Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Mariner's Harbor-Arlington-Graniteville

85 Brabant Street, Staten Island

10303 · 2 apartments · 2 stories · City Council district 49

By · Updated · Data from NYC HPD

C
1open immediately hazardous violations · 50 per 100 apartments
B19Hazardous, open
A13Non-hazardous, open
!18Past the fix-by date

Open in Google Maps ↗

Who owns and manages it

Owning companyHARBOR COURT APTS II LLC
Landlord (head officer or owner)Martin Kirzner

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Broken doors or locks
    11
  2. Other repairs
    5
  3. Roaches
    4
  4. Plumbing, sinks and toilets
    4
  5. Electrical problems
    2
  6. Mold
    2
  7. Peeling paint and plaster
    2
  8. Lead paint
    1
  9. Mice or rats
    1
  10. Leaks and water damage
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C22 days
from 1 closed · NYC typical: 87 days
B115 days
from 18 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355363
  • B
    Broken doors or locksRefit balcony door at south wall in the 1st room from eastIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355362
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection waste line under sink in the kitchenIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355364
  • B
    Broken doors or locksProperly repair or replace the broken or defective wall cabinet doors at north wall in the kitchenIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355365
  • B
    Broken doors or locksProperly secure the loose sliding doors on closet at east wall in the 1st room from east at southIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19300223
  • B
    Other repairsProperly repair with similar material the broken or defective caulking around countertop at north wall in the kitchenetteIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19300230
  • B
    Lead paintReplace with new the missing handles with latch on door leading to balcony at south wall in the 1st room from east at southIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19300229
  • B
    Broken doors or locksProperly secure the loose sliding doors on closet at north wall in the 3rd room from east at southIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19300228
  • B
    Broken doors or locksProperly secure the loose sliding doors on closet at north wall in the 2nd room from east at southIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19300227
  • B
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19300226
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures ceiling at laundry room in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19300224
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel reglaze at bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19300231
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sqft at north wall in the 1st room from northIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19141183
  • B
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18781115
  • B
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18781116
  • B
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18524143
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18524144
  • C
    MoldTrace and repair the source and abate the visible mold condition approximately 30 sq ft at floor under sink in the kitchenIssued May 13, 2024 · fix by Jun 8, 2024 overdue · Violation #16965466
  • B
    Plumbing, sinks and toiletsProperly secure the loose washbasin at east wall in the bathroomIssued Feb 7, 2023 · fix by Mar 14, 2023 overdue · Violation #15706331
  • B
    Other repairsProperly secure the loose upper wood cabinet at north wall in the kitchenIssued Feb 7, 2023 · fix by Mar 14, 2023 overdue · Violation #15706327

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12017
82020
92023
222024
92025
212026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 71 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.