Housing violations · Concourse-Concourse Village
810 River Avenue, Bronx
10451 · 134 apartments · 17 stories · City Council district 16
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Roaches12
- Peeling paint and plaster8
- Plumbing, sinks and toilets6
- Mold4
- Missing smoke or CO detector4
- Other repairs3
- Electrical problems1
- Broken doors or locks1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 71 closed · NYC typical: 87 days
from 185 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19321653
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at waste line at wash basin in the 1st bathroom from east at southIssued Oct 26, 2026 · fix by Nov 30, 2026 · rent impairing · Violation #19321652
- CMoldTrace and repair the source and abate the visible mold condition ceiling and south wall greater than 10 sq ft in the bathroomIssued Oct 23, 2026 · fix by Nov 18, 2026 · Violation #19324390
- CMoldTrace and repair the source and abate the visible mold condition greater than 10.sq.feet at ceiling and at east wall in the bathroomIssued Oct 23, 2026 · fix by Nov 18, 2026 · Violation #19324389
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling,outlets and wall switches through-out in the entire apartmentIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19304296
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19304297
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 8, 2026 · fix by Nov 3, 2026 overdue · Violation #19288205
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 22, 2026 · fix by Oct 18, 2026 overdue · Violation #19233308
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 26, 2026 · fix by Sep 21, 2026 overdue · Violation #19160893
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130598
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130599
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19130597
- CMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19122143
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink basecabinet in the kitchenIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19097948
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel by method of re-glazing at bathtub in the bathroomIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19097910
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at wash basin in the 1st bathroom from northIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · rent impairing · Violation #19097921
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and west walls in the bathroomIssued May 19, 2026 · fix by Jun 23, 2026 overdue · Violation #18936744
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18818025
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18818026
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18715735
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamal finish by method of reglazing at bathtub in the bathroomIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18715731
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 1, 2025 · fix by Aug 27, 2025 overdue · Violation #18124006
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 24, 2025 · fix by Aug 19, 2025 overdue · Violation #18109582
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 21, 2025 · fix by Aug 16, 2025 overdue · Violation #18108177
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from eastIssued Jul 21, 2025 · fix by Aug 25, 2025 overdue · Violation #18108093
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 15, 2025 · fix by Jun 10, 2025 overdue · Violation #17894144
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820962
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 14, 2025 · fix by May 10, 2025 overdue · Violation #17820964
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet in the kitchenIssued Oct 15, 2024 · fix by Nov 19, 2024 overdue · Violation #17348707
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Jul 22, 2024 · fix by Aug 26, 2024 overdue · Violation #17127255
- BBroken doors or locksProperly repair with similar material the broken or defective upper wood cabinet doors at north wall in the kitchenIssued Jul 22, 2024 · fix by Aug 26, 2024 overdue · Violation #17127254
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 22, 2024 · fix by Aug 17, 2024 overdue · Violation #17127258
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.