Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Concourse-Concourse Village

85 Mc Clellan Street, Bronx

10452 · 51 apartments · 6 stories · City Council district 16

By · Updated · Data from NYC HPD

C
16open immediately hazardous violations · 31 per 100 apartments
B31Hazardous, open
A7Non-hazardous, open
!35Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company85 MCCLELLAN STREET OWNERS, INC
Landlord (head officer or owner)David Tennenbaum

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    17
  2. Mold
    12
  3. Broken doors or locks
    8
  4. Peeling paint and plaster
    5
  5. Missing smoke or CO detector
    4
  6. Lead paint
    4
  7. Roaches
    3
  8. No heat or hot water
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C85 days
from 34 closed · NYC typical: 87 days
B108 days
from 46 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective inoperable hinges in the entranceIssued Nov 2, 2026 · fix by Nov 16, 2026 · Violation #19340316
  • B
    Other repairsProperly repair or replace the broken or defective intercom in private hall at west wall in the private hallwayIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340315
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock, latch set and assemblies at vestibule door at basementIssued Oct 21, 2026 · fix by Oct 27, 2026 overdue · Violation #19317245
  • B
    Broken doors or locksProvide approved glass in place of plexiglass at building entrance door at basementIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19317251
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at building entrance door at basementIssued Oct 21, 2026 · fix by Oct 27, 2026 overdue · Violation #19317250
  • C
    Other repairsProperly repair or replace the broken or defective , detached casement window at east wall at intermediate landing, public hall stair at 1st storyIssued Oct 21, 2026 · fix by Oct 27, 2026 overdue · Violation #19317243
  • B
    Other repairsProvide approved glass in place of plexiglass at casement window at east wall at intermediate landing, public hall stair at basementIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19317241
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of plexiglass installed at casement window at east wall at intermediate landing, public hall stair at basementIssued Oct 21, 2026 · fix by Oct 27, 2026 overdue · Violation #19317240
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the entire apartmentIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290577
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the foyerIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290575
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290579
  • B
    Broken doors or locksProperly repair with similar material the broken or defective closet door at east wall in the foyerIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290574
  • B
    Other repairsProperly repair with similar material the broken or defective window frame at south wall in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290572
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290571
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290580
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from east at southIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290581
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the entire apartmentIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290578
  • B
    MoldTrace and repair the source and abate the visible mold condition observed more than 10 sq ft at west wall in the 1st room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212226
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19212222
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212227
  • B
    Broken doors or locksProperly repair or replace the broken or defective closet door at east wallIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212223
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212228
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212225
  • C
    MoldTrace and repair the source and abate the visible mold condition observed more than 30 sqft at ceiling, at north wall,and west wall in the bathroomIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19212221
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 14, 2026 · fix by Sep 13, 2026 overdue · rent impairing · Violation #19212224
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of discarded gas range with doors attached at floor at public hall, 1st storyIssued Sep 14, 2026 · fix by Sep 20, 2026 overdue · Violation #19212229
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the entranceIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19179228
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19179229
  • B
    MoldTrace and repair the source and abate the visible mold condition at north wall less than 10 sq.ft in the 1st bathroom from northIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19142664
  • B
    MoldTrace and repair the source and abate the visible mold condition at east wall and ceiling less than 10 sq.ft in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19142665
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 20 sqft at ceiling and walls in the bathroomIssued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18926840
  • B
    Other repairsProperly repair or replace the broken or defective north window in the 2nd room from northIssued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18926843
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor at in the kitchenIssued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18926838
  • B
    Broken doors or locksProperly repair or replace the broken or defective door in the 2nd room from northIssued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18926844
  • B
    Other repairsProperly repair or replace the broken or defective light switch in the bathroomIssued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18926841
  • B
    MoldTrace and repair the source and abate the visible mold condition at west wall less than 30 sq.ft in the 2nd room from northIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18783572
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 15, 2026 · fix by May 11, 2026 overdue · Violation #18783571
  • B
    Other repairsProperly repair with similar material the broken or defective mortar in the brick joints at east exterior wall (near 1st window from south) , 3rd storyIssued Mar 25, 2026 · fix by Apr 29, 2026 overdue · Violation #18739459
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sqft at the west wall in the bathroomIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18107675
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sqft but less than 30 sqft at west wall, north wall and east wall in the 1st…Issued Feb 6, 2025 · fix by Mar 13, 2025 overdue · Violation #17672922
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the foyerIssued Aug 15, 2024 · fix by Sep 19, 2024 overdue · Violation #17191688
  • B
    Other repairsProperly repair with similar material the broken or defective rotten wood floor in the foyerIssued Aug 15, 2024 · fix by Sep 19, 2024 overdue · Violation #17191687
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jun 28, 2022 · fix by Jul 22, 2022 overdue · Violation #15235844
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jun 3, 2021 · fix by Jun 27, 2021 overdue · Violation #14366679
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 2, 2021 · fix by Jun 26, 2021 overdue · Violation #14366503
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 8, 2021 · fix by Apr 1, 2021 overdue · Violation #14060439
  • C
    Other repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Sep 7, 2010 · fix by Oct 3, 2010 overdue · Violation #8589144

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

222017
142018
172019
152020
282021
152022
42023
412024
482025
732026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 437 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.