Housing violations · Parkchester
1919 Mc Graw Avenue, Bronx
10462 · 104 apartments · 13 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster10
- Broken doors or locks8
- Other repairs6
- Missing smoke or CO detector4
- Lead paint4
- Leaks and water damage3
- Roaches3
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 10 closed · NYC typical: 87 days
from 24 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from northIssued Nov 16, 2026 · Violation #19372894
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 16, 2026 · Violation #19372893
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 16, 2026 · Violation #19372891
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 16, 2026 · Violation #19372892
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and west wall in the 3rd room from northIssued Nov 16, 2026 · Violation #19372895
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367430
- BBroken doors or locksProperly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to panel at east wall in the foyerIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367432
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19367431
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367429
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304165
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19304164
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #14651088
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at east wall in the bathroomIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #14651089
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyerIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #15416604
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north, east, south and west walls in the 2nd room from northIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #13927236
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroomIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #13927237
- BOther repairsProperly secure the loose ceramic tiles at the south and east walls in the bathroomIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #13927239
- BOther repairsAbate the infestation consisting of vermin centepeed in the entire apartmentIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #13927231
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the 4th room from north at eastIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #14585945
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 3rd room from north at westIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #15416599
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #13927226
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the kitchenIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #13927227
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Oct 11, 2022 · fix by Nov 4, 2022 overdue · Violation #15419262
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 11, 2022 · fix by Nov 4, 2022 overdue · Violation #15418641
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 11, 2022 · fix by Nov 4, 2022 overdue · Violation #15418640
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 11, 2022 · fix by Nov 4, 2022 overdue · Violation #15418639
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 7, 2020 · fix by Jan 2, 2021 overdue · Violation #13925738
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.