Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Manhattanville-West Harlem

110 Convent Avenue, Manhattan

10027 · 30 apartments · 5 stories · City Council district 7

By · Updated · Data from NYC HPD

C
19open immediately hazardous violations · 63 per 100 apartments
B27Hazardous, open
A15Non-hazardous, open
!46Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company110 CONVENT BCR,LLC
Landlord (head officer or owner)Kobi Zamir

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    17
  2. Broken doors or locks
    12
  3. Peeling paint and plaster
    11
  4. Mold
    5
  5. No heat or hot water
    4
  6. Plumbing, sinks and toilets
    3
  7. Leaks and water damage
    3
  8. Roaches
    2
  9. Lead paint
    2
  10. Missing smoke or CO detector
    1
  11. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C58 days
from 31 closed · NYC typical: 87 days
B83 days
from 20 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · rent impairing · Violation #19347139
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective caulking at bathtub area at north, east and west walls in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19347135
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at basementIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19347132
  • B
    Other repairsReplace with new the missing radiator shut off valve at north wall in the 2nd room from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347137
  • B
    Other repairsReplace with new the missing radiator shut off valve at north wall in the 1st room from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347136
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Nov 4, 2026 · fix by Nov 18, 2026 · Violation #19347138
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 4, 2026 · fix by Nov 3, 2026 overdue · rent impairing · Violation #19347131
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192523
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192525
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain finish at bathtub in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192519
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192526
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192524
  • C
    Other repairsProperly repair or replace the broken or defective lower sash spring balance at the first window from north at east in the 3rd room from north at eastIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19192521
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19192522
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes pots and plants at 3rd story balcony at building front at fire…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19167838
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19167836
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · rent impairing · Violation #19167830
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19167831
  • B
    Other repairsRefit upper window sash at at south wall at intermediate landing at public hall stairs, 4th storyIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19167839
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash at south wall at intermediate landing at public hall stairs, 2nd storyIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19167840
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · rent impairing · Violation #19167835
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19167829
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower sash at 2nd window from north at east wall in the 3rd room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19167832
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued May 8, 2026 · fix by Jun 12, 2026 overdue · Violation #18877113
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 8, 2026 · fix by May 22, 2026 overdue · Violation #18877115
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of privacy door knob installed at door leading to fire escape window in the 3rd room from north at westIssued Apr 13, 2026 · fix by Apr 19, 2026 overdue · Violation #18778281
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Mar 6, 2026 · fix by Mar 12, 2026 overdue · Violation #18687446
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 27, 2026 · fix by Feb 25, 2026 overdue · rent impairing · Violation #18662730
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Feb 10, 2026 · fix by Feb 24, 2026 overdue · Violation #18632121
  • C
    Broken doors or locksProvide ready access to buildings heating system door is lock to cellar at boiler roomIssued Feb 10, 2026 · fix by Feb 16, 2026 overdue · Violation #18632120
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Feb 9, 2026 · fix by Feb 15, 2026 overdue · Violation #18627268
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from northIssued Jan 20, 2026 · fix by Jan 19, 2026 overdue · rent impairing · Violation #18579500
  • B
    Broken doors or locksProperly repair or replace the broken or defective lock at 1st and 2nd lower sash window at north wall in the 4th room from eastIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534907
  • B
    Broken doors or locksProperly repair or replace the broken or defective lock on lower sash at north wall in the kitchenIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534905
  • B
    Broken doors or locksProperly repair or replace the broken or defective lock at 1st and 2nd lower sahs window at north wall in the 3rd room from eastIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534906
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection wasteline pipe under washbasin in the bathroomIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534912
  • B
    Other repairsRefit upper and lower sash window at north wall in the bathroomIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534903
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Dec 30, 2025 · fix by Jan 5, 2026 overdue · Violation #18534920
  • B
    Other repairsProperly repair or replace the broken or defective intercom return system from building front to north wall in the private hallwayIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534913
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 23, 2025 · fix by Oct 23, 2025 overdue · rent impairing · Violation #18317555
  • B
    Other repairsProperly repair or replace the broken or defective intercom system from building entrance to north wall panel in the kitchenetteIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18294855
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 2 sq. ft. at ceiling in the bathroomIssued Nov 22, 2021 · fix by Dec 27, 2021 overdue · Violation #14695290
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 19, 2021 · fix by Aug 14, 2021 overdue · Violation #14411410
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 19, 2021 · fix by Aug 14, 2021 overdue · Violation #14411411
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold at ceiling (12 sq-ft) in the bathroomIssued Sep 24, 2018 · fix by Oct 29, 2018 overdue · Violation #12598056
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceilings kitchen and north wall ceiling bathroom and south wall 4 sty northeastIssued Sep 29, 1987 · fix by Oct 19, 1987 overdue · Violation #2453864

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

82017
492018
172019
612020
822021
752022
62023
22024
222025
862026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 481 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.