Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford Park

2819 Morris Avenue, Bronx

10468 · 69 apartments · 6 stories · City Council district 14

By · Updated · Data from NYC HPD

C
19open immediately hazardous violations · 28 per 100 apartments
B33Hazardous, open
A3Non-hazardous, open
!55Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyMORRIS REALTY LLC
Landlord (head officer or owner)Aaron Bauer

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    14
  2. Mice or rats
    8
  3. Roaches
    7
  4. Mold
    6
  5. Electrical problems
    5
  6. Broken doors or locks
    4
  7. Lead paint
    3
  8. Missing window guards
    2
  9. Peeling paint and plaster
    2
  10. Plumbing, sinks and toilets
    2
  11. Missing smoke or CO detector
    1
  12. Leaks and water damage
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C83 days
from 17 closed · NYC typical: 87 days
B94 days
from 94 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on baclony at 1st fire escape from east at south, 2nd…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19232542
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on balcony at 1st fire escape from east at south, 4th…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19232543
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19232541
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on balcony at 1st fire escape from north, 2nd storyIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19232544
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jan 20, 2026 · fix by Feb 15, 2026 overdue · Violation #18581089
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at north wall and west wall in the bathroomIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18581086
  • B
    Electrical problemsReplace with new the missing electrical light fixture at ceiling in the 5th room from eastIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368973
  • B
    Other repairsProperly repair or replace the broken or defective spring balances at lower sash window in the 1st room from east at northIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368967
  • B
    Other repairsProperly repair or replace the broken or defective inoperative intercom system from building entrance to north wall in the foyerIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368988
  • B
    Other repairsProperly repair or replace the broken or defective spring balaces at lower window sash in the kitchenIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368986
  • B
    Other repairsProperly repair or replace the broken or defective wood trim around window in the 3rd room from eastIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368985
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of hanging at west wal in the 1st room from east at northIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368969
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of hanging at eas t wall in the 5th room from eastIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368974
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 5th room from eastIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368975
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of bx cable hanging at east and south wall in the private hallwayIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368977
  • B
    Other repairsProperly repair or replace the broken or defective window frame trims around window 2 units at east wall in the 1st room from east at southIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368959
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at east and west wall in the bathroomIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368980
  • B
    Plumbing, sinks and toiletsRepair by closing so as to be gas tight all openings in the drain pipe stack at west wall in the bathroomIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · rent impairing · Violation #18368981
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of bx cable hanging at south wall in the 3rd room from eastIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368984
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 27, 2025 · fix by Sep 22, 2025 overdue · Violation #18189029
  • B
    Peeling paint and plaster& 309 m/d law abate the nuisance consisting of latex paint on ceramic tiles at all walls in the bathroomIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18189020
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing the bathtub in the bathroomIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18189018
  • B
    Other repairsProperly repair or replace the broken or defective rubber gasket at refridgerator in the kitchenIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #16539210
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east at northIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #15251640
  • C
    Broken doors or locksProperly repair or replace the broken or defective mortise lock at building entrance at public hall, 1st storyIssued Aug 20, 2025 · fix by Aug 26, 2025 overdue · Violation #16108179
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #11897378
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at showerbody valve in the bathroomIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #11897031
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Aug 20, 2025 · fix by Aug 26, 2025 overdue · Violation #11181032
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door at public hall, 1st storyIssued Aug 20, 2025 · fix by Aug 26, 2025 overdue · Violation #16140942
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 14, 2024 · fix by Jul 10, 2024 overdue · Violation #17044901
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 14, 2024 · fix by Jul 10, 2024 overdue · Violation #17044902
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 3, 2024 · fix by Apr 29, 2024 overdue · Violation #16787542
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 8, 2024 · fix by Feb 3, 2024 overdue · Violation #16571162
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 29, 2023 · fix by Jan 24, 2024 overdue · Violation #16550863
  • C
    MoldTrace and repair the source and abate the visible mold condition approx 7 sq ft at north wall approx 12 sq ft at ceiling approx 5 sq ft at south wall approx 7…Issued Dec 26, 2023 · fix by Jan 21, 2024 overdue · Violation #16538804
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 18, 2023 · fix by Oct 14, 2023 overdue · Violation #16233824
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 7, 2023 · fix by Sep 2, 2023 overdue · Violation #16140937
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2023 · fix by Sep 2, 2023 overdue · Violation #16140936
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 7 sq ft at west wall and 7 sq ft at south wall in the bathroomIssued Jul 14, 2022 · fix by Aug 18, 2022 overdue · Violation #15256755
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 4, 2021 · fix by Oct 30, 2021 overdue · Violation #14593166
  • B
    MoldTrace and repair the source and abate the visible mold condition the north wall ( 16 sq ft ) in the bathroomIssued Apr 15, 2019 · fix by May 20, 2019 overdue · Violation #13008098
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 12 sq ft at ceiling, east wall in the bathroomIssued Feb 25, 2019 · fix by Apr 1, 2019 overdue · Violation #12921033
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Apr 9, 2018 · fix by May 14, 2018 overdue · Violation #12326273
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Jul 28, 2017 · fix by Sep 1, 2017 overdue · Violation #11897380
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold at west wall in the bathroomIssued Jul 28, 2017 · fix by Sep 1, 2017 overdue · Violation #11896959
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Jul 28, 2017 · fix by Sep 1, 2017 overdue · Violation #11897379
  • C
    MoldTrace and repair the source and abate the nuisance consisting of mold at ceiling and est wall in the bathroomIssued Jun 30, 2015 · fix by Jul 8, 2015 overdue · Violation #10763400
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 29, 2015 · fix by Jun 26, 2015 overdue · Violation #10728545
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 28, 2015 · fix by Jun 25, 2015 overdue · Violation #10728213
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 6, 2012 · fix by Oct 2, 2012 overdue · Violation #9562553
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Jan 27, 2010 · fix by Mar 3, 2010 overdue · Violation #8250814
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Jan 27, 2010 · fix by Mar 3, 2010 overdue · Violation #8250815

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

492017
142018
642019
82020
152021
82022
712023
442024
622025
182026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 690 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.