Housing violations · Fordham Heights
2338 Morris Avenue, Bronx
10468 · 60 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster42
- Other repairs41
- Roaches19
- Mold18
- Leaks and water damage15
- Mice or rats14
- Broken doors or locks13
- Plumbing, sinks and toilets11
- Electrical problems9
- Missing smoke or CO detector4
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 165 closed · NYC typical: 87 days
from 421 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19367844
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish glaze at bathtub in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367846
- BOther repairsReplace with new the missing eschutcheon plate at riser in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304432
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at building entrance door(sidelite) , 1st storyIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19304442
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304435
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304434
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling (inside the closet) and north wall in the private hallwayIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304441
- BBroken doors or locksProvide approved glass in the place of building entrance door(sidelite) , 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304443
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304439
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304438
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19304437
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19304436
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling (inside the closet) and north wall in the private hallwayIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304440
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19238003
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north, south and east walls in the kitchenIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19238011
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, east and west walls in the foyerIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19238012
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and east walls in the private hallwayIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19238008
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the 1st closet from west at north, ceiling and walls in the private hallwayIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19238007
- BMoldTrace and repair the source and abate the visible mold condition observed greated that 20.sq.feet at the 1st closet from west at north, ceiling and walls in…Issued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19238006
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, west, and south walls in the bathroomIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19238005
- BMoldTrace and repair the source and abate the visible mold condition observed greater that 10.sq.feet at ceiling and east wall in the bathroomIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19238004
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 24, 2026 · fix by Oct 20, 2026 overdue · Violation #19238002
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at westIssued Sep 24, 2026 · fix by Sep 30, 2026 overdue · Violation #19238001
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19236545
- BLeaks and water damageRepair the leaky and/or defective faucets faucet at bathtub in the bathroomIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19236546
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north, south, and west walls in the 3rd room from north at eastIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19238010
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at eastIssued Sep 24, 2026 · fix by Sep 30, 2026 overdue · Violation #19238009
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at southIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19236542
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the 1st room from east at southIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19236539
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the foyerIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19236548
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 23, 2026 · fix by Oct 19, 2026 overdue · Violation #19236544
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 23, 2026 · fix by Oct 19, 2026 overdue · Violation #19236543
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19236547
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19236540
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at southIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19236541
- CMoldTrace and repair the source and abate the visible mold condition more than 30 square feet of mold at ceiling, east, north, and west walls in the bathroomIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19230231
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19230233
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19230244
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wooden subfloors, sinking in the kitchenIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19185001
- BOther repairsProperly repair or replace the broken or defective ceiling light fixture in the kitchenIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19185005
- BOther repairsProperly repair with similar material the broken or defective cracked vinyl tiles at floor in the kitchenIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19185002
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19185003
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink at north wall in the kitchenIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19185004
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from northIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185011
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 3, 2026 · fix by Sep 29, 2026 overdue · Violation #19185006
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 3, 2026 · fix by Sep 29, 2026 overdue · Violation #19185007
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185012
- BPlumbing, sinks and toiletsProvide vanity at washbasin in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185015
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from northIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185008
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the 1st room from northIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185009
- BOther repairsProperly repair with similar material the broken or defective cracked cermaic tiles at floor in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185014
- BOther repairsProperly repair with similar material the broken or defective wooden subfloors in the 1st room from northIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185010
- BOther repairsProperly repair or replace the broken or defective light switch at south wall in the 2nd room from northIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19185013
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 28, 2026 · fix by Sep 23, 2026 overdue · Violation #19167508
- BMoldTrace and repair the source and abate the visible mold condition less than 30sqft at south wall and east wall in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19093685
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq.ft at ceiling, west and south walls in the bathroomIssued Jun 29, 2026 · fix by Jul 25, 2026 overdue · Violation #19037584
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq.ft at ceiling in the bathroomIssued Jun 24, 2026 · fix by Jul 20, 2026 overdue · Violation #19024750
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft. at west and south walls in the bathroomIssued Jun 24, 2026 · fix by Jul 29, 2026 overdue · Violation #19024760
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq. ft. at west wall in the bathroomIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19015030
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq. ft. at ceiling, east wall, south wall, 1st closet from south at west wall…Issued Jun 22, 2026 · fix by Jul 18, 2026 overdue · Violation #19015023
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.