Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Manhattanville-West Harlem

612 West 135 Street, Manhattan

10031 · 12 apartments · 5 stories · City Council district 7

By · Updated · Data from NYC HPD

C
12open immediately hazardous violations · 100 per 100 apartments
B18Hazardous, open
A6Non-hazardous, open
!34Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Open in Google Maps ↗

Who owns and manages it

Owning companyRiverview I Affordable Preservation, LLC
Landlord (head officer or owner)Herminio Torres

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Broken doors or locks
    8
  2. Other repairs
    7
  3. Mice or rats
    4
  4. Roaches
    4
  5. Lead paint
    4
  6. Mold
    4
  7. Peeling paint and plaster
    2
  8. Leaks and water damage
    2
  9. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C87 days
from 4 closed · NYC typical: 84 days
B112 days
from 2 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19311913
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19311912
  • B
    Broken doors or locksRefit door in the 4th room from east at northIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311911
  • B
    Broken doors or locksProperly repair or replace the broken or defective door in the 3rd room from east at southIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311910
  • B
    Broken doors or locksProperly repair or replace the broken or defective refridgerator door gasket in the kitchenIssued Aug 13, 2025 · fix by Sep 17, 2025 overdue · Violation #18163255
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 13, 2025 · fix by Sep 6, 2025 overdue · Violation #18163613
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 13, 2025 · fix by Sep 6, 2025 overdue · Violation #18163612
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 13, 2025 · fix by Sep 6, 2025 overdue · Violation #18163610
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 13, 2025 · fix by Sep 6, 2025 overdue · Violation #18163608
  • B
    Other repairsProperly repair or replace the broken or defective intercom system at north wall in the 2nd private hallway from northIssued Aug 13, 2025 · fix by Sep 17, 2025 overdue · Violation #18163253
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued Aug 13, 2025 · fix by Sep 17, 2025 overdue · Violation #18163250
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 4th room from east at northIssued Aug 13, 2025 · fix by Sep 17, 2025 overdue · Violation #18163249
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 13, 2025 · fix by Sep 17, 2025 overdue · Violation #18163248
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq. ft. at north,east,south and west walls and ceiling ceiling in the bathroomIssued Aug 13, 2025 · fix by Sep 17, 2025 overdue · Violation #18163209
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 1o sq ft at north wall in the bathroomIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17815136
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceilng in the kitchenIssued Dec 5, 2024 · fix by Jan 9, 2025 overdue · Violation #17510366
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Jun 17, 2024 · fix by Jul 22, 2024 overdue · Violation #17051721
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 17, 2024 · fix by Jul 13, 2024 overdue · Violation #17051722
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 17, 2024 · fix by Jul 13, 2024 overdue · Violation #17051723
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 29, 2024 · fix by Jun 24, 2024 overdue · Violation #17000416
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 29, 2024 · fix by Jun 24, 2024 overdue · Violation #17000417
  • B
    Other repairsProperly repair with similar material the broken or defective sloping hard wood floor in the private hallwayIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17000418
  • B
    Other repairsProperly repair with similar material the broken or defective sloping hard wood floor in the 1st room from northIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17000419
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 10, 2024 · fix by Jun 5, 2024 overdue · Violation #16968221
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 10, 2024 · fix by Jun 5, 2024 overdue · Violation #16955447
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 5 sq ft at the west wall 5 sq ft at the south wall and 5 sq ft at the ceiling…Issued Oct 27, 2022 · fix by Dec 1, 2022 overdue · Violation #15441887
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling (10 sq. ft.) in the bathroomIssued Oct 7, 2021 · fix by Nov 11, 2021 overdue · Violation #14603820
  • B
    Broken doors or locksProperly repair the broken or defective buzzer intercom system from the building entrance door to the apartment wall panel in the kitchenIssued Jul 16, 2021 · fix by Aug 20, 2021 overdue · Violation #14410040
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Feb 18, 2020 · fix by Mar 24, 2020 overdue · Violation #13534098
  • B
    Other repairsProperly repair the broken or defective bell and return buzzer systemIssued Jan 9, 2020 · fix by Feb 13, 2020 overdue · Violation #13491428

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12017
232018
112020
92021
72022
52023
172024
182025
42026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 97 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 4:16 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.