Housing violations · Soundview-Bruckner-Bronx River
1250 Morrison Avenue, Bronx
10472 · 29 apartments · 4 stories · City Council district 17
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs33
- Peeling paint and plaster14
- Leaks and water damage10
- Plumbing, sinks and toilets6
- Missing smoke or CO detector4
- Mice or rats3
- Mold3
- Lead paint2
- Broken doors or locks2
- Roaches2
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 36 closed · NYC typical: 87 days
from 45 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 1, 2025 · fix by Apr 27, 2025 overdue · Violation #17786897
- BPlumbing, sinks and toiletsReplace the broken or defective wash basin sink in the bathroomIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · rent impairing · Violation #17723805
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723817
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723809
- BOther repairs& 309 m/d law abate the nuisance consisting of lifting, missing and cracked vinyl floor tiles in the kitchenIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723818
- BOther repairs& 309 m/d law abate the nuisance consisting of lifting, missing and cracked vinyl floor tiles in the 2nd room from eastIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723814
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723813
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from eastIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723806
- BOther repairs& 309 m/d law abate the nuisance consisting of lifting, missing and cracked vinyl floor tiles in the 3rd room from northIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723810
- BOther repairsProperly repair or replace the broken or defective cracked upper sash at 2nd window from north at east in the 5th room from eastIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723807
- BOther repairs& 309 m/d law abate the nuisance consisting of lifting, missing and cracked vinyl floor tiles in the 5th room from eastIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723808
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723811
- BOther repairs& 309 m/d law abate the nuisance consisting of lifting, missing and cracked vinyl floor tiles in the private hallwayIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723812
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723803
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17723804
- COther repairs& 309 m/d law abate the nuisance consisting of lifting and torn vinyl floor tiles ( trip hazard) in the 4th room from eastIssued Jan 29, 2025 · fix by Feb 4, 2025 overdue · Violation #17657242
- BMissing smoke or CO detectorRepair or replace the smoke detector defective device in the entire apartmentIssued Jan 29, 2025 · fix by Mar 5, 2025 overdue · Violation #17657250
- BLeaks and water damageRepair the leaky and/or defective faucets mixing valve at bathtub in the bathroomIssued Jan 29, 2025 · fix by Mar 5, 2025 overdue · Violation #17657235
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from eastIssued Jan 29, 2025 · fix by Mar 5, 2025 overdue · Violation #17657238
- BOther repairs& 309 m/d law abate the nuisance consisting of lifting vinyl floor tiles ( walk area ) in the private hallwayIssued Jan 29, 2025 · fix by Mar 5, 2025 overdue · Violation #17657243
- COther repairs& 309 m/d law abate the nuisance consisting of lifting/torn and cracked vinyl floor tiles ( trip hazard) in the 2nd room from eastIssued Jan 29, 2025 · fix by Feb 4, 2025 overdue · Violation #17657244
- BOther repairs& 309 m/d law abate the nuisance consisting of lifting and cracked vinyl floor tiles ( walk area ) in the foyerIssued Jan 29, 2025 · fix by Mar 5, 2025 overdue · Violation #17657245
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective erored wood wash basin cabinet in the bathroomIssued Jan 29, 2025 · fix by Mar 5, 2025 overdue · Violation #17657237
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Jan 29, 2025 · fix by Mar 5, 2025 overdue · Violation #17657236
- COther repairsProperly repair or replace the broken or defective cracked upper sash window glass panel at 2nd window from south ( cut hazard) in the 5th room from eastIssued Jan 29, 2025 · fix by Feb 4, 2025 overdue · Violation #17657241
- COther repairs& 309 m/d law abate the nuisance consisting of cracked and lifting vinyl floor tiles ( trip hazard) in the 5th room from eastIssued Jan 29, 2025 · fix by Feb 4, 2025 overdue · Violation #17657240
- COther repairsProperly repair with similar material the broken or defective lifting and cracked wood floor ( trip hazard) in the kitchenIssued Jan 29, 2025 · fix by Feb 4, 2025 overdue · Violation #17657246
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective cracked and erored wood sink base cabinet in the kitchenIssued Jan 29, 2025 · fix by Mar 5, 2025 overdue · Violation #17657247
- BLeaks and water damageRepair the roof so that it will not leak above the ceiling in the 5th room from eastIssued Jan 29, 2025 · fix by Mar 5, 2025 overdue · rent impairing · Violation #17657239
