Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Lower East Side

155 Chrystie Street, Manhattan

10002 · 8 apartments · 5 stories · City Council district 1

By · Updated · Data from NYC HPD

C
6open immediately hazardous violations · 75 per 100 apartments
B21Hazardous, open
A11Non-hazardous, open
!30Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyMAN 441 LLC
Landlord (head officer or owner)Mehmet Capin

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    14
  2. Peeling paint and plaster
    8
  3. Mold
    5
  4. Leaks and water damage
    4
  5. No heat or hot water
    2
  6. Broken doors or locks
    2
  7. Electrical problems
    2
  8. Roaches
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C72 days
from 14 closed · NYC typical: 87 days
B83 days
from 10 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsRemove all encumbrances consisting of accumulation of household items, luggage, shoe rack, shoe boxes etc at public hall, 4th storyIssued Oct 15, 2026 · fix by Nov 19, 2026 · rent impairing · Violation #19302873
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 14, 2026 · fix by Oct 9, 2026 overdue · rent impairing · Violation #19289687
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19295527
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19289720
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19178423
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at ceiling in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19178424
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19178422
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Sep 3, 2026 · fix by Sep 9, 2026 overdue · Violation #19185609
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185602
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185603
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 3, 2026 · fix by Sep 3, 2026 overdue · rent impairing · Violation #19185608
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at southIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185607
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185606
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the kitchenIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185605
  • B
    Other repairsRemove all encumbrances consisting of at household items at public hall, 4th storyIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · rent impairing · Violation #19162502
  • B
    Other repairsRemove all encumbrances consisting of at household items at public hall, 3rd storyIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · rent impairing · Violation #19162501
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of water bugs at public hall, 1st storyIssued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19117510
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroomIssued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19117509
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling at bulkhead areaIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19007545
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of airconditioner unit installed at fire escape window in the 3rd room from northIssued May 8, 2025 · fix by Jun 12, 2025 overdue · Violation #17880700
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 5 sq ft at the ceiling in the bathroomIssued Aug 14, 2024 · fix by Sep 18, 2024 overdue · Violation #17196961
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 15 sq ft at the ceiling in the kitchenIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16878975
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 8, 2023 · fix by Jan 3, 2024 overdue · Violation #16506086
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th storyIssued Aug 16, 2023 · fix by Sep 20, 2023 overdue · Violation #12560280
  • B
    Other repairsProperly repair with similar material the broken or defective metal ceiling in the kitchenIssued Aug 16, 2023 · fix by Sep 20, 2023 overdue · Violation #13880633
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Aug 16, 2023 · fix by Sep 20, 2023 overdue · Violation #13880635
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of uncapped radiator shut off valve in the 2nd room from north at eastIssued Aug 16, 2023 · fix by Aug 22, 2023 overdue · Violation #13880673

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

112017
102018
172019
22020
142023
112024
12025
422026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 212 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.