Housing violations · Parkchester
1410 Metropolitan Avenue, Bronx
10462 · 54 apartments · 8 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster9
- Lead paint7
- Broken doors or locks5
- Leaks and water damage4
- No heat or hot water3
- Bedbugs2
- Other repairs2
- Missing smoke or CO detector1
- Roaches1
- Mice or rats1
- Mold1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 18 closed · NYC typical: 87 days
from 9 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Nov 12, 2026 · fix by Nov 26, 2026 · Violation #19368419
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352156
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the private hallwayIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352153
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallwayIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352154
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352155
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 19, 2026 · fix by Oct 17, 2026 overdue · rent impairing · Violation #19304496
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19304498
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 16, 2026 · fix by Oct 22, 2026 overdue · Violation #19300393
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 5, 2026 · fix by Oct 3, 2026 overdue · rent impairing · Violation #19269615
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19269616
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19263146
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19263147
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19263149
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19263148
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south and west walls in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19263145
- BBedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19205075
- BBedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Jul 1, 2026 · fix by Aug 5, 2026 overdue · Violation #19047953
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jul 1, 2026 · fix by Aug 5, 2026 overdue · Violation #19047954
- BOther repairsReplace with new the missing escutcheon plate at ceiling and floor at steam riser in the bathroomIssued Jul 1, 2026 · fix by Aug 5, 2026 overdue · Violation #19047951
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 27, 2026 · fix by May 23, 2026 overdue · Violation #18811241
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 27, 2026 · fix by May 23, 2026 overdue · Violation #18811242
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18811238
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 26, 2025 · fix by Dec 25, 2025 overdue · rent impairing · Violation #18527838
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Dec 26, 2025 · fix by Jan 1, 2026 overdue · Violation #18527839
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq at east wall in the 3rd room from north at eastIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17743691
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Nov 1, 2024 · fix by Nov 25, 2024 overdue · Violation #17392706
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 31, 2024 · fix by Nov 24, 2024 overdue · Violation #17392223
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 31, 2024 · fix by Nov 24, 2024 overdue · Violation #17392222
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 31, 2024 · fix by Nov 24, 2024 overdue · Violation #17392221
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 31, 2024 · fix by Nov 24, 2024 overdue · Violation #17392224
- COther repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Mar 16, 2015 · fix by Apr 13, 2015 overdue · Violation #10629232
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint clg at 3rd sty eastIssued Apr 5, 1994 · fix by Apr 25, 1994 overdue · Violation #924265
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint walls at 3rd sty eastIssued Apr 5, 1994 · fix by Apr 25, 1994 overdue · Violation #924264
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.