Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Mount Hope

1855 Monroe Avenue, Bronx

10457 · 37 apartments · 6 stories · City Council district 15

By · Updated · Data from NYC HPD

C
22open immediately hazardous violations · 59 per 100 apartments
B21Hazardous, open
A15Non-hazardous, open
!45Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company1855 REALTY LLC
Landlord (head officer or owner)David Kleiner

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    15
  2. Broken doors or locks
    10
  3. Peeling paint and plaster
    9
  4. Lead paint
    6
  5. Roaches
    6
  6. Missing smoke or CO detector
    4
  7. Mice or rats
    4
  8. Mold
    2
  9. No heat or hot water
    1
  10. Leaks and water damage
    1
  11. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C84 days
from 111 closed · NYC typical: 87 days
B120 days
from 127 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Broken doors or locksProperly repair or replace the broken or defective latch and its assembly at building entrance door (from street to vestibule) at public hall, 1st storyIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361291
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door from street to vestibule at public hall, 1st storyIssued Nov 9, 2026 · fix by Nov 23, 2026 · Violation #19361290
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles floor at public hall, 1st storyIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361289
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 30, 2026 · fix by Nov 23, 2026 · Violation #19344075
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 30, 2026 · fix by Nov 23, 2026 · Violation #19344074
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 30, 2026 · fix by Nov 23, 2026 · Violation #19344073
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 21, 2026 · fix by Oct 27, 2026 overdue · Violation #19313084
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19313087
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 21, 2026 · fix by Oct 21, 2026 overdue · rent impairing · Violation #19313083
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19313088
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 21, 2026 · fix by Nov 16, 2026 · Violation #19313086
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19313085
  • C
    MoldTrace and repair the source and abate the visible mold condition more 30 than square feet of mold at ceiling, east, north walls, and window casing in the…Issued Sep 16, 2026 · fix by Oct 12, 2026 overdue · Violation #19218771
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 16, 2026 · fix by Oct 12, 2026 overdue · Violation #19218777
  • B
    Other repairsProperly repair with similar material the broken or defective metal upper escutcheon plate at steam riser in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218773
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from north at westIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218774
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, and west walls in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218778
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at westIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218775
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 16, 2026 · fix by Oct 12, 2026 overdue · Violation #19218776
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wood doors at lower cabinet at sink in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218768
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at waste at sink in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218770
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic wall tile at south wall in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218772
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 1st fire escape from east, north…Issued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19063621
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 1st fire escape from east, at south…Issued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19063622
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19063608
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door (from courtyard to vestibule) at 1st storyIssued Jul 9, 2026 · fix by Jul 23, 2026 overdue · Violation #19063625
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19063605
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set and assemblies at building entrance door (from courtyard to vestibule) at 1st storyIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19063627
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 9, 2026 · fix by Aug 4, 2026 overdue · Violation #19063599
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772196
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 9, 2026 · fix by May 5, 2026 overdue · Violation #18772197
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 9, 2026 · fix by May 5, 2026 overdue · Violation #18772198
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall in the 1st room from east at northIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18778439
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 9, 2026 · fix by May 3, 2026 overdue · Violation #18778952
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 9, 2026 · fix by May 3, 2026 overdue · Violation #18778950
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 17, 2026 · fix by Mar 15, 2026 overdue · Violation #18642005
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 17, 2026 · fix by Mar 15, 2026 overdue · Violation #18642004
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 2, 2025 · fix by Oct 28, 2025 overdue · Violation #18269172
  • C
    Broken doors or locksRemove the illegal double cylinder key operated locking device at door in the entranceIssued Oct 2, 2025 · fix by Oct 8, 2025 overdue · Violation #18269174
  • B
    Other repairsProperly repair with similar material the broken or defective wood subfloor in the 1st room from eastIssued Jul 17, 2025 · fix by Aug 21, 2025 overdue · Violation #18100374
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tile in the 1st room from eastIssued Jul 17, 2025 · fix by Aug 21, 2025 overdue · Violation #18100373
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jan 16, 2024 · fix by Feb 9, 2024 overdue · Violation #16602151
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 20, 2023 · fix by Dec 16, 2023 overdue · Violation #16395792

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

372017
102018
442019
362020
522021
1702022
922023
1452024
362025
782026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 865 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.