Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Hunts Point

985 Bruckner Boulevard, Bronx

10459 · 215 apartments · 10 stories · City Council district 17

By · Updated · Data from NYC HPD

C
41open immediately hazardous violations · 19 per 100 apartments
B116Hazardous, open
A29Non-hazardous, open
!183Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company985 Bruckner Boulevard Owners LLC
Landlord (head officer or owner)Lorraine Coleman

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    48
  2. Other repairs
    31
  3. Roaches
    26
  4. Missing smoke or CO detector
    16
  5. Leaks and water damage
    16
  6. Broken doors or locks
    13
  7. Mold
    11
  8. Electrical problems
    11
  9. Plumbing, sinks and toilets
    9
  10. No heat or hot water
    3
  11. Lead paint
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C33 days
from 27 closed · NYC typical: 87 days
B122 days
from 27 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ftg. at ceiling in the bathroomIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19322689
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278527
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective frame at door leading to south section at public hall, 6th storyIssued Oct 8, 2026 · fix by Oct 22, 2026 overdue · Violation #19278528
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set and its assemblies at hopper chute door at compactor closet, 6th storyIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19275701
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at hopper chute door at compactor closet, 6th storyIssued Oct 7, 2026 · fix by Oct 21, 2026 overdue · Violation #19275700
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective frame at door leading to south section at public hall, 6th storyIssued Oct 7, 2026 · fix by Oct 21, 2026 overdue · Violation #19275699
  • B
    Broken doors or locksProperly repair or replace the broken or defective all base cabinets all doors and drawers missing and severe damage in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19243480
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the entire apartmentIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19243477
  • B
    Plumbing, sinks and toiletsReplace the broken or defective bathtub in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19243479
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of missing laminate floor plank in the foyerIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19243475
  • B
    Other repairsReplace the broken or defective water closet in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19243478
  • C
    Other repairsProperly repair or replace the broken or defective shattered glass pane creating cut hazard at 1st window from north at east wall in the 1st room from eastIssued Sep 25, 2026 · fix by Oct 1, 2026 overdue · Violation #19243474
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at washbasin in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19242366
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft. at east wall sink in the kitchenIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19242365
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of defective sprinkler head at ceiling in the foyerIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19215637
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19215635
  • C
    RoachesAbate the infestation consisting of roaches at compactor closet, 4th storyIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19215646
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from eastIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19215642
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19215644
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19215643
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of defective sprinkler head at west wall in the 1st room from eastIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19215641
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19215640
  • B
    Other repairsProperly repair or replace the broken or defective window panel at east wall in the 1st room from eastIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19215639
  • B
    Other repairsRefit window panel at east wall in the entire apartmentIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19215636
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch and its assembily at door in the entranceIssued Jul 1, 2026 · fix by Aug 5, 2026 overdue · Violation #19043338
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch in the entranceIssued Jul 1, 2026 · fix by Jul 15, 2026 overdue · Violation #19043337
  • B
    Other repairsProperly repair with similar material the broken or defective the fire retardant material at ceiling at public hall, 4th storyIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19020948
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling at public hall, 4th storyIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19020947
  • B
    Other repairsProperly repair with similar material the broken or defective the fire retardant ceiling and all walls at public hall, 1st storyIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19020945
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the 2nd room from east at southIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19020942
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchenetteIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19020943
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroomIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19020940
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the 2nd room from east at southIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19020941
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling at public hall, 1st storyIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19020944
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the bathroomIssued Jun 17, 2026 · fix by Jul 22, 2026 overdue · Violation #19008385
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the bottles, garbage, rubbish (throughout) at treads and landing (staircase…Issued Jun 17, 2026 · fix by Jul 22, 2026 overdue · Violation #19008386
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the kitchenetteIssued Jun 17, 2026 · fix by Jul 22, 2026 overdue · Violation #19008384
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 2nd room from eastIssued Jun 17, 2026 · fix by Jul 22, 2026 overdue · Violation #19008383
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage, rubbish, bottles (throghout) at staircase b (north section) at…Issued Jun 17, 2026 · fix by Jul 22, 2026 overdue · Violation #19008382
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 26, 2026 · fix by Jun 21, 2026 overdue · Violation #18951380
  • B
    Plumbing, sinks and toiletsProperly secure the loose faucet at wash basin in the bathroomIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18953202
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenetteIssued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18929084
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at the bathtub in the bathroomIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18878678
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18878679
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18878680
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroomIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18878675
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sq ft at ceiling in the bathroomIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18889354
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18719155
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18719156
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroomIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18719152
  • B
    Broken doors or locksProperly repair with similar material the broken or defective entrance door in the bathroomIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18719154
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 29, 2026 · fix by Feb 24, 2026 overdue · Violation #18597369
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 23, 2026 · fix by Jan 23, 2026 overdue · rent impairing · Violation #18587932
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 23, 2026 · fix by Feb 18, 2026 overdue · Violation #18587933
  • B
    Electrical problemsProperly repair or replace the broken or defective electical outlet at north and south walls in the 3rd room from eastIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18569435
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical switches at south and north walls in the 2nd room from eastIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18569434
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical switch at north wall in the 1st room from eastIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18569433
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at west wall in the kitchenetteIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18571268
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18548876
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18548875

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

82020
42021
102022
392023
482024
932025
792026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 282 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.