Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Harlem (North)

329 Pleasant Avenue, Manhattan

10035 · 20 apartments · 8 stories · City Council district 8

By · Updated · Data from NYC HPD

C
6open immediately hazardous violations · 30 per 100 apartments
B10Hazardous, open
A20Non-hazardous, open
!36Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyLEHNY LLC
Landlord (head officer or owner)Michael Alexander

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    17
  2. Missing smoke or CO detector
    4
  3. Leaks and water damage
    3
  4. No heat or hot water
    3
  5. Mold
    2
  6. Peeling paint and plaster
    2
  7. Broken doors or locks
    2
  8. Bedbugs
    1
  9. Plumbing, sinks and toilets
    1
  10. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C147 days
from 1 closed · NYC typical: 87 days
BNot enough data
NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition (8 sq ft) at the north wall in the 1st room from north at westIssued Oct 6, 2022 · fix by Nov 10, 2022 overdue · Violation #15417194
  • B
    MoldTrace and repair the source and abate the visible mold condition 8 sq ft at the south wall and baseboard in the 1st room from north at westIssued Oct 6, 2022 · fix by Nov 10, 2022 overdue · Violation #15417193
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from north at westIssued Jun 8, 2022 · fix by Jul 13, 2022 overdue · Violation #15195161
  • B
    Other repairsProperly repair with similar material the broken or defective warped ceramic floor tiles in the 1st room from north at westIssued Jun 8, 2022 · fix by Jul 13, 2022 overdue · Violation #15195162
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the bottom of the south wall in the 1st room from north at westIssued Jun 8, 2022 · fix by Jul 13, 2022 overdue · Violation #15195163
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the private hallwayIssued Jun 8, 2022 · fix by Jul 13, 2022 overdue · Violation #15195166
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at shower drain in the bathroomIssued Mar 11, 2022 · fix by Apr 15, 2022 overdue · rent impairing · Violation #14999848
  • B
    Electrical problemsProperly repair the broken or defective electrical light at range hood in the kitchenIssued Mar 11, 2022 · fix by Apr 15, 2022 overdue · Violation #14999849
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 25, 2022 · fix by Feb 25, 2022 overdue · rent impairing · Violation #14886864
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 25, 2022 · fix by Feb 25, 2022 overdue · rent impairing · Violation #14886865
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellar, 1st storyIssued Feb 25, 2022 · fix by Mar 3, 2022 overdue · Violation #14886866
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 22, 2022 · fix by Feb 21, 2022 overdue · rent impairing · Violation #14837281
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Feb 22, 2022 · fix by Feb 28, 2022 overdue · Violation #14837286
  • B
    Other repairsProperly repair with similar material the broken or defective wood basebord in the foyerIssued Oct 6, 2021 · fix by Nov 10, 2021 overdue · Violation #14602289
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the foyerIssued Oct 6, 2021 · fix by Nov 10, 2021 overdue · Violation #14602288
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 6, 2021 · fix by Oct 12, 2021 overdue · Violation #14602294

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

122021
272022
12023
22024
12026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 46 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.