Housing violations · Morningside Heights
192 Claremont Avenue, Manhattan
10027 · 20 apartments · 5 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
21 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs54
- Peeling paint and plaster36
- Broken doors or locks21
- Plumbing, sinks and toilets17
- Leaks and water damage13
- Missing smoke or CO detector10
- Roaches5
- Mold5
- No heat or hot water4
- Electrical problems4
- Mice or rats3
- Bedbugs2
- Lead paint2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 70 closed · NYC typical: 87 days
from 42 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BBedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19186817
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Feb 2, 2026 · fix by Feb 28, 2026 overdue · rent impairing · Violation #18604868
- CPlumbing, sinks and toiletsRemove all obstructions and repair all defects in water clogged drain at north yardIssued Feb 2, 2026 · fix by Feb 8, 2026 overdue · rent impairing · Violation #18604863
- BOther repairsProperly repair or replace the broken or defective intercom system at building entrance at public hall, 1st storyIssued Jan 29, 2026 · fix by Mar 5, 2026 overdue · Violation #18604869
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 26, 2026 · fix by Feb 21, 2026 overdue · Violation #18597852
- COther repairsReplace with new the missing shut off valve at radiator in the 1st room from eastIssued Jan 26, 2026 · fix by Feb 1, 2026 overdue · Violation #18597872
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at east and west wall in the bathroomIssued Jan 26, 2026 · fix by Feb 1, 2026 overdue · Violation #18597858
- BOther repairsProperly repair or replace the broken or defective intercom system at public hall, 1st storyIssued Jan 16, 2026 · fix by Feb 20, 2026 overdue · Violation #18577446
- BOther repairsProperly repair or replace the broken or defective intercom system in the entranceIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564768
- BOther repairsProperly repair or replace the broken or defective intercom system in the entranceIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564762
- BOther repairsProperly repair with similar material the broken or defective at west wall at public hall, 5th storyIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18557616
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket seal on refrigeraor lower door in the kitchenIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18557605
- BOther repairsProperly repair or replace the broken or defective intercom in the entranceIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18555888
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 5, 2026 · fix by Jan 4, 2026 overdue · rent impairing · Violation #18555885
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18555895
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 4th room from eastIssued Dec 12, 2025 · fix by Jan 16, 2026 overdue · Violation #18507311
- BBroken doors or locksReplace with new the missing base cabinet door at west wall in the kitchenIssued Dec 3, 2025 · fix by Jan 7, 2026 overdue · Violation #18486382
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Dec 3, 2025 · fix by Jan 7, 2026 overdue · Violation #18486381
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Dec 3, 2025 · fix by Jan 7, 2026 overdue · Violation #18486383
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Aug 29, 2025 · fix by Oct 3, 2025 overdue · Violation #18195143
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 29, 2025 · fix by Sep 24, 2025 overdue · Violation #18195141
- BBroken doors or locksProperly repair or replace the broken or defective door frame at west wall in the entranceIssued Aug 29, 2025 · fix by Oct 3, 2025 overdue · Violation #18195162
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket at refrigerator door in the kitchenIssued Aug 29, 2025 · fix by Oct 3, 2025 overdue · Violation #18195145
- BOther repairsProperly repair with similar material the broken or defective wood flooring in the 3rd room from northIssued Aug 29, 2025 · fix by Oct 3, 2025 overdue · Violation #18195153
- BBroken doors or locksProperly repair or replace the broken or defective base cabinet door at west wall in the kitchenIssued Aug 29, 2025 · fix by Oct 3, 2025 overdue · Violation #18195157
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchenIssued Aug 13, 2025 · fix by Sep 17, 2025 overdue · Violation #18163700
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the north wall and ceiling in the 1st room from east at southIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18101080
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north and east wall. in the 1st room from east at southIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18101070
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall. in the bathroomIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18101084
- BOther repairsProperly repair with similar material the broken or defective upper kitchen cabinets in the kitchenIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18101083
- BOther repairsProperly repair with similar material the broken or defective baseboard at the east wall in the kitchenIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18101082
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north and south walls in the 1st room from east at northIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18101081
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and east wall in the bathroomIssued Jul 18, 2025 · fix by Jul 24, 2025 overdue · Violation #18101059
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east and south wall in the private hallwayIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18101064
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from east at southIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18101069
- BPlumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at bathtub in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · rent impairing · Violation #18046683
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18046686
- BOther repairsProperly repair with similar material the broken or defective grout at all wall tiles in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18046685
- COther repairsProvide an adequate supply of gas to the fixtures stove in kitchen in the entire apartmentIssued Jun 18, 2025 · fix by Jun 24, 2025 overdue · rent impairing · Violation #18043233
- BPlumbing, sinks and toiletsRepair the broken or defective connection under kitchen sink in the kitchenIssued Jun 18, 2025 · fix by Jul 23, 2025 overdue · Violation #18043242
- BOther repairsProvide an adequate supply of gas to the fixtures at stove in the kitchenIssued May 20, 2025 · fix by Jun 24, 2025 overdue · rent impairing · Violation #17905564
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the private hallwayIssued May 20, 2025 · fix by Jun 24, 2025 overdue · Violation #17905568
- BMoldTrace and repair the source and abate the visible mold condition at east wall interior of base cabinet at sink less than 10sq ft in the kitchenIssued May 5, 2025 · fix by Jun 9, 2025 overdue · Violation #17875040
- BOther repairsProvide an adequate supply of gas to the fixtures at stove cause unknown in the entire apartmentIssued Apr 18, 2025 · fix by May 23, 2025 overdue · rent impairing · Violation #17842014
- BPeeling paint and plasterProperly repair with similar material the broken or defective plaster with fire rated material at the north wall and the ceiling at the bulkhead at public hall…Issued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825646
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective cabinet base at the wash basin. in the bathroomIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825626
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and south and north walls in the 1st room from east at northIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825603
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the south and north walls. in the 1st room from east at northIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825605
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north and south walls in the foyerIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825608
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and north and south walls in the foyerIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825607
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall. in the bathroomIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825582
- BOther repairsProvide an adequate supply of gas to the fixtures at the gas range in the kitchenIssued Apr 11, 2025 · fix by May 16, 2025 overdue · rent impairing · Violation #17825589
- BBroken doors or locksProperly repair or replace the broken or defective door in the bathroomIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825625
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at the ceiling in the bathroomIssued Apr 11, 2025 · fix by Apr 17, 2025 overdue · Violation #17825638
- CElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the ceiling in the 4th room from east at southIssued Apr 11, 2025 · fix by Apr 17, 2025 overdue · Violation #17825623
- BOther repairsProperly repair or replace the broken or defective shutoff valve at the radiator in the 4th room from east at southIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825624
- BMoldTrace and repair the source and abate the visible mold condition at the east wall in the 1st room from east at southIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825597
- BOther repairsReplace with new the missing light fixture at the ceiling in the 4th room from east at southIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825618
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and east wall in the bathroomIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825579
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east and south walls in the kitchenIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825591
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.