Housing violations · Manhattanville-West Harlem
604 West 135 Street, Manhattan
10031 · 17 apartments · 5 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs11
- Peeling paint and plaster7
- Lead paint2
- Leaks and water damage2
- Mice or rats2
- Mold1
- Plumbing, sinks and toilets1
- Broken doors or locks1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 31 closed · NYC typical: 87 days
from 49 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at ceiling in the private hallwayIssued Sep 22, 2025 · fix by Oct 27, 2025 overdue · Violation #18246042
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued May 23, 2025 · fix by May 29, 2025 overdue · Violation #17919838
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from northIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17919803
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock at entrance door leading to fire escape window in the 2nd room from eastIssued May 23, 2025 · fix by May 29, 2025 overdue · Violation #17919783
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the private hallwayIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17919817
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17919806
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17919800
- BOther repairsProperly repair or replace the broken or defective intercom system from building entrance to apartment wall panel at south in the private hallwayIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17919789
- BLeaks and water damageRepair the roof so that it will not leak above the ceiling in the private hallwayIssued May 23, 2025 · fix by Jun 27, 2025 overdue · rent impairing · Violation #17919816
- BOther repairsProperly repair with similar material the broken or defective hardwood floors in the 1st room from northIssued Jan 27, 2025 · fix by Mar 3, 2025 overdue · Violation #17655080
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallwayIssued Oct 18, 2024 · fix by Nov 22, 2024 overdue · Violation #17353400
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall including window recess in the 1st room from north at centerIssued Oct 18, 2024 · fix by Nov 22, 2024 overdue · Violation #17353396
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall including window recess in the 1st room from north at westIssued Oct 18, 2024 · fix by Nov 22, 2024 overdue · Violation #17353394
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood cabinet under wash basin in the bathroomIssued Mar 14, 2024 · fix by Apr 18, 2024 overdue · Violation #16733901
- BOther repairsProperly repair or replace the broken or defective base cabinet at south floor board in the kitchenIssued Mar 14, 2024 · fix by Apr 18, 2024 overdue · Violation #16733900
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock on room door leading to fire escape in the 1st room from north at westIssued Mar 14, 2024 · fix by Mar 20, 2024 overdue · Violation #16733912
- BOther repairsProperly repair or replace the broken or defective intercom at east wall to building front in the foyerIssued Mar 13, 2024 · fix by Apr 17, 2024 overdue · Violation #16733886
- BOther repairsProperly repair or replace the broken or defective intercom at east wall to building front in the foyerIssued Mar 13, 2024 · fix by Apr 17, 2024 overdue · Violation #16733848
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 4, 2023 · fix by Dec 30, 2023 overdue · Violation #16495714
- BOther repairsProperly repair or replace the broken or defective bell and buzzer intercom system from building enterance to panel at east wall in the entranceIssued Sep 25, 2023 · fix by Oct 30, 2023 overdue · Violation #16237555
- BOther repairsProperly repair or replace the broken or defective intercom system at east wall in the 1st room from northIssued Sep 19, 2023 · fix by Oct 24, 2023 overdue · Violation #16235140
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 11, 2023 · fix by Sep 6, 2023 overdue · Violation #16150564
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.