Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Fordham Heights

2192 Morris Avenue, Bronx

10453 · 43 apartments · 6 stories · City Council district 14

By · Updated · Data from NYC HPD

C
28open immediately hazardous violations · 65 per 100 apartments
B42Hazardous, open
A8Non-hazardous, open
!68Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Who owns and manages it

Owning companyMOSTAR REALTY LLC
Landlord (head officer or owner)Anthony Gazivoda

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Mold
    13
  2. Roaches
    12
  3. Other repairs
    12
  4. Peeling paint and plaster
    11
  5. Broken doors or locks
    9
  6. Lead paint
    7
  7. Mice or rats
    5
  8. Missing smoke or CO detector
    4
  9. Plumbing, sinks and toilets
    3
  10. Leaks and water damage
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C91 days
from 55 closed · NYC typical: 87 days
B119 days
from 86 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19360492
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19360494
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19360490
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19360493
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of plexi glass panels installed at vestibule door at public hall, 1st storyIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19360499
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch and its assembly at vestibule door at public hall, 1st storyIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19360498
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st storyIssued Nov 9, 2026 · fix by Nov 23, 2026 · Violation #19360497
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19360496
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19360495
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19360491
  • B
    Broken doors or locksProvide glass in lieu of plexi at vestibule door at public hall, 1st storyIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19360500
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall (behind stove) in the kitchenIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19049815
  • C
    MoldTrace and repair the source and abate the visible mold condition approx 8 sqft at north wall, approx 3 sqft at west wall. approx 4 sqft at ceiling in the…Issued Jul 2, 2026 · fix by Jul 28, 2026 overdue · Violation #19055368
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18876167
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor at vestibule at public hall, 1st storyIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18876175
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 30 sq ft at east wall and south wall in the bathroomIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18876166
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at north and south wall at vestibule at public hall, 1st storyIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18876173
  • C
    Broken doors or locksProperly repair or replace the broken or defective latch and its assembly at building entrance door , 1st storyIssued Mar 16, 2026 · fix by Mar 22, 2026 overdue · Violation #18716640
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 20, 2025 · fix by Mar 18, 2025 overdue · Violation #17704255
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 20, 2025 · fix by Mar 18, 2025 overdue · Violation #17704249
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 30, 2024 · fix by Feb 3, 2025 overdue · Violation #17585091
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 30, 2024 · fix by Feb 3, 2025 overdue · Violation #17585092
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 30, 2024 · fix by Feb 3, 2025 overdue · Violation #17585095
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 30, 2024 · fix by Feb 3, 2025 overdue · Violation #17585094
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 30, 2024 · fix by Feb 3, 2025 overdue · Violation #17585093
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Dec 23, 2024 · fix by Dec 27, 2024 overdue · Violation #17576464
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Dec 23, 2024 · fix by Dec 27, 2024 overdue · Violation #17576465
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall and west wall (behind stove ) in the kitchenIssued Sep 25, 2024 · fix by Oct 30, 2024 overdue · Violation #17297665
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Sep 25, 2024 · fix by Oct 30, 2024 overdue · Violation #17297668
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Sep 25, 2024 · fix by Oct 30, 2024 overdue · Violation #17297667
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued May 21, 2024 · fix by Jun 25, 2024 overdue · Violation #16983232
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued May 21, 2024 · fix by Jun 25, 2024 overdue · Violation #16983240
  • B
    Other repairsProperly repair with similar material the broken or defective rotten wood floor in the private hallwayIssued May 21, 2024 · fix by Jun 25, 2024 overdue · Violation #16983239
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued May 21, 2024 · fix by Jun 25, 2024 overdue · Violation #16983231
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Mar 11, 2024 · fix by Mar 25, 2024 overdue · Violation #16729567
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 13, 2023 · fix by Jan 8, 2024 overdue · Violation #16517246
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 4, 2023 · fix by Dec 30, 2023 overdue · Violation #16495065
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 4, 2023 · fix by Dec 30, 2023 overdue · Violation #16495078
  • B
    MoldTrace and repair the source and abate the visible mold condition 4 sq. ft at west window casing in the 1st room from north at westIssued Sep 19, 2023 · fix by Oct 24, 2023 overdue · Violation #16240915
  • B
    Other repairsProperly repair or replace the broken or defective intercom panel box from 1 st story public hall to north wall in the foyerIssued Jun 27, 2023 · fix by Aug 1, 2023 overdue · Violation #16051461
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 27, 2023 · fix by Jul 23, 2023 overdue · Violation #16051460
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 5, 2023 · fix by May 1, 2023 overdue · Violation #15904976
  • C
    MoldTrace and repair the source and abate the visible mold condition total of 58 square feet at ceiling and walls in the bathroomIssued Aug 23, 2022 · fix by Sep 18, 2022 overdue · Violation #15331414
  • C
    MoldTrace and repair the source and abate the visible mold condition approx. 30 sq. feet. at all walls and ceiling. in the bathroomIssued Aug 4, 2022 · fix by Aug 30, 2022 overdue · Violation #15299082
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 4, 2022 · fix by Aug 30, 2022 overdue · Violation #15299081
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 4, 2022 · fix by Aug 30, 2022 overdue · Violation #15299080
  • B
    MoldTrace and repair the source and abate the visible mold condition at window casing approx 3 sq ft in the bathroomIssued Jun 22, 2022 · fix by Jul 27, 2022 overdue · Violation #15225838
  • C
    MoldTrace and repair the source and abate the visible mold condition at ceiling approx 17 sq ft, at west wall approx 15 sq ft, at north wall approx 23 sq ft, at…Issued Jun 17, 2022 · fix by Jul 13, 2022 overdue · Violation #15206858
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 15, 2022 · fix by Apr 10, 2022 overdue · Violation #15002204
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 20 sq.ft at ceiling and walls in the bathroomIssued Mar 15, 2022 · fix by Apr 19, 2022 overdue · Violation #15002200
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 15, 2022 · fix by Apr 10, 2022 overdue · Violation #15002203
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from eastIssued Mar 15, 2022 · fix by Apr 19, 2022 overdue · Violation #15002199
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 22, 2022 · fix by Mar 20, 2022 overdue · Violation #14837313
  • C
    MoldTrace and repair the source and abate the visible mold condition at ceiling approx 5 sq ft, at north wall approx 23 sq ft, at west wall approx 13 sq ft, at…Issued Feb 22, 2022 · fix by Mar 20, 2022 overdue · Violation #14837309
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 22, 2022 · fix by Mar 20, 2022 overdue · Violation #14837321
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Feb 22, 2022 · fix by Mar 29, 2022 overdue · Violation #14837317
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyerIssued Nov 17, 2021 · fix by Dec 22, 2021 overdue · Violation #14685700
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 5, 2021 · fix by Aug 31, 2021 overdue · Violation #14479675
  • B
    MoldTrace and repair the source and abate the visible mold condition at window frame (apprx 5 sq ft ) in the bathroomIssued Jul 20, 2021 · fix by Aug 24, 2021 overdue · Violation #14451521
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north at eastIssued Aug 27, 2020 · fix by Oct 1, 2020 overdue · Violation #13786357

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

302017
232018
272019
492020
462021
452022
462023
532024
332025
782026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 658 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.