Housing violations · Tremont
2005 Monterey Avenue, Bronx
10457 · 15 apartments · 5 stories · City Council district 15
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks9
- Other repairs5
- Roaches5
- Plumbing, sinks and toilets5
- Leaks and water damage3
- Mice or rats3
- Mold2
- Peeling paint and plaster2
- No heat or hot water2
- Missing window guards1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 8 closed · NYC typical: 87 days
from 4 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at east wall cabinet in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19268208
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from northIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19228570
- BOther repairsProperly repair or replace the broken or defective wall cabinet at east wall in the kitchenIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19228569
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19228572
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at upper cabinet at east wall in the kitchenIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166676
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 3, 2026 · fix by Jun 29, 2026 overdue · Violation #18973759
- BBroken doors or locksProperly repair or replace the broken or defective glass pane at building entrance door , 1st storyIssued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18698633
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 11, 2026 · fix by Apr 6, 2026 overdue · Violation #18698631
- CPlumbing, sinks and toiletsReplace the broken or defective cracked wash basin in the 2nd bathroom from northIssued Mar 11, 2026 · fix by Mar 17, 2026 overdue · rent impairing · Violation #18698630
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 12, 2026 · fix by Feb 12, 2026 overdue · rent impairing · Violation #18635260
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Feb 12, 2026 · fix by Mar 10, 2026 overdue · Violation #18635264
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 12, 2026 · fix by Mar 10, 2026 overdue · Violation #18635262
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 12, 2026 · fix by Mar 10, 2026 overdue · Violation #18635263
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 12, 2026 · fix by Feb 18, 2026 overdue · Violation #18635261
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Jan 26, 2026 · fix by Feb 1, 2026 overdue · Violation #18589967
- BBroken doors or locksProperly repair or replace the broken or defective closet door at north wall in the private hallwayIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18589968
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Dec 23, 2025 · fix by Jan 18, 2026 overdue · rent impairing · Violation #18524452
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinets at sink in the kitchenIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18524453
- BOther repairsProperly repair or replace the broken or defective wood cabinets at east wall in the kitchenIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18524454
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 25, 2025 · fix by Oct 21, 2025 overdue · Violation #18250457
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from northIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18250459
- CBroken doors or locksProperly repair or replace the broken or defective heavy duty lock assembly at vestibule doorIssued Sep 25, 2025 · fix by Oct 1, 2025 overdue · Violation #18250460
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18250452
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 25, 2025 · fix by Oct 21, 2025 overdue · Violation #18250458
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in drain pipe at wash basin in the 1st bathroom from northIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · rent impairing · Violation #18250453
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in drain pipe at wash basin in the 2nd bathroom from northIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · rent impairing · Violation #18250455
- BOther repairsProperly repair or replace the broken or defective intercom panel in the vestibule at public hall, 1st storyIssued Jan 11, 2024 · fix by Feb 15, 2024 overdue · Violation #16576046
- CElectrical problemsProvide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for…Issued Jan 8, 2024 · fix by Jan 8, 2024 overdue · Violation #16576043
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 8, 2024 · fix by Jan 14, 2024 overdue · Violation #16576044
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 8, 2024 · fix by Jan 8, 2024 overdue · rent impairing · Violation #16576042
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Oct 6, 2023 · fix by Nov 10, 2023 overdue · Violation #16284841
- BOther repairsReplace with new the broken or defective glass pane at lower window sash in the 1st bathroom from northIssued Feb 22, 2023 · fix by Mar 29, 2023 overdue · Violation #15732400
- BLeaks and water damageRepair the leaky and/or defective water supply pipe at water closet in the 1st bathroom from northIssued Feb 22, 2023 · fix by Mar 29, 2023 overdue · rent impairing · Violation #15732401
- CBroken doors or locksProperly repair the broken or defective heavy duty lock at vestibule door at public hall, 1st storyIssued Aug 10, 2022 · fix by Aug 16, 2022 overdue · Violation #15310140
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.