Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Parkchester

1925 Mc Graw Avenue, Bronx

10462 · 338 apartments · 13 stories · City Council district 18

By · Updated · Data from NYC HPD

C
35open immediately hazardous violations · 10 per 100 apartments
B12Hazardous, open
A11Non-hazardous, open
!58Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyTHE PARKCHESTER SOUTH CONDOMINIUM, INC.
Landlord (head officer or owner)Juan Torres

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Lead paint
    26
  2. Peeling paint and plaster
    14
  3. Leaks and water damage
    4
  4. Mold
    4
  5. Roaches
    3
  6. No heat or hot water
    2
  7. Other repairs
    2
  8. Broken doors or locks
    1
  9. Missing smoke or CO detector
    1
  10. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C21 days
from 57 closed · NYC typical: 87 days
B85 days
from 54 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19304316
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot waterer exceeds the maximum of 130 degrees in the entire apartmentIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19305859
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 19, 2026 · fix by Oct 17, 2026 overdue · rent impairing · Violation #19304314
  • B
    Other repairsProperly repair or replace the broken or defective cabinet at north wall in the kitchenIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18676324
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the kitchenIssued Nov 29, 2024 · fix by Jan 3, 2025 overdue · Violation #17481694
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Nov 29, 2024 · fix by Jan 3, 2025 overdue · Violation #17481695
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Nov 29, 2024 · fix by Jan 3, 2025 overdue · Violation #17481696
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 5, 2024 · fix by Jul 31, 2024 overdue · Violation #17093727
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling inside the west wall closet in the 1st room from eastIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16933417
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 22, 2024 · fix by May 18, 2024 overdue · Violation #16903043
  • B
    Other repairsProperly repair with similar material the broken or defective rotten wooden floor in the kitchenIssued Apr 22, 2024 · fix by May 27, 2024 overdue · Violation #16903042
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at 1st closet from north at east wall ceiling in the foyerIssued Apr 12, 2024 · fix by May 17, 2024 overdue · Violation #16869940
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchenIssued Apr 12, 2024 · fix by May 17, 2024 overdue · Violation #16869946
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 10, 2024 · fix by May 6, 2024 overdue · Violation #16829201
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Feb 27, 2024 · fix by Apr 2, 2024 overdue · Violation #16702373
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceilings. in the entire apartmentIssued Feb 7, 2024 · fix by Mar 13, 2024 overdue · Violation #11804019
  • C
    MoldTrace and repair the source and abate the visible mold condition in closet on ceiling approx. 6 sq ft., east wall approx. 12 sq ft., south wall approx. 6 sq…Issued Oct 20, 2021 · fix by Nov 15, 2021 overdue · Violation #14637499
  • C
    MoldTrace and repair the source and abate the visible mold condition on closet ceiling approx. 6 sq ft., closet east wall approx. 24 sq ft., closet south wall…Issued Jul 28, 2021 · fix by Aug 23, 2021 overdue · Violation #14463543
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 29, 2021 · fix by Apr 24, 2021 overdue · Violation #14093580
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 19, 2021 · fix by Mar 23, 2021 overdue · Violation #14019789
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 19, 2021 · fix by Mar 23, 2021 overdue · Violation #14019795
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 19, 2021 · fix by Mar 23, 2021 overdue · Violation #14019796
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 19, 2021 · fix by Mar 23, 2021 overdue · Violation #14019797
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 19, 2021 · fix by Mar 23, 2021 overdue · Violation #14019799
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 19, 2021 · fix by Mar 23, 2021 overdue · Violation #14019802
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Mar 19, 2021 · fix by Mar 23, 2021 overdue · Violation #14019807
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 19, 2021 · fix by Mar 23, 2021 overdue · Violation #14019791
  • B
    MoldTrace and repair the source and abate the visible mold condition on east wall approx. 2 sq ft. in the kitchenIssued Jan 19, 2021 · fix by Feb 23, 2021 overdue · Violation #13988070
  • B
    MoldTrace and repair the source and abate the visible mold condition on east window stool approx. 2 sq ft. in the bathroomIssued Jan 19, 2021 · fix by Feb 23, 2021 overdue · Violation #13988069
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Feb 14, 2020 · fix by Feb 20, 2020 overdue · Violation #13600288
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Feb 14, 2020 · fix by Feb 20, 2020 overdue · Violation #13600292
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Feb 14, 2020 · fix by Feb 20, 2020 overdue · Violation #13600291
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Feb 14, 2020 · fix by Feb 20, 2020 overdue · Violation #13600290
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Feb 14, 2020 · fix by Feb 20, 2020 overdue · Violation #13600289
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Feb 14, 2020 · fix by Feb 20, 2020 overdue · Violation #13600286
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Feb 11, 2020 · fix by Feb 17, 2020 overdue · Violation #13594017
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Feb 11, 2020 · fix by Feb 17, 2020 overdue · Violation #13594022
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Feb 11, 2020 · fix by Feb 17, 2020 overdue · Violation #13594020
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Feb 11, 2020 · fix by Feb 17, 2020 overdue · Violation #13594018
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Feb 11, 2020 · fix by Feb 17, 2020 overdue · Violation #13594021
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Jan 31, 2020 · fix by Feb 6, 2020 overdue · Violation #13573892
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 16, 2004 · fix by Dec 12, 2004 overdue · Violation #5196555
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint north south wall 4th sty northeastIssued Dec 29, 1998 · fix by Jan 18, 1999 overdue · Violation #710909
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling walls steam riser 4th sty northeastIssued Dec 29, 1998 · fix by Jan 18, 1999 overdue · Violation #710908
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint east & west wall 10th sty southwestIssued Sep 16, 1997 · fix by Oct 6, 1997 overdue · Violation #710897
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling & west wall 10th sty southwestIssued Sep 16, 1997 · fix by Oct 6, 1997 overdue · Violation #710896
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint steam riser 10th sty southwestIssued Sep 16, 1997 · fix by Oct 6, 1997 overdue · Violation #710895

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

422020
332021
42023
992024
232025
302026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 240 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.