Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Flatbush-Erasmus

211 Linden Boulevard, Brooklyn

11226 · 72 apartments · 6 stories · City Council district 40

By · Updated · Data from NYC HPD

C
18open immediately hazardous violations · 25 per 100 apartments
B58Hazardous, open
A16Non-hazardous, open
!92Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

11 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyPPSP ASSOCIATES LLC
Landlord (head officer or owner)Mordechai Piller

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    27
  2. Other repairs
    16
  3. Leaks and water damage
    12
  4. Broken doors or locks
    8
  5. Bedbugs
    6
  6. Mold
    5
  7. Mice or rats
    5
  8. Missing smoke or CO detector
    4
  9. Electrical problems
    4
  10. Roaches
    3
  11. Plumbing, sinks and toilets
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C113 days
from 56 closed · NYC typical: 87 days
B248 days
from 31 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at door in the entranceIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18577412
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at door in the compactor closetIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18571423
  • B
    Other repairsProperly repair or replace the broken or defective latch set at entrance from fire passageway, section a in the basementIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18571359
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at door in the entranceIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18577408
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges and door in the entranceIssued Jan 15, 2026 · fix by Jan 29, 2026 overdue · Violation #18577162
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at hopper door, section b in the compactor closetIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18577402
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at door, section a in the compactor closetIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18571362
  • B
    Other repairsProperly repair or replace the broken or defective latch set at building entrance, section aIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18570663
  • B
    Other repairsProperly repair or replace the broken or defective latch set at building entrance, section b in the public hallIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18577138
  • C
    Broken doors or locksProperly repair or replace the broken or defective locking device at building entrance door , section ''b''Issued Sep 29, 2025 · fix by Oct 5, 2025 overdue · Violation #18266930
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued May 6, 2025 · fix by Jun 10, 2025 overdue · Violation #17881923
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft inside closet at west wall in the private hallwayIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17826085
  • B
    Other repairsReplace with new the missing roof shingles- (building a ) frontIssued Mar 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17737008
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Dec 23, 2024 · fix by Dec 29, 2024 overdue · rent impairing · Violation #17576877
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the foyerIssued Dec 23, 2024 · fix by Jan 27, 2025 overdue · Violation #17576838
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Dec 23, 2024 · fix by Jan 27, 2025 overdue · Violation #17576843
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Dec 23, 2024 · fix by Jan 27, 2025 overdue · Violation #17576787
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Dec 23, 2024 · fix by Jan 27, 2025 overdue · Violation #17576773
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 4th room from eastIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · rent impairing · Violation #17554495
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from eastIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · rent impairing · Violation #17554502
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · Violation #17554505
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 5th room from eastIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · rent impairing · Violation #17554507
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroomIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · Violation #17554635
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · Violation #17554636
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor near radiator in the 1st room from northIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · Violation #17554638
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from eastIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · Violation #17554508
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from eastIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · rent impairing · Violation #17554504
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · Violation #17554503
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · Violation #17554499
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · Violation #17554496
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 2nd room from eastIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · rent impairing · Violation #17554498
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Oct 24, 2024 · fix by Nov 28, 2024 overdue · Violation #17365001
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Oct 24, 2024 · fix by Nov 28, 2024 overdue · Violation #17365000
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Oct 24, 2024 · fix by Nov 28, 2024 overdue · Violation #17364999
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Oct 24, 2024 · fix by Nov 28, 2024 overdue · Violation #17365002
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at all lighting fixtures and electrical outlets in the private hallwayIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17359881
  • C
    Mice or ratsAbate the infestation consisting of rodents rats in the entire apartmentIssued Oct 23, 2024 · fix by Nov 18, 2024 overdue · rent impairing · Violation #17359873
  • B
    Other repairsFire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate , in the entire apartmentIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17359874
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17359880
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the kitchenIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17359875
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at all lighting fixtures and electrical outlets in the 4th room from northIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17359882
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17359878
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at all lighting fixtures and electrical outlets in the bathroomIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17359879
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at all lighting fixtures and electrical outlets in the kitchenIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17359876
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and west wall in the kitchenIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17359872
  • B
    MoldTrace and repair the source and abate the visible mold condition (approx 1 sq ft) at west wall in the bathroomIssued Sep 9, 2024 · fix by Oct 14, 2024 overdue · Violation #17256931
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color approx 15 sq ft at ceiling in the bathroomIssued Jun 17, 2024 · fix by Jul 22, 2024 overdue · Violation #17044643
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 14, 2024 · fix by Jul 10, 2024 overdue · Violation #17044642
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 14, 2024 · fix by Jul 10, 2024 overdue · Violation #17044641
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor near radiator in the 1st room from north at westIssued May 10, 2024 · fix by May 16, 2024 overdue · Violation #16951968
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued May 10, 2024 · fix by Jun 14, 2024 overdue · Violation #16951967
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at the west wall in the bathroomIssued Feb 9, 2024 · fix by Mar 15, 2024 overdue · Violation #16657800
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Feb 9, 2024 · fix by Mar 15, 2024 overdue · Violation #16657799
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 9, 2024 · fix by Mar 6, 2024 overdue · Violation #16657801
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles at walking area in the kitchenIssued Oct 18, 2023 · fix by Nov 22, 2023 overdue · Violation #16314688
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Oct 18, 2023 · fix by Nov 22, 2023 overdue · Violation #16314684
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic wall tiles at west in the bathroomIssued Oct 18, 2023 · fix by Nov 22, 2023 overdue · Violation #16314683
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Oct 10, 2023 · fix by Oct 16, 2023 overdue · Violation #16281508
  • B
    Leaks and water damageRepair the roof so that it will not leak above the ceiling in the 4th room from eastIssued Oct 10, 2023 · fix by Nov 14, 2023 overdue · rent impairing · Violation #16281507
  • B
    Leaks and water damageRepair the roof so that it will not leak above the ceiling in the 2nd room from eastIssued Oct 10, 2023 · fix by Nov 14, 2023 overdue · rent impairing · Violation #16281505

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

522017
972018
162019
232020
412021
182022
422023
972024
162025
282026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 825 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.