Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Tremont

4439 3 Avenue, Bronx

10457 · 133 apartments · 12 stories · City Council district 15

By · Updated · Data from NYC HPD

C
12open immediately hazardous violations · 9 per 100 apartments
B35Hazardous, open
A3Non-hazardous, open
!29Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companySTB OWNERS LLC
Landlord (head officer or owner)Herminio Torres

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Broken doors or locks
    11
  2. Electrical problems
    10
  3. Peeling paint and plaster
    8
  4. Roaches
    6
  5. Missing smoke or CO detector
    4
  6. Other repairs
    3
  7. Mold
    2
  8. Plumbing, sinks and toilets
    2
  9. Leaks and water damage
    2
  10. No heat or hot water
    1
  11. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C82 days
from 64 closed · NYC typical: 87 days
B108 days
from 71 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Broken doors or locksProperly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to panel at west wall in the foyerIssued Nov 16, 2026 · Violation #19373004
  • C
    RoachesAbate the infestation consisting of roaches at laundry roomIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19298842
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical ventilation system at the ceiling in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298839
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298841
  • C
    MoldTrace and repair the source and abate the visible mold condition observed greater than 3o square feet at the ceiling in the bathroomIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19298834
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19298846
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of observed flies in the entire apartmentIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298847
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical hvac unit at north wall in the 1st room from east at northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298848
  • B
    Other repairsProperly repair with similar material the broken or defective wood vanity cabinet at south wall in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298835
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking in between ceramic wall tiles at north wall, west wall, and south wall of bathtub in the…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298836
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and all walls in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298837
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298838
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical hvac unit at north wall in the 2nd room from eastIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298849
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical hvac unit at west wall in the 3rd room from east at northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298850
  • B
    MoldTrace and repair the source and abate the visible mold condition observed greater 20 sq ft at the ceiling in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298858
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical hvac unit at west wall in the 3rd room from northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298857
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical hvac unit at west wall in the 2nd room from northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298856
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical hvac unit at west wall in the 1st room from north at westIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298855
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood sink base cabinet at north wall in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298840
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298860
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical ventilation system at the ceiling in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298859
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298854
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298853
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298852
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19298851
  • B
    Other repairsProperly repair or replace the broken or defective at south wall in the 1st room from eastIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278159
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall at public hall, 10th storyIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278162
  • C
    Broken doors or locksProvide ready access to buildings heating system lock door at boiler roomIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19278161
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the kitchenIssued Oct 7, 2026 · fix by Oct 7, 2026 overdue · rent impairing · Violation #19278160
  • C
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable two motion electromagnetic locking device installed at vestibule door at public hall, 1st storyIssued Sep 23, 2026 · fix by Sep 29, 2026 overdue · rent impairing · Violation #19229644
  • B
    Broken doors or locksProperly repair or replace the broken or defective bell buzzer intercom system from building entrance door to the apartment wall panel at north door in the…Issued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19229642
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 7th storyIssued Sep 21, 2026 · fix by Oct 5, 2026 overdue · Violation #19229646
  • B
    Electrical problemsProvide cover at electrical outlet at west wall at public hall, 7th storyIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19229647
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19203760
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19203762
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19203761
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19203763
  • B
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the roof door at 2nd public hall bulkhead from east,…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · rent impairing · Violation #19203770
  • C
    Mice or ratsAbate the infestation consisting of mice at compactor closet, 6th storyIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19203766
  • B
    Broken doors or locksProvide in the event of power outrage by means of a unlockable slide bolt and lock or hook at the roof door at 1st public hall bulkhead from east, 12th storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19203768
  • B
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the roof door at 1st public hall bulkhead from east,…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · rent impairing · Violation #19203767
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19203764
  • B
    Broken doors or locksProvide in the event of power outrage by means of a unlockable slide bolt and lock or hook at the roof door at 2nd public hall bulkhead from east, 12th storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19203769
  • B
    Broken doors or locksProperly repair or replace the broken or defective sash lock at 2nd window from north at east in the kitchenIssued Jun 23, 2026 · fix by Jul 28, 2026 overdue · Violation #19023763
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet cover at north and south walls in the 1st room from northIssued Jun 23, 2026 · fix by Jul 28, 2026 overdue · Violation #19023762
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 3, 2024 · fix by Sep 29, 2024 overdue · Violation #17239589
  • B
    Broken doors or locksProperly repair or replace the broken or defective door in the bathroomIssued Jun 29, 2023 · fix by Aug 3, 2023 overdue · Violation #16065249

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

292019
152021
132022
322023
602024
302025
772026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 258 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.