Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford-Stuyvesant (East)

1620 Fulton Street, Brooklyn

11213 · 103 apartments · 11 stories · City Council district 36

By · Updated · Data from NYC HPD

C
5open immediately hazardous violations · 5 per 100 apartments
B11Hazardous, open
A4Non-hazardous, open
!18Past the fix-by date

On average, NYC buildings have 19.8 open class C violations per 100 apartments. This building has fewer.

1 open violation is marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning company16 Fulton Partners LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Broken doors or locks
    7
  2. Other repairs
    5
  3. Leaks and water damage
    2
  4. Peeling paint and plaster
    2
  5. No heat or hot water
    1
  6. Electrical problems
    1
  7. Mold
    1
  8. Roaches
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C249 days
from 13 closed · NYC typical: 84 days
B107 days
from 12 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 1st room from eastIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19275776
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19275775
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood base cabinet door in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211387
  • B
    Other repairsProperly repair with similar material the broken or defective marble counter top at wood base cabinet in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211388
  • B
    Other repairsProperly repair or replace the broken or defective counter top at base cabinet at south wall in the kitchenIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19168018
  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lock at door in the bathroomIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19168017
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch in the entranceIssued Aug 27, 2026 · fix by Sep 10, 2026 overdue · Violation #19168019
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding above 130 degrees in the entire apartmentIssued Jul 17, 2026 · fix by Jul 23, 2026 overdue · Violation #19082018
  • B
    Other repairsProperly repair with similar material the broken or defective cracked marble counter top at south in the kitchenIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19054011
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at all light fixtures and electrical wall outlets in the entire apartmentIssued Jun 24, 2026 · fix by Jul 29, 2026 overdue · Violation #19026867
  • B
    Leaks and water damageProperly repair with similar material the broken or defective leaky hosecock at north in the terraceIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19014613
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at ceiling in the bathroomIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18807585
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 25, 2024 · fix by Dec 21, 2024 overdue · Violation #17431609
  • C
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the building entrance door , 1st storyIssued Jun 24, 2024 · fix by Jun 30, 2024 overdue · rent impairing · Violation #17067179
  • B
    Broken doors or locksProvide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door , 1st storyIssued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17067180
  • C
    Broken doors or locksProvide provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door , 1st storyIssued Jun 24, 2024 · fix by Jun 30, 2024 overdue · Violation #17067181

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

82021
42022
102023
202024
32025
182026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 64 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 28, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.