- BOther repairsProperly repair with similar material the broken or defective cracked and missing ceramic floor tiles in the bathroomIssued Apr 5, 2024 · fix by May 10, 2024 overdue · Violation #16795368
- BMoldTrace and repair the source and abate the visible mold condition at east wall appr. 2 sq ft in the bathroomIssued Aug 10, 2021 · fix by Sep 14, 2021 overdue · Violation #14488291
- BMoldTrace and repair the source and abate the visible mold condition approx 4 sq ft at north and east wall in the bathroomIssued Aug 3, 2021 · fix by Sep 7, 2021 overdue · Violation #14479126
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 24, 2021 · fix by Jul 29, 2021 overdue · Violation #14401148
- BOther repairsProperly repair the broken or defective spring balance at upper sash window in the bathroomIssued Jun 24, 2021 · fix by Jul 29, 2021 overdue · Violation #14401144
- BLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 4th room from east at southIssued Jun 24, 2021 · fix by Jul 29, 2021 overdue · Violation #14401146
- BOther repairsFire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the 4th room from east at southIssued Jun 24, 2021 · fix by Jul 29, 2021 overdue · Violation #14401147
- BElectrical problemsProperly repair the broken or defective electrical light fixture at ceiling in the 2nd room from eastIssued Jun 24, 2021 · fix by Jul 29, 2021 overdue · Violation #14401143
- BOther repairsProperly repair the broken or defective spring balance at lower sash window, the 2nd window from south at west in the 4th room from east at northIssued Jun 24, 2021 · fix by Jul 29, 2021 overdue · Violation #14401145
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Apr 12, 2021 · fix by May 17, 2021 overdue · Violation #14202581
- BOther repairsProperly repair the broken or defective wood base cabinet in the kitchenIssued Apr 12, 2021 · fix by May 17, 2021 overdue · Violation #14202590
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at all walls in the bathroomIssued Apr 12, 2021 · fix by May 17, 2021 overdue · Violation #14202580
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from east at northIssued Apr 12, 2021 · fix by May 17, 2021 overdue · Violation #14202572
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 12, 2021 · fix by May 8, 2021 overdue · Violation #14202577
- BMissing smoke or CO detectorRepair or replace the smoke detector defectiveIssued Apr 12, 2021 · fix by May 17, 2021 overdue · Violation #14202591
- BOther repairsProperly repair with similar material the broken or defective hard wood floor in the foyerIssued Apr 12, 2021 · fix by May 17, 2021 overdue · Violation #14202568
- BOther repairsProperly repair with similar material the broken or defective hardwood wood floor in the 4th room from east at northIssued Apr 12, 2021 · fix by May 17, 2021 overdue · Violation #14202569
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 12, 2021 · fix by May 8, 2021 overdue · Violation #14202578
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Apr 12, 2021 · fix by May 17, 2021 overdue · Violation #14202564
- BPlumbing, sinks and toiletsReplace with new the broken or defective wood wash basin base cabinet in the bathroomIssued Apr 12, 2021 · fix by May 17, 2021 overdue · Violation #14202586
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 12, 2021 · fix by May 17, 2021 overdue · Violation #14202584
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroomIssued Apr 12, 2021 · fix by May 17, 2021 overdue · Violation #14202583
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the foyerIssued Apr 5, 2021 · fix by May 10, 2021 overdue · rent impairing · Violation #14134307
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 3rd room from eastIssued Apr 5, 2021 · fix by May 10, 2021 overdue · rent impairing · Violation #14134304
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the kitchenIssued Apr 5, 2021 · fix by May 10, 2021 overdue · Violation #14134299
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the foyerIssued Apr 5, 2021 · fix by May 10, 2021 overdue · Violation #14134306
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Apr 5, 2021 · fix by May 10, 2021 overdue · Violation #14134305
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the 3rd room from eastIssued Apr 5, 2021 · fix by May 10, 2021 overdue · Violation #14134303
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Sep 11, 2020 · fix by Oct 16, 2020 overdue · Violation #13806470
- BLeaks and water damageRepair the roof so that it will not leak thru the ceiling in the bathroomIssued Sep 11, 2020 · fix by Oct 16, 2020 overdue · rent impairing · Violation #13806468
- BLead paint& 309 m/d law abate the nuisance consisting of key operated locking device installed on entrance door leading to the fire escape window exit in the 4th room…Issued Sep 11, 2020 · fix by Oct 16, 2020 overdue · Violation #13806474
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.