Housing violations · Parkchester
1690 Metropolitan Avenue, Bronx
10462 · 67 apartments · 8 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster42
- Leaks and water damage14
- Other repairs12
- Mold12
- Broken doors or locks9
- Roaches3
- Missing smoke or CO detector2
- Plumbing, sinks and toilets2
- Lead paint1
- No heat or hot water1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 8 closed · NYC typical: 87 days
from 10 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksProperly repair or replace the broken or defective latch set at door to stairwell b at 1st story at public hallIssued Jul 29, 2025 · fix by Aug 4, 2025 overdue · Violation #18115924
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Mar 5, 2025 · fix by Mar 29, 2025 overdue · Violation #17744465
- BMoldTrace and repair the source and abate the visible mold condition at the north wall approx 3 sq ft in the 2nd room from northIssued Jun 28, 2024 · fix by Aug 2, 2024 overdue · Violation #17088305
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and north wall in the bathroomIssued Feb 29, 2024 · fix by Apr 4, 2024 overdue · Violation #16709466
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak behind the north wall in the 2nd room from northIssued Feb 29, 2024 · fix by Apr 4, 2024 overdue · Violation #16709464
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the south wall in the 1st room from northIssued Feb 29, 2024 · fix by Apr 4, 2024 overdue · Violation #16704248
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak behind the south wall in the 1st room from northIssued Feb 29, 2024 · fix by Apr 4, 2024 overdue · Violation #16704249
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the bathroomIssued Feb 29, 2024 · fix by Apr 4, 2024 overdue · Violation #16709468
- BMoldTrace and repair the source and abate the visible mold condition at north wall of the closet approx 2 sq ft in the foyerIssued Jan 8, 2024 · fix by Feb 12, 2024 overdue · Violation #16575450
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 13, 2023 · fix by Dec 9, 2023 overdue · Violation #16372116
- BBroken doors or locksProperly secure the loose wood door saddle in the 3rd room from northIssued Oct 16, 2023 · fix by Nov 20, 2023 overdue · Violation #16306363
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from northIssued Oct 16, 2023 · fix by Nov 20, 2023 overdue · Violation #16306355
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 1st room from northIssued Oct 16, 2023 · fix by Nov 20, 2023 overdue · Violation #16306359
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Oct 16, 2023 · fix by Nov 20, 2023 overdue · Violation #16306360
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from northIssued Oct 16, 2023 · fix by Nov 20, 2023 overdue · Violation #16306362
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Oct 16, 2023 · fix by Nov 20, 2023 overdue · Violation #16306361
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at celing in the bathroomIssued Sep 8, 2023 · fix by Oct 13, 2023 overdue · Violation #16212291
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding 130 degrees in the bathroomIssued Sep 8, 2023 · fix by Sep 14, 2023 overdue · Violation #16212296
- BBroken doors or locksRefit the entrance door in the bathroomIssued Sep 8, 2023 · fix by Oct 13, 2023 overdue · Violation #16212298
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective the 2nd egress door at west wall in the 2nd room from northIssued Sep 8, 2023 · fix by Sep 22, 2023 overdue · Violation #16212299
- CLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 8, 2023 · fix by Sep 14, 2023 overdue · Violation #16212295
- BBroken doors or locksProperly secure the loose wood saddle at door to private hallway in the 2nd room from northIssued Sep 8, 2023 · fix by Oct 13, 2023 overdue · Violation #16212301
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the 2nd room from northIssued Sep 8, 2023 · fix by Oct 13, 2023 overdue · Violation #16212302
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 4th room from northIssued Sep 8, 2023 · fix by Oct 13, 2023 overdue · Violation #16212303
- BOther repairsProperly repair with similar material the broken or defective broken and splinterinf wood tiles at the north wall in the 4th room from northIssued Sep 8, 2023 · fix by Oct 13, 2023 overdue · Violation #16212304
- BBroken doors or locksProperly repair with similar material the broken or defective wood saddle at entrance door in the 4th room from northIssued Sep 8, 2023 · fix by Oct 13, 2023 overdue · Violation #16212305
- BBroken doors or locksProperly repair with similar material the broken or defective broken wood entrance door in the 4th room from northIssued Sep 8, 2023 · fix by Oct 13, 2023 overdue · Violation #16212306
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2023 · fix by Oct 4, 2023 overdue · Violation #16212308
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallwayIssued Sep 13, 2022 · fix by Oct 18, 2022 overdue · Violation #15357902
