Housing violations · University Heights (North)-Fordham
2489 Morris Avenue, Bronx
10468 · 43 apartments · 5 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
12 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs38
- Peeling paint and plaster26
- Lead paint24
- Leaks and water damage17
- Broken doors or locks16
- Plumbing, sinks and toilets10
- Missing smoke or CO detector10
- Mold7
- Mice or rats5
- Roaches5
- Electrical problems2
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 44 closed · NYC typical: 87 days
from 67 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchenIssued Nov 16, 2026 · Violation #19374766
- COther repairsRemove all obstructions from water closet the wasteline at watercloset in the bathroomIssued Nov 16, 2026 · rent impairing · Violation #19374767
- BOther repairsAbate the nuisance consisting of pests. evidence of waterbugs in the entire apartmentIssued Nov 16, 2026 · Violation #19374765
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 16, 2026 · Violation #19374763
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Nov 16, 2026 · Violation #19374764
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain finish reglaze at bathtub in the bathroomIssued Nov 16, 2026 · Violation #19374769
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Nov 16, 2026 · rent impairing · Violation #19374768
- BBroken doors or locksProvide glass in lieu of plexi glass at building entrance door at basementIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369877
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plexi glass installed at building entrance door at basementIssued Nov 13, 2026 · fix by Nov 19, 2026 · Violation #19369875
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19315874
- BOther repairsProperly repair or replace the broken or defective marble nosing at basement at public hall stairs, section ''fg''Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19315873
- COther repairsProperly repair or replace the broken or defective wired glass at lower sash window, intermediate landing at public hall, 1st story, section ''hjk''Issued Oct 28, 2026 · fix by Nov 3, 2026 overdue · Violation #19315876
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19323052
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story, section ''hjk''Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19315878
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling at public hall, 5th story, section ''hjk''Issued Oct 28, 2026 · fix by Dec 2, 2026 · rent impairing · Violation #19315877
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321413
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321414
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19323054
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Oct 22, 2026 · fix by Nov 26, 2026 · rent impairing · Violation #19323056
- BBroken doors or locksRefit closet door in the 1st room from east at northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296861
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296863
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from east at centerIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296859
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east at northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296856
- COther repairsProperly repair with similar material the broken or defective buckeling wood floor in the 2nd room from east at northIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19296858
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at northIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19296857
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296860
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 15, 2026 · fix by Oct 29, 2026 overdue · Violation #19296864
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 1st room from northIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19263438
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinge at door in the entranceIssued Oct 2, 2026 · fix by Oct 16, 2026 overdue · Violation #19263437
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from northIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19263440
- BOther repairsRemove all encumbrances consisting of construction material at basement at public hall, section ''de''Issued Aug 19, 2026 · fix by Sep 23, 2026 overdue · rent impairing · Violation #19152044
- BOther repairsProperly repair with similar material the broken or defective ceiling at building entrance , 1st story, section ''fg''Issued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19090058
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the at west yard , 1st storyIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19090062
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jul 27, 2026 · fix by Aug 22, 2026 overdue · rent impairing · Violation #19090061
- BOther repairsProperly repair with similar material the broken or defective at north and west wall at intermediate landing at public hall stairs, 1st story, section ''fg''Issued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19090060
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 22, 2026 · fix by Aug 17, 2026 overdue · Violation #19096008
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the kitchenIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19096011
- BOther repairsAbate the nuisance consisting of pests. evidence of waterbugs in the entire apartmentIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19096009
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 22, 2026 · fix by Aug 17, 2026 overdue · Violation #19096007
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19096013
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19096026
- BOther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods drop ladder fully descendant at 1st fire escape west at south…Issued Jun 25, 2026 · fix by Jul 30, 2026 overdue · rent impairing · Violation #19027728
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of plixe glass at upper panel at building entrance door at public hall, 1st story, section ''fg''Issued Jun 25, 2026 · fix by Jul 30, 2026 overdue · Violation #19027737
- BBroken doors or locksProvide glass pane at upper panel at building entrance door at public hall, 1st story, section ''fg''Issued Jun 25, 2026 · fix by Jul 30, 2026 overdue · Violation #19027738
- BBroken doors or locksProvide glass pane at lower panel at building entrance door at public hall, 1st story, section ''fg''Issued Jun 25, 2026 · fix by Jul 30, 2026 overdue · Violation #19027746
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 18, 2026 · fix by Jun 13, 2026 overdue · Violation #18926833
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the 1st room from east at northIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18926831
- BOther repairsProperly repair with similar material the broken or defective hard wood floor ( walking area) in the 3rd room from north at westIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18926830
- BOther repairsProperly repair with similar material the broken or defective concrete , ceramic floor tiles ( near steam riser) in the bathroomIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18926812
- BPlumbing, sinks and toiletsRepair the broken or defective connection in wasteline under washbasin in the bathroomIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18926813
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18926822
- BPlumbing, sinks and toiletsRepair the broken or defective connection wasteline under sink in the kitchenIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18926814
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from north at westIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18926816
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket at top and bottom doors of refrigerator in the kitchenIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18926817
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in in wasteline under bathtub in the bathroomIssued May 18, 2026 · fix by Jun 22, 2026 overdue · rent impairing · Violation #18926811
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18926821
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at westIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18926828
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north at westIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18926829
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 18, 2026 · fix by Jun 13, 2026 overdue · Violation #18926834
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electric wiring on south wall in the private hallwayIssued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18926827
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.