Housing violations · Bedford Park
2784 Morris Avenue, Bronx
10468 · 44 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint18
- Peeling paint and plaster17
- Other repairs14
- Broken doors or locks8
- Leaks and water damage7
- Roaches7
- Mice or rats5
- No heat or hot water2
- Missing smoke or CO detector2
- Missing window guards1
- Plumbing, sinks and toilets1
- Mold1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 102 closed · NYC typical: 87 days
from 131 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 30, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19335808
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 30, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19335810
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19335809
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 6th storyIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278641
- BLeaks and water damageRepair the roof so that it will not leak over ceiling at public hall, 6th storyIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19278640
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at southIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19231819
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 3rd room from east at northIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · rent impairing · Violation #19231816
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at northIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19231817
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 3rd room from east at southIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · rent impairing · Violation #19231818
- BBroken doors or locksProperly repair or replace the broken or defective latch and its assembly at roof door at 1st public hall bulkhead from north, 6th storyIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19150352
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at roof door at 1st public hall bulkhead from north, 6th storyIssued Aug 21, 2026 · fix by Sep 4, 2026 overdue · Violation #19150351
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Aug 18, 2026 · fix by Aug 22, 2026 overdue · Violation #19151606
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Aug 18, 2026 · fix by Aug 22, 2026 overdue · Violation #19151607
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 29, 2026 · fix by Jul 25, 2026 overdue · Violation #19036866
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 29, 2026 · fix by Jul 25, 2026 overdue · Violation #19036865
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jun 26, 2026 · fix by Jul 22, 2026 overdue · Violation #19035200
- BOther repairs& 309 m/d law abate the nuisance consisting of air condition unit installed at fire escape window impeeding secondary egress. in the 1st room from northIssued Jun 26, 2026 · fix by Jul 31, 2026 overdue · Violation #19035208
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 1, 2026 · fix by Jun 27, 2026 overdue · Violation #18964616
- BOther repairsRefit upper window sash, 2nd from east at south wall in the kitchenIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18964615
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 27, 2026 · fix by May 23, 2026 overdue · Violation #18811835
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 27, 2026 · fix by May 23, 2026 overdue · Violation #18811834
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 13, 2026 · fix by May 18, 2026 overdue · Violation #18785019
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east at southIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18756739
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the kitchenIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18756760
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 1st room from eastIssued Apr 2, 2026 · fix by May 7, 2026 overdue · rent impairing · Violation #18756761
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Apr 2, 2026 · fix by Apr 16, 2026 overdue · Violation #18756750
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18756757
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18756758
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from eastIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18756763
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at northIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18756737
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the 3rd room from east at northIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18756738
- BOther repairsProperly repair or replace the broken or defective latch set in the entranceIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18746362
- BOther repairsProperly repair or replace the broken or defective latch set in the entranceIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18746500
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Mar 27, 2026 · fix by Apr 10, 2026 overdue · Violation #18746310
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 12, 2026 · fix by Feb 7, 2026 overdue · Violation #18561846
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd bathroom from eastIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18203421
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 2nd bathroom from eastIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18203422
- COther repairsProperly repair with similar material the broken or defective ceramic floor tile in the 2nd bathroom from eastIssued Jun 16, 2025 · fix by Jun 22, 2025 overdue · Violation #18034752
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18034762
- BBroken doors or locksReplace with new the missing entrance door in the 2nd room from northIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18034753
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from northIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18034754
- BOther repairsProperly repair or replace the broken or defective upper sash counter balance at window in the kitchenIssued Jan 31, 2025 · fix by Mar 7, 2025 overdue · Violation #17660231
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wash basin wasteline in the bathroomIssued Jan 31, 2025 · fix by Mar 7, 2025 overdue · rent impairing · Violation #17660232
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft on ceiling, east, north, and west walls in the kitchenIssued Nov 29, 2024 · fix by Jan 3, 2025 overdue · Violation #17454733
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jul 24, 2024 · fix by Aug 17, 2024 overdue · Violation #17141634
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the bathroomIssued Jul 23, 2024 · fix by Aug 27, 2024 overdue · Violation #17135240
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued May 21, 2024 · fix by Jun 4, 2024 overdue · Violation #16983557
- BOther repairsProperly repair with similar material the broken or defective warpped wood floor in the foyerIssued Feb 8, 2024 · fix by Mar 14, 2024 overdue · Violation #16643872
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash in the kitchenIssued Jan 23, 2024 · fix by Feb 27, 2024 overdue · Violation #16614254
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 14, 2023 · fix by Apr 18, 2023 overdue · Violation #15772460
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 14, 2023 · fix by Apr 18, 2023 overdue · Violation #15772458
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 14, 2023 · fix by Apr 18, 2023 overdue · Violation #15772461
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Mar 9, 2023 · fix by Mar 13, 2023 overdue · Violation #15769761
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Mar 9, 2023 · fix by Mar 13, 2023 overdue · Violation #15769760
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 4th room from eastIssued Feb 26, 2021 · fix by Apr 2, 2021 overdue · Violation #14041727
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Sep 29, 2020 · fix by Oct 3, 2020 overdue · Violation #13827539
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Sep 4, 2020 · fix by Sep 8, 2020 overdue · Violation #13797584
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Sep 4, 2020 · fix by Sep 8, 2020 overdue · Violation #13797586
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Sep 4, 2020 · fix by Sep 8, 2020 overdue · Violation #13797582
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Sep 4, 2020 · fix by Sep 8, 2020 overdue · Violation #13797585
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.