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the foyerIssued Sep 13, 2022 · fix by Oct 18, 2022 overdue · Violation #15357899
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroomIssued Sep 13, 2022 · fix by Oct 18, 2022 overdue · Violation #15357901
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Sep 13, 2022 · fix by Oct 18, 2022 overdue · Violation #15357900
- BOther repairsReplace with new the broken or defective metal base cabinet at east and west walls in the kitchenIssued Sep 13, 2022 · fix by Oct 18, 2022 overdue · Violation #15357898
- BOther repairsProperly repair with similar material the broken or defective wood floors in the 1st room from eastIssued Jun 21, 2022 · fix by Jul 26, 2022 overdue · Violation #15216177
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 21, 2022 · fix by Jul 17, 2022 overdue · Violation #15216184
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 21, 2022 · fix by Jul 17, 2022 overdue · Violation #15216183
- BOther repairsProperly repair with similar material the broken or defective cement floors inside closet at north wall in the 2nd room from eastIssued Jun 21, 2022 · fix by Jul 26, 2022 overdue · Violation #15216181
- BOther repairsProperly repair with similar material the broken or defective cement floors at west wall inside closet in the 1st entrance from east at southIssued Jun 21, 2022 · fix by Jul 26, 2022 overdue · Violation #15216180
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the bathroomIssued Jun 21, 2022 · fix by Jul 26, 2022 overdue · Violation #15216179
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from eastIssued Jun 21, 2022 · fix by Jul 26, 2022 overdue · Violation #15216178
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling in the 1st room from eastIssued Feb 2, 2022 · fix by Mar 9, 2022 overdue · Violation #14802645
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from eastIssued Feb 2, 2022 · fix by Feb 8, 2022 overdue · Violation #14802646
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the. ceiling in the bathroomIssued Feb 2, 2022 · fix by Feb 8, 2022 overdue · Violation #14802644
- BMoldTrace and repair the source and abate the visible mold condition on the west wall approx 3 sq ft & south wall approx 3 sq ft in the closet in the private…Issued Feb 25, 2020 · fix by Mar 31, 2020 overdue · Violation #13617849
- BMoldTrace and repair the source and abate the visible mold condition ceiling approx 1 sq ft south wall approx 1 sq ft in the bathroomIssued Feb 7, 2020 · fix by Mar 13, 2020 overdue · Violation #13591645
- BMoldTrace and repair the source and abate the visible mold condition ceiling approx 1 sq ft west wall approx 1 sq ft in the private hallwayIssued Feb 7, 2020 · fix by Mar 13, 2020 overdue · Violation #13591646
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak closet ceiling and west wall in the private hallwayIssued Oct 10, 2019 · fix by Nov 14, 2019 overdue · Violation #13331192
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling and south wall in the bathroomIssued Oct 10, 2019 · fix by Nov 14, 2019 overdue · Violation #13331178
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroomIssued Oct 10, 2019 · fix by Nov 14, 2019 overdue · Violation #13331179
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the private hallwayIssued Oct 10, 2019 · fix by Nov 14, 2019 overdue · Violation #13331195
- BMissing smoke or CO detectorRepair or replace the smoke detector defectiveIssued Feb 19, 2019 · fix by Mar 26, 2019 overdue · Violation #12912576
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east and south walls in the 3rd room from eastIssued Feb 19, 2019 · fix by Mar 26, 2019 overdue · Violation #12912572
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from eastIssued Feb 19, 2019 · fix by Mar 26, 2019 overdue · Violation #12912568
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroomIssued Feb 19, 2019 · fix by Mar 26, 2019 overdue · Violation #12912565
- CMoldTrace and repair the source and abate the visible mold condition approx 30 square feet at ceiling, east, south and west walls in the bathroomIssued Feb 19, 2019 · fix by Mar 12, 2019 overdue · Violation #12912554
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from north at westIssued Aug 7, 2017 · fix by Sep 11, 2017 overdue · rent impairing · Violation #11911750
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north at westIssued Aug 7, 2017 · fix by Sep 11, 2017 overdue · Violation #11911765
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from north at westIssued Aug 7, 2017 · fix by Sep 11, 2017 overdue · rent impairing · Violation #11911763
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 1st room from north at westIssued Aug 7, 2017 · fix by Sep 11, 2017 overdue · Violation #11911751
- BLeaks and water damageSection 27-2005 adm code repair the roof so that it will not leak over ceiling in the private hallwayIssued Jul 25, 2016 · fix by Aug 29, 2016 overdue · rent impairing · Violation #11323885
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.