Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Soundview-Bruckner-Bronx River

1121 Morrison Avenue, Bronx

10472 · 62 apartments · 6 stories · City Council district 18

By · Updated · Data from NYC HPD

C
36open immediately hazardous violations · 58 per 100 apartments
B79Hazardous, open
A17Non-hazardous, open
!120Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyMOLIM MANAGEMENT LLC
Landlord (head officer or owner)Anthony Gazivoda

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    32
  2. Lead paint
    17
  3. Broken doors or locks
    16
  4. Peeling paint and plaster
    15
  5. Missing smoke or CO detector
    11
  6. Mice or rats
    9
  7. Leaks and water damage
    8
  8. Mold
    7
  9. Roaches
    6
  10. Electrical problems
    3
  11. Missing window guards
    3
  12. No heat or hot water
    2
  13. Plumbing, sinks and toilets
    2
  14. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C86 days
from 82 closed · NYC typical: 87 days
B112 days
from 91 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at eastIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355351
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water in excess of 130 degrees, found 145 degrees at all hot water fausets at kitchen and batroom…Issued Nov 6, 2026 · fix by Nov 12, 2026 overdue · Violation #19355354
  • C
    Leaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Nov 6, 2026 · fix by Nov 12, 2026 overdue · Violation #19355357
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355358
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355359
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 6, 2026 · fix by Dec 2, 2026 · Violation #19355360
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the entire apartmentIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19293397
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes a/c protruding more than 6 inches from window at 2nd stack in…Issued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281196
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes garbage bags at 2nd story balcony at 1st stack from north at east…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270559
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditionig unit at window at 3rd story balcony at 1st stack…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270560
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective arm hinge at door court to at public hall, 1st storyIssued Sep 14, 2026 · fix by Sep 28, 2026 overdue · Violation #19211660
  • B
    Other repairsProperly repair with similar material the broken or defective wooden subfloors in the 3rd room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211658
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211655
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19211656
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color around window frame and east wall in the 1st room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211659
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the foyerIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211657
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building entrance doorIssued Aug 18, 2026 · fix by Sep 1, 2026 overdue · Violation #19139293
  • B
    Broken doors or locksProvide lower glass pane at building entrnance door at public hall, 1st storyIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18939702
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued May 18, 2026 · fix by Jun 13, 2026 overdue · rent impairing · Violation #18939695
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set and assemblies at building entrance door (from courtyard to public hall) at 2nd storyIssued Apr 16, 2026 · fix by May 21, 2026 overdue · Violation #18793647
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at the ceiling and south wall at bulkhead at public hall, section ''west''Issued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18740234
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materail at ceiling and all walls at bulkhead , section ''east''Issued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18740253
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at southIssued Dec 22, 2025 · fix by Jan 26, 2026 overdue · Violation #18516513
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18289952
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Aug 27, 2025 · fix by Sep 20, 2025 overdue · Violation #18193366
  • B
    Other repairsProperly repair or replace the broken or defective buzzer/intercom from building entrance to the south wall in the foyerIssued Aug 26, 2025 · fix by Sep 30, 2025 overdue · Violation #18176451
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 5th storyIssued Aug 15, 2025 · fix by Sep 19, 2025 overdue · Violation #18155674
  • C
    Broken doors or locksRemove device preventing door from being self-closing door sweep in the entranceIssued Nov 27, 2024 · fix by Dec 11, 2024 overdue · Violation #17453164
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling greater than 10 sq ft in the bathroomIssued Nov 7, 2024 · fix by Dec 12, 2024 overdue · Violation #17398291
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 7, 2024 · fix by Nov 13, 2024 overdue · Violation #17398296
  • B
    MoldTrace and repair the source and abate the visible mold condition at south wall less than 10 sq ft in the bathroomIssued Nov 7, 2024 · fix by Dec 12, 2024 overdue · Violation #17398292
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective spring hinges at door in the entranceIssued Aug 5, 2024 · fix by Aug 19, 2024 overdue · Violation #17162939
  • C
    Mice or ratsAbate the infestation consisting of rodents , rats at building frontIssued May 23, 2024 · fix by Jun 18, 2024 overdue · rent impairing · Violation #16990574
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wood wall cabinet doors at east wall. in the kitchenIssued May 13, 2024 · fix by Jun 17, 2024 overdue · Violation #16970724
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). replace in the entire apartmentIssued May 13, 2024 · fix by Jun 17, 2024 overdue · Violation #16970725
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). replace in the entire apartmentIssued May 13, 2024 · fix by Jun 17, 2024 overdue · Violation #16970727
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 13, 2024 · fix by Jun 8, 2024 overdue · Violation #16970728
  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lock at west wall door. in the entranceIssued May 13, 2024 · fix by Jun 17, 2024 overdue · Violation #16970708
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued May 13, 2024 · fix by Jun 17, 2024 overdue · Violation #16970704
  • B
    Other repairsProperly repair with similar material the broken or defective rotted wood underneath the radiator at east wall in the 1st room from east at northIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16821835
  • B
    Other repairsProperly repair with similar material the broken or defective eroded brick and mortar joints near 1st window from south at north section at east exterior wall…Issued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16820793
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 8, 2024 · fix by May 4, 2024 overdue · Violation #16820776
  • B
    Other repairsProperly repair with similar material the broken or defective eroded bricks and mortar joints above 5th story window at east exterior wall at building frontIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16820789
  • B
    Other repairsProvide escutchion plate at riser at east wall in the bathroomIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16821838
  • B
    Other repairsProperly repair with similar material the broken or defective rotted wood floor panel near north wall in the foyerIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16821839
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at southIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16821836
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the 3rd room from northIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16821831
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 3rd room from northIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16821832
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at bathtub in the bathroomIssued Apr 8, 2024 · fix by May 13, 2024 overdue · rent impairing · Violation #16821833
  • B
    Other repairsRepair the broken or defective connection at radiator supply valve at east wall in the 1st room from east at northIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16821834
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Mar 5, 2024 · fix by Mar 31, 2024 overdue · Violation #16711607
  • B
    Other repairsProperly repair with similar material the broken or defective vertical cracked at mortal joints at parapell wall at building front [ south section ]Issued Feb 20, 2024 · fix by Mar 26, 2024 overdue · Violation #16691577
  • B
    Other repairsProperly secure the loose loose top rail between 1st and second story at public hall stairsIssued Feb 7, 2024 · fix by Mar 13, 2024 overdue · Violation #16653795
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 9, 2024 · fix by Feb 13, 2024 overdue · Violation #16575323
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 9, 2024 · fix by Feb 13, 2024 overdue · Violation #16575322
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 9, 2024 · fix by Feb 13, 2024 overdue · Violation #16575321
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 9, 2024 · fix by Feb 13, 2024 overdue · Violation #16575329
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 9, 2024 · fix by Feb 13, 2024 overdue · Violation #16575328
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 9, 2024 · fix by Feb 13, 2024 overdue · Violation #16575320
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Dec 26, 2023 · fix by Dec 30, 2023 overdue · Violation #16545641

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

732017
1202018
202019
402020
292021
212022
512023
1132024
562025
602026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 877 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.