #17624557
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jan 16, 2025 · fix by Jan 30, 2025 overdue · Violation #17624553
- CNo heat or hot waterProvide hot water at all hot water fixtures in the 1st room from north at westIssued Jan 16, 2025 · fix by Jan 16, 2025 overdue · rent impairing · Violation #17624550
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from north at westIssued Jan 16, 2025 · fix by Jan 16, 2025 overdue · rent impairing · Violation #17624551
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Nov 29, 2024 · fix by Dec 13, 2024 overdue · Violation #17456527
- BPlumbing, sinks and toiletsRepair the broken or defective connection sink waste line in the kitchenIssued Nov 29, 2024 · fix by Jan 3, 2025 overdue · Violation #17456521
- BPlumbing, sinks and toiletsReplace the broken or defective washbasin in the bathroomIssued Nov 29, 2024 · fix by Jan 3, 2025 overdue · rent impairing · Violation #17456522
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Nov 29, 2024 · fix by Jan 3, 2025 overdue · rent impairing · Violation #17456523
- CBroken doors or locksProvide ready access to buildings heating system locked door at east yard at boiler roomIssued Nov 7, 2024 · fix by Nov 13, 2024 overdue · Violation #17398099
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at north window frame at public hall stairs, 2nd storyIssued Nov 7, 2024 · fix by Dec 12, 2024 overdue · Violation #17398100
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak north window frame at public hall stairs, 2nd storyIssued Nov 7, 2024 · fix by Dec 12, 2024 overdue · Violation #17398102
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 6, 2024 · fix by Nov 6, 2024 overdue · rent impairing · Violation #17398098
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 4, 2024 · fix by Nov 30, 2024 overdue · Violation #17389241
- BLeaks and water damageRepair the leaky and/or defective faucets sink in the kitchenIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17389234
- CPlumbing, sinks and toiletsReplace the broken or defective wash basin in the bathroomIssued Nov 4, 2024 · fix by Nov 10, 2024 overdue · rent impairing · Violation #17389236
- CPlumbing, sinks and toiletsRepair the broken or defective connection sink waste line pipe in the kitchenIssued Nov 4, 2024 · fix by Nov 10, 2024 overdue · Violation #17389235
- BLeaks and water damageRepair the leaky and/or defective faucets wash basin in the bathroomIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17389237
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Nov 4, 2024 · fix by Nov 18, 2024 overdue · Violation #17389239
- BBroken doors or locksProperly repair or replace the broken or defective latch, south fire door at public hall, 1st storyIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17389244
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Aug 21, 2024 · fix by Aug 27, 2024 overdue · Violation #17208512
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Aug 21, 2024 · fix by Sep 25, 2024 overdue · Violation #17208515
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Aug 21, 2024 · fix by Sep 25, 2024 overdue · Violation #17208514
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Aug 21, 2024 · fix by Sep 25, 2024 overdue · Violation #17208513
- BMoldTrace and repair the source and abate the visible mold condition approximately 4 square feet at north wall in the bathroomIssued Feb 7, 2024 · fix by Mar 13, 2024 overdue · Violation #16660955
- BMoldTrace and repair the source and abate the visible mold condition approximately 5 square feet at north wall in the bathroomIssued Feb 7, 2024 · fix by Mar 13, 2024 overdue · Violation #16660977
- BMoldTrace and repair the source and abate the visible mold condition approximately 2 square feet at east wall in the bathroomIssued Feb 7, 2024 · fix by Mar 13, 2024 overdue · Violation #16660978
